Mill inspection. Technical services Tube mill audit Process flow sheet of the milling system with gas and material flow.
Auxiliary equipment characteristics as per following table.
Tube mill general dimensional data and historical data of mill internals retrofitting.
Major difficulties limiting performance of system. (Mill is consuming higher power, mill is not achieving its rated capacity etc.) Equipment Type Make Power (KW) Critical dimensions Output (TPH) Rated Actual Rated Actual Suction fan ABB 40 35 60,000 cum/hr Bucket elevator Chain BHA 30 40 25m hight 100 80 INFORMATION REQUIRED BEFORE HAND Technical services Tube mill audit DATA TO BE COLLECTED FROM SITE Manual check at site :
Mill RPM - Matching with design value. Sound level of the mill. - Matching with control room value. Ventilation at inlet of the mill. - High,Medium,Less,No Damper position of all the fans. - Matching with control room value. Leakages from the mill, circuit. - High, Less and where, No leakages. Feed condition. - Matching with design value. Mill motor power meter. - Matching with control room value. Technical services Tube mill audits Collect the trend data of circuit parameters: FM#6 log sheet of last 24 hrs. 0.00 50.00 100.00 150.00 200.00 250.00 8/20/2003 19:12 8/21/2003 0:00 8/21/2003 4:48 8/21/2003 9:36 8/21/2003 14:24 8/21/2003 19:12 8/22/2003 0:00 Parameters H O u r l y
r e a d i n g s 4000.00 4100.00 4200.00 4300.00 4400.00 4500.00 4600.00 4700.00 4800.00 4900.00 Sep power BE Kw Sep Speed Mill o/l draft Out temp Mill fan Kw S Fan X 10 Sep damper Mill damper D dust fan D dust damper Rej TPH Feed TPH Mill motor Technical services Tube mill audits DATA TO BE COLLECTED FROM SITE A B C D E F G H A,B,C : Feed sample :10 kg 1 test D-H : Circuit sample : 0.5kg 3 times every 2 hours
Technical services Tube mill audits DATA TO BE COLLECTED FROM SITE CIRCUIT SAMPLE Sample Quantity Particle size analysis, sieves, moisture A Clinker 10 [kg] 50, 25, 16, 8, 4, 2, 1, [mm] B Gypsum 10 [kg] 50, 25, 16, 8, 4, 2, 1, [mm] + %H2O C Other add. 10 [kg] 50, 25, 16, 8, 4, 2, 1, [mm] + %H2O D Mill outlet E Separator reject F Separator product 0.5 [kg] 212m,90m,45m, Blaine manual ~1- 200 [m] Laser G Filter product H Finish product Technical services Tube mill audits DATA TO BE COLLECTED FROM SITE ANALYSIS OF SAMPLES MILL INSPECTION Crash stop.
Chamber sampling.
Internal dimensions.
Internal inspection. Technical services Tube mill audits The crash stop must be made on stable operation of the mill and circuit. Crash stop means simulateneous stappage of: Mill feed Mill Mill fan
Technical services Tube mill audits MILL INSPECTION CRASH STOP Chamber I Chamber II 1 2 3 4 5 1 2 3 4 5 6 Dig around deep transverse trench inside the grinding media at each sample location.
1-2 Kg sample at each point Get samples from the level of grinding media.
0.5 Kg sample at each point 50 cm 100 cm 150 cm 50 cm Technical services Tube mill audits MILL INSPECTION CHAMBER SAMPLES MILL INSPECTION - SIEVES IN CHAMBER SAMPLE ANALYSIS % residue accumulated Sieve [mm] Blaine Sample 16 10 5 2.5 1 0.5 0.2 0.12 0.09 0.045 cm2/g 1. Chamber 1 2 3 4 2. Chamber 5 6 7 8 9 10 11 Technical services Tube mill audits Technical services Tube mill audits MILL INSPECTION INTERNAL DIMENSIONS Empty running condition Material lacking condition Optimum material level Higher material level Technical services Tube mill audits D i r e c t i o n
o f
r o t a t i o n
D i r e c t i o n
o f
r o t a t i o n
D i r e c t i o n
o f
r o t a t i o n
D i r e c t i o n
o f
r o t a t i o n
MILL INSPECTION MATERIAL LEVEL Head liner : Remaining thickness min. 40mm for HiCr Preferential wear check 1 st chamber liner : Breakage, Lost plate, Coating on liner Residual lifting height : 50% Bolt breakage Grinding media both chamber : Breakage, Wear, De-shaping Maximum and minimum size of GM Coating on grinding media 2 nd chamber liner : Breakage, Lost plate, Coating on liner Residual thickness : 50% Bolt breakage Diaphragm slot and blind plate : Remaining thickness minimum 25mm. Slot chocking, Breakage or crack, Preferential Wear, Coating on Liner Diaphragm structure: Gaps between structure, Bolt breakage, Crack on structure, Flexibility, Level controlling device Technical services Tube mill audits MILL INSPECTION WEAR CONDITION