Power Sector Northern Region PARAMETER BUDGET RE ACTUAL % ACHIEVED RSC-VARANASI GROSS TURNOVER 2000 1641 2011.12 100.56% CASH COLLECTION 1700 1873.50 110.20% All Figures in Rs Lacs ACHIEVEMENT 2013-14 : AS ON 31.03.2014 Power Sector Northern Region PARAMETER BUDGET RE ACTUAL % ACHIEVED OBRA R&M GROSS TURNOVER 625 420 422.29 67.56% CASH COLLECTION 361 356.62 92.98% OBRA R&M [7&8] GROSS TURNOVER 572 211 91.92 16.06% CASH COLLECTION 270 0.00 0% RIHAND R&M GROSS TURNOVER 30 52 70.42 234.73% CASH COLLECTION 14 50.80 362.86% All Figures in Rs Lacs PROJECTION FOR FY 2014-15
Power Sector Northern Region PARAMETER BE FY-2014-15 RSC-VARANASI GROSS TURNOVER 1000 OBRA R&M GROSS TURNOVER 900 OBRA 7 & 8 GROSS TURNOVER 740 RIHAND R&M GROSS TURNOVER 40 SINGRAULI ESP R&M GROSS TURNOVER 350 TOTAL 3030 All Figures in Rs Lacs BHEL, RSC-VARANASI CURRENT YEAR PERFORMANCE AS ON 31.03.2014 Power Sector Northern Region ORDER BOOKED (FY 2013-14)
Rs. LAKHS CUSTOMER/PROJECT WORK AMOUNT NTPC/SINGRAULI STPS Turbine & Generator 48.13 NTPC/TANDA Turbine & Generator 239.45 NTPC/UNCHAHAR TPS Turbine & Generator 98.87 NTPC/RIHAND STPS Turbine 222.52 UPRVUNL/ANPARA TPS Turbine & Boiler 635.39 UPRVUNL/PANKI TPS Turbine & Boiler 117.72 UPRVUNL/OBRA TPS Turbine & Boiler 452.70 PIPRI/UPJVUNL 60.00 TOTAL 1874.78 BHEL, RSC-VARANASI Power Sector Northern Region ORDER BOOK (FY 2014-15)
Rs. LAKHS CUSTOMER/PROJECT WORK AMOUNT PREVIOUS YEAR CARRY FORWARD NTPC/UNCHAHAR TPS Turbine & Generator 24.00 NTPC/RIHAND STPS Turbine 105.0425 UPRVUNL/OBRA TPS Boiler 210.99635 TOTAL 340.03885 CURRENT YEAR UPRVUNL/PANKI TPS Turbine & Boiler 1.93113 TOTAL 1.93113 EXPECTED ORDERS 500 GRAND TOTAL 841.96998 MILESTONE SCHEDULE : PLAN & ANTICIPATED SL. PROJECT/ UNIT No. MW Actual Days Contractual Days Advance / On Time Completio n Remarks 1 ANPARA # 1 210 11 15 4 27.04.13 Revisioning of hydrogen seals 2 ANPARA # 1 210 135 33 Demoblisation and re mobilisation due to civil work done by customer
16.10.13 Restorationof Unit # 1 3 ANPARA # 3 210 30 30 0 12.12.13 Boiler & TG 4 ANPARA # 5 500 31 35 4 07.03.14 Boiler &HP Heater 5 OBRA # 9 200 32 25 Extra work done 21/12/13 Inspection of Stator and Brgs 6 PANKI # 4 105 13 18 5 16.10.13 Replacement of Exciter Armature & Additional Testing works Power Sector Northern Region 1/6 MILESTONE SCHEDULE : PLAN & ANTICIPATED SL. PROJECT/ UNIT No. MW Actual Days Contractual Days Advance / On Time Completion Remarks 7 PIPRI # 4 50 29 55 26 14.06.13 Extra Work 8 RIHAND #3 500 31 40 9 11.10.13 O/H of Generator & Additional work of Rotor Replacement 9 SINGRAULI # 3 210 14 15 1 23.04.13 Servicing of Governing System 10 SINGRAULI#6 500 6 15 9 26.04.13 Repairing of Gen Exciter (Services & supply Portion) 11 TANDA # 1 110 49 50 1 23.10.13 Cap. O/H of U#1 TG and Aux Power Sector Northern Region 3/6
OUR ESTEEMED CUSTOMERS OTHER CUSTOMERS (INDUSTRIAL & HYDRO SETS) CUSTOMER / PROJECT 12.5 MW 18 MW 22.4 MW 33 MW 50 MW TOTAL UNITS MW UPJVNL/RIHAND HYDRO 6 6 300 IFFCO / PHULPUR 2 1 3 43 KSFL/SHAHJAHANPUR 2 2 44.80 UPRVUNL/OBRA HYDRO 3 99.00 TOTAL 2 1 2 6 6 11 486.80 Power Sector Northern Region SOME OF THE TROUBLE SHOOTING JOBS CARRIED OUT HIGH CHRONIC VIBRATION AT ANPARA U#1
Severe Axial & Vertical vibration in Brg # 5 & Brg # 6 Pedestals. High Vibrations were also noted in Stator Endshield and water header and increased seal oil flow. Vertical vibrations suddenly increased above 50 s and axial above 120 s & machine had to be debarred
