10 of 10 1 RADAR Search and Weather Radar (AN/APN-59) > 10 of 10 Checks After this lesson we will be able to understand
To Connect eternal power unit Complete Operation check of Search and Weather Radar. 2 RADAR Search and Weather Radar (AN/APN-59) > 10 of 10 Foreign Object Damage Preventable Non-Preventable ( hail, ice, animals, material failure) RADAR Search & Weather Radar Sys (APN-59) > FOD 10 of 10 3 RADAR Search and Weather Radar (AN/APN-59) > 10 of 10 4 Personnel Safety
Safety harness should be worn when removing and installing antenna Search and weather Radar (APN-59) >Safety RADAR 4 RADAR Search and Weather Radar (AN/APN-59) > 10 of 10 CAUTION
Ensure that the DC power supply output does not exceed 115 VAC and 27 VDC at any time as to ensure that the displays are not damaged
CAUTION
Ensure system power is OFF before removal or installation of control panel. This will prevent component damage caused by voltage spikes
5 RADAR Search and Weather Radar (AN/APN-59) > 10 of 10
Discrepancy Stab switch U/S.
Cause
Sys Ops Checked On Ground Found Working Normal. Remedial Action
Complete wiring checked all plugs security checked found sat. Entry subjected to next pilot report. 6 Search & Weather Radar Sys (APN-59) > Defect 10 of 10 WXR RADRA CONT PNL RADAR RADAR Search and Weather Radar (AN/APN-59) > 10 of 10 You went to shop to purchase TV, how you will be satisfied that this TV is serviceable ?
a After checking of all TV functions only
b After checking of physical damage of TV only
c After checking of physical damage and functions of TV
d Believe on shopkeepers statement Q & A 7 RADAR Search and Weather Radar (AN/APN-59) > 10 of 10 Checks Visual operational check procedure
Connect eternal power unit 8 RADAR Search and Weather Radar (AN/APN-59) > 10 of 10 Visual operational check procedure Pre procedure warning
Before starting the AN/APN-59 Transmitter, ensure that
Hazard warning signs are posted 40 feet from nose radome
In 40 feet area
No personnel grouping
Powered AGE removed 9 Checks RADAR Search and Weather Radar (AN/APN-59) > 10 of 10 Visual operational check procedure Pre procedure warning
Before starting the AN/APN-59 Transmitter, ensure that
External power position
Upwind from the A/C fuel vent sys
Distance 50 feet from A/C
10 Checks RADAR Search and Weather Radar (AN/APN-59) > 10 of 10 Visual operational check procedure Pre procedure warning
Before starting the AN/APN-59 Transmitter, ensure that
Dont point the energy beam toward inhibited structures or other personnel grouping 11 Checks RADAR Search and Weather Radar (AN/APN-59) > 10 of 10 Visual operational check procedure Initial Control Position On C-1242 / AN/APN-59 RANGE Knob on 3-30/1
FUNCTION Switch on OFF
TEST Meter Knob on LINE
SCAN OFF
HDG SEL on Zero
GAIN Fully CCW 12 Checks RADAR Search and Weather Radar (AN/APN-59) > 10 of 10 Visual operational check procedure Initial Control Position On C-1242 / AN/APN-59 TILT Zero
STC CCW
STAB OFF
FTC OFF
IAGC OFF
PATT on FAN
BEARING STAB on REL 13 Checks RADAR Search and Weather Radar (AN/APN-59) > 10 of 10 Visual operational check procedure Time delay check
Function switch on STDBY
Allow 3 to 5 minutes warm up time 14 Checks RADAR Search and Weather Radar (AN/APN-59) > 10 of 10 Visual operational check procedure Time delay check On test meter
Indication 0.6 0.2 mill ampere and steady 15 Checks RADAR Search and Weather Radar (AN/APN-59) > 10 of 10 Visual operational check procedure Time delay check
Note Make sure HD 150 vaneaxial fans are operating properly 16 Checks RADAR Search and Weather Radar (AN/APN-59) > 10 of 10 Visual operational check procedure Magnetron current check Function switch on SEARCH
Test meter switch to MAG
Select each range one by one and observe
Indication between 0.4 and 0.8 mill ampere and steady 17 Checks RADAR Search and Weather Radar (AN/APN-59) > 10 of 10 Visual operational check procedure Mixer and AFC current check RANGE switch on 3- 30/5
TEST METER switch to MIXER 1 and 2 and AFC 1 and 2 one by one
Indication between 0.4 and 0.8 mill ampere
Reading must balance within 0.2 mill ampere of each other 18 Checks RADAR Search and Weather Radar (AN/APN-59) > 10 of 10 Visual operational check procedure Preliminary Indicator check
RANGE switch on 3- 30/1
Adjust INST control on both indicators CW until sweep just appear
Adjust RANGE MKS control CW until range marks just appear 19 Checks RADAR Search and Weather Radar (AN/APN-59) > 10 of 10 Visual operational check procedure Preliminary Indicator check
Observe on indicators
