- Case study
-- Nandan Pathak (AE)
ICT -2
ICT -1
200 MW
160 MVAR
200 MW
160 MVAR
G-3
G-4
160 MW
135 MVAR
G-5
160 MW
135 MVAR
220 kV Parli
Bus
220 kV
Girwali Bus
LOAD
160 MW
140 MVAR
LOAD
GENERATION
LOAD:
870 MW
730 MVAR
A ) GENERATORS:
a) High MVAR drawl
b) High excitation current
B) ICT:
a) Overloading due to MVAR
b) Low voltage on 220 kV bus ( 200 kV)
C) LOAD:
11 kV side:
a) Overload tripping
b) Very low voltages
c) Conductor snapping
d) Local load shedding
440 V side:
a) Failure of transformers
b) Conductor snapping
A) Identification of areas
a) Beed district
b) Solapur district
c) Nanded district
d) Pabhani district
e) Latur district
220 kV
Girwali Bus
220 kV Nanded
160 MW 100 MVAR
220 kV Parbhani
100 MW 80 MVAR
132 kV Parli
Bus
132kV Beed
80 MW 60 MVAR
132 kV
Girwali Bus
132 kV Latur -1
90 MW 75 MVAR
132 kV Latur -2
60 MW 45 MVAR
4. On site demonstrations
5. Team visit Nasik , Pune (R ),
Kolhapur, Sangli,Parbhani
LT
105 Volts to 190 volts
11kV 7.6 kV to 9.8 kV
ICT -2
ICT -1
250 MW (200)
100 MVAR(160)
250 MW(200)
100MVAR(160)
G-3
G-4
G-5
195 MW(150)
80 MVAR(140)
220 kV Parli
Bus
220 kV
Girwali Bus
LOAD
LOAD
GENERATION
~
Voltage changes:
220 kV
132 kV
33 kV
LOAD:
1095 MW (870)
400 MVAR (730)
132 kV
Girwali
Bus
132 kV Latur 2
132 kV Latur 1
105 MW 40 MVAR 70 MW 30 MVAR
(90 MW 75 MVAR) (60 MW 45 MVAR)
~
132 kV
Parli Bus
132kV Beed
95 MW 30 MVAR
(80 MW 60 MVAR)
KWH recorded on 11kV Matkuli feeder from 132 / 11 kV T/F at 132 kV Ashti substation
MONTH
January
February
March
April
May
June
July
August
September
October
November
December
KWH 1998
791500
545000
667900
539400
512000
164400*
313900
310400
330600
500300
530400
307300*
KWH 1999
1101100
938100
819800
790900
473200
459800
1170300
948000
630400
706100
854700
1104100
KWH 2000
1014800
699100
663300*
87400*
-*
167700*
442100
490900
342700
350100
626000
542000
KWH 2001
401700
239400
262200
183400
275400
43800**
---Load shifted to another feeder --- Load of other feeder taken on this feeder
** --- kWh meter stopped due to leading PF
Note:
0.6 MVAR capacitor bank recommissioned at village Pandharee on Dt.28.11.2000
0.6 MVAR capacitor bank added at same location on Dt.4.12.2000
New 0.6 MVAR capacitor bank commissioned at Pokharni Phata on Dt.8.12.2000
Ju
Se
us
t
pt
em
be
r
Oc
to
be
No
r
ve
m
be
De
r
ce
m
be
r
ly
Ap
ril
M
ay
Ju
ne
M
ar
ch
ry
ar
y
br
ua
nu
Au
g
Fe
Ja
1200000
1000000
800000
1998
600000
1999
2000
400000
2001
200000
Savings
(kWH)
Remark
Dec 2000
689997
542000
147997
21.45
Jan 2001
624172
401700
222472
35.60
Feb 2001
520905
239400
281505
54.00
Mar 2001
562029
265200
296829
52.00
Apr 2001
511766
183400
328366
64.10
May 2001
451451
275400
176051
39.00
Total
3360320
1907100
1453220
43.24