Spectrum recorded showed sever 2x components and other higher frequency components & mapping was carried out CONCLUSION: VI BRATI ON I NDUCED WERE FOUNDATI ON I NDUCED AND ELECTRI CAL I N NATURE
CRACKS WITNESSED IN COLUMN
CRACKS WITNESSED IN BRG # 6 PEDESTAL
ACTION TAKEN 1. REPLACEMENT OF ROTOR AND BRG # 4&6 2. REGROUTING OF SECONDARY FOUNDATION OF BRG 6 PEDESTAL AND STRENTHENING OF COLUMN NO 11& 12
RESULTS : MACHINE SUCESSFULLY SYNCHRONISED WITH VIBRATIONS OF SHAFT BELOW 60 MICRONS PK-PK AND PEDESTAL BELOW 30 PK-PK IN ALL BRGS
MOULDS PREPARED FOR TEST & ITS TESTING
HEAVY SPARKING AT EXCITER IN UNIT#4, PANKI (105MW) Heavy Sparking in exciter commutator of Unit # 4 Panki TPS was reported and soon the problem rose to alarming level and machine had to be debarred on June 21 2013. Vibrational analysis and electrical test were carried out by UPRVNL and based on that following were suggested. 1)Undercutting of mica on the commutator 2)Carrying out the drop test on the commutator segments and on pole pitch apart & grrove chamfering and maintaining geometric axis 3)Checking the commutator for non uniformity, all the brush holders for their correct spring pressure and he usage of correct grade of carbon brush. Results : The sparking though reduced but still was not resolved completely.
ACTION TAKEN BY RSC VARANASI RSC ENGINEER VISITEDTHE SITE AND FOUND THAT THE UNDERCUTTING & GOOVE CHAMFERING WERE IMPROPER AND STILL DEMANDED MORE BUT THE COMMUTATOR BEING OLD AND REUSED CONTINOUSLY RAISED SUSPICIONS OVER POSSIBILITY OF FURTHER UNDERCUTTING DAMAGING THE INSUALTION. THE EXCITER ARMATURE WAS SUGGESTED FOR REPLACEMENT AND UNIT WAS BROUGHT BACK TO BAR WITHIN 7 DAYS.
CHRONIC AXIAL VIBRATION PROBLEM AT NTPC UNCHAHAR U#3 (210MW) High axial vibration of LPT Rear Bearing in U# 3. with values above 50s and velocity around 20 mm/sec The spectrum analyses revealed unloading of Brg # 4. ACTION TAKEN 1. CATENARY & DECK CORRECTION AND ALIGNMENT 2. DESTRETCHING & STRETCHING OF FOUNDATION BOLTS REAR BOLT WAS STRETCHED TO 2.43 AND THE FRONT BOLTS TO 2.30 DEVI ATI NG FROM THR NORMAL APPROACH OF STRETCHI NG THE FRONT TO A HI GHER AS COMPARED TO REAR TO ENSURE PROPER LOADI NG AS PER SPECTRUM RESULTS The axial vibration reduce to below 25 microns & Velocity to less than 8 mm/sec.
LPT REAR BEARING VIBRATION IN U#3
70
60 50
40
30
20
10
0
Measurement Samples
Axial Vertical
PEDESTAL 4 BOLT STRETCHING,U#3
SEVERE EARTH FAULT AT DEVIGHAT NEPAL (MACHINE BROUGHT TO GRID WITHIN 20 DAYS) NEA had reported about the earth fault of stator Unit # 2, Devighat. BHEL RSC Varanasi engineer reported at site for attending the earth fault. Observations:Fault severe in nature resulting melting of overhang portion of two coils of B phase & burning down of insulation of the nearby three other coils. Constraints : Space constraint on removal of poles & Time constraint for removal of rotor Solution: Stator Removal Causing Both Time, Cost and Work easier
Solution: Stator Removal Causing Both Time, Cost and Work easier Machine Re-levelled, aligned and Brought Back to Grid on 20 th Day with better running parameters compared to other running Units After replacement of the individual coils HV of the new coils were carried out at 14.2 KV for 1 minute. After finalization of the stator the HV of all coils/phases was carried out at 9Kv in two parts and IR and PI taken
SEVERE EARTH FAULT AT DEVIGHAT NEPAL (MACHINE BROUGHT TO GRID WITHIN 20 DAYS) U# 2 with better vibration