Trace appear
2 to 3 range marker
3-30/1 lamp ON
20 Checks RADAR Search and Weather Radar (AN/APN-59) > 10 of 10 Visual operational check procedure range Marks and Range Lamps check On C/Unit Select different ranges
On indicators 3 30 control CCW
Observe on indicator RANGE # of range marks 3-30/1 2 or 3 3-30/5 None 50/10 4 or 5 100/20 5 or 6 240/30 8 or 9 21 Checks RADAR Search and Weather Radar (AN/APN-59) > 10 of 10 Visual operational check procedure range Marks and Range Lamps check On C/Unit Range SW on330 /1
On indicators 3 30 control CW
Observe on indicator
o Minimum 25 range marks
Note If strobing is encountered, rotate range 3-30 control CCW turn
22 Checks RADAR Search and Weather Radar (AN/APN-59) > 10 of 10 Visual operational check procedure Sweep Delay Circuits check
On C/Unit
SCAN on PPI
On indicators
Sweep rotate CW 457
Rotate RANGE DELAY Control slowly in CW and observe
Variable range mark ring should appear as an expanding circle 23 Checks RADAR Search and Weather Radar (AN/APN-59) > 10 of 10 Visual operational check procedure Sweep Delay Circuits check
On indicator
RANGE DELAY SW ON
Rotate RANGE DELAY Control fully CCW
3-30 control fully CW and observe
o 3-30 lamp and TD lamp illuminate
24 Checks RADAR Search and Weather Radar (AN/APN-59) > 10 of 10 Visual operational check procedure Focus controls check
On indicator
Adjust FOCUS control to obtain sharp trace 25 Checks RADAR Search and Weather Radar (AN/APN-59) > 10 of 10 Visual operational check procedure Sweep rotation check
On C/Unit
Bearing SW on REL
On indicator
On Main Instrument panel indicator S-R SW to R position
Sweep rotate CW direction (RPM 45 7) on both indicators 26 Checks RADAR Search and Weather Radar (AN/APN-59) > 10 of 10 Visual operational check procedure Sweep rotation check
On indicator
On Main Instrument panel indicator S-R SW to S position
Sweep rotate CW direction (RPM 45 7) on both indicators 27 Checks RADAR Search and Weather Radar (AN/APN-59) > 10 of 10 Visual operational check procedure Sweep rotation check
On C/Unit
Bearing SW on STAB
On indicator
Sweep rotate CW direction (RPM 45 7) on both indicators 28 Checks RADAR Search and Weather Radar (AN/APN-59) > 10 of 10 Visual operational check procedure Heading marker check
On C/Unit
Bearing SW on REL
On indicator
Heading marker control fully CCW and observe
Bright heading marker appear at 0 2 on both indicators 29 Checks RADAR Search and Weather Radar (AN/APN-59) > 10 of 10 Visual operational check procedure Gain Control circuit check
On C/Unit
Rotate gain control CW and observe
On indicator
Noise level increases 30 Checks RADAR Search and Weather Radar (AN/APN-59) > 10 of 10 31 Personnel Safety
Safety harness should be worn when removing and installing antenna Search and weather Radar (APN-59) >Safety RADAR 31 RADAR Search and Weather Radar (AN/APN-59) > 10 of 10 CAUTION Ensure that the DC power supply output does not exceed 115 VAC and 27 VDC at any time as to ensure that the displays are not damaged
CAUTION Ensure system power is OFF before removal or installation of control panel. This will prevent component damage caused by voltage spikes
32 RADAR Search and Weather Radar (AN/APN-59) > 10 of 10 SUMMARY To Connect eternal power unit to Aircraft Complete Operation check of Search and Weather Radar (APN-59).
Search and weather Radar (APN-59) > 10 of 10 RADAR 33 RADAR Search and Weather Radar (AN/APN-59) > 10 of 10 Q & A 34 RADAR Search and Weather Radar (AN/APN-59) > 10 of 10 Q. SCAN switch On PPI and mode switch on WRN, Antenna RPM will be
a 45 7
b 10 to 15
c Depend on target range
d Depend on target mode 35 Q & A RADAR Search and Weather Radar (AN/APN-59) > 10 of 10 If radar range is 3-30/5 is selected on control panel and 3-30 control on IP-239 indicator is fully CCW, how many range marks appear on indicator ?
a 2 or 3
b None
c 4 or 5
d 5 or 6 36 Q & A RADAR Search and Weather Radar (AN/APN-59) > 10 of 10 AN/APN-59 radar system S/R function is active on ?
a IP-239 indicator installed on main instrument panel
b IP-268 indicator installed on main instrument panel
c IP-239 indicator installed on Navigator station
d IP-268 indicator installed on Navigator station 37 Q & A RADAR Search and Weather Radar (AN/APN-59) > 10 of 10 In AN/APN-59 radar system HDG SEL knob is effective when?
a STAB switch is on STAB position
b BEARING STAB switch is on REL position
c BEARING STAB switch is on STAB position
d STAB switch is in down position 38 Q & A RADAR Search and Weather Radar (AN/APN-59) > 10 of 10 39 End