1.Inspections
Pre-Construction Meeting
Permits
Maintenance of Traffic
Lane closures/detours
Progress schedule
Required Transmittals
Pavement design
Source of Materials
Required inspections and
testing
2.Material used
3.Inspections and
Testing
(a)SUBGRADE
Proof roll subgrade
Undercut any unsuitable or
failing areas/stabilize
materials (if required)
Backfill of undercut area
with approved materials
Perform appropriate
moisture and density
testing
Verify approved typical
section.
(b)SUB-BASE
Proof roll
Remove/correct any
undulating areas
Perform appropriate
moisture and
density tests
Verify approved
typical section
Verify stone depths
(c)FORM WORK
(if required)
Ensure forms are clean
and oiled
Ensure flanges are not
bent
Ensure forms are
sufficiently braced
Check vertical and
horizontal alignment of all
forms
Perform depth checks
(d.)Continuously Reinforced
Concrete Pavement
(e.)Alternatives
Pre-cast Concrete Pavement
(F)Inspections
CONCRETE PLACEMENT
Prior to placement ensure
appropriate expansion joints
Testing for slump and air
Rate:
Make control/lab cylinders
Ensure concrete is cured
properly and in accordance with
approved method.
Verify temperatures, dispatch
times, cold joints
(G)Alternatives
Continuous Concrete Pavement
(H)Alternatives
Roller Compacted Concrete Pavement
(I)Curing
Curing requires adequate
Moisture
Temperature
Time
If any of these factors are
neglected, the desired
properties will not develop