LAGUNA LAKE DEVELOPMENT AUTHORITY

Consultation Meeting

12 November 2009
Legend Hotel Villas, Mandaluyong City
LAGUNA LAKE DEVELOPMENT AUTHORITY

Laguna de Bay
Institutional
Strengthening and
Community
Participation Project
LISCOP –
5-yr development initiative of LLDA

With co-financing support from the


Netherlands Government Grant
and World Bank Loan

Envisioned to support the sustainable


management of the Laguna de Bay Basin
COMPONENT 1:
Co-Managed Investments for
Watershed Development

Improve the environmental quality


in the region by engaging
LGUs/stakeholders in implementing
environmental sub-projects.
COMPONENT 2:
Strengthening Institutions
and Instruments

Ensure that Laguna de Bay and its


watershed are managed effectively and
in a sustainable manner by
strengthening the capacity of institutions
in environmental governance.
Mission No. 1

Harness and
deepen
stakeholders

participation
in micro-
watershed
environment
Mission No. 2
Implement direct
and
strategic micro-
watershed level
interventions that
would contribute
towards
improvement of
the quality of the
Laguna de Bay
and its watershed
Mission No. 3
Strengthen LGU’s
self-governance
and reinforce
inter-LGU
cooperation in
the
environmental
The 34 Pipeline Sub-Projects in 22 municipalities
generated from 15 out of 24 micro-watersheds
which have undergone LEAP

= Covered subprojects
SUB-PROJECTS IN RIZAL PROVINCE

= Covered subprojects
Tanay Micro-Watershed Enhancement Sub-Project (P 30.6 M)

Key Components:
Streambank stabilization
Flood Control
Ecological enhancement
Reforestation
Livelihood
Coop Formation
Pollution management
MRF
Rehab of dumpsites Katutubo Village

Pavilion

Status: Operation
Teresa MRF w/ Composting Sub-Project (P
8.1 M)
Production Area

Windrows/toxic & hazardous area

Bricks from wastes


White charcoal Eco garden

Status: Operation
Morong MRF with Composting Sub-Project ( Php
9.9 M)

Admin Bldg

Production Area

Training on the use of the


shredder

Status: Operation
Baras Flood Control Sub Project (P
10.0 M)

Status: Construction
Stage
Taytay Flood Control Sub-Project ( Php
10.0 M)

Status: Construction
stage
(1)Angono Material Recovery Facility (Php 11
M) and (2) River and Lakeshore Protection Sub-
Projects

Status: (1)Pre-operation (2) MDFO approval


SUB-PROJECTS IN LAGUNA PROVINCE

= Covered subprojects
Kalayaan Integrated Solid Waste Management Sub-Project
(P 11.2 M)

Sanitary Landfill Category 1

Status: Operation Stage


Sta. Cruz Integrated Waste
Management Sub-Project (P 10.4 M)

Material Recovery Facility

Waste Water Treatment Facility

Status: 100%
completed Testing
Status: Operation Stage
Stage
Majayjay Falls Eco-Tourism Sub-Project (P
34.8 M)

Administration Building

Hanging bridge

Picnic huts; overnight


accommodations,
function rooms

Status: Pre-Operation Stage


Cavinti Eco-Tourism Sub-Project (P
13.8 M)

Status: Operation Stage


Liliw Community-Based Solid Waste
Management Sub-Project (P 4.3 M)

Status:
Operation
Siniloan Environmental Enhancement
Sub-Project (Php 4.0 M)

Status: MRF:Pre-Operation
Stage
Nagcarlan Integrated Waste
Management Sub-Project ( Php 5.0
M)

ACCESS ROAD

MRF

MRF

WWTF

Status: Pre-Operation Stage


Pila MRF with Victoria MRF with
Composting (P6.0 M) Composting (P5.3 M)

Status: Pre-Operation Stage


Pangil Environmental Enhancement Sub-Project
(P23 M)

MRF Site

Status: Construction
Pakil Environmental Enhancement Sub Project (P
10M)

Eco-tourism Site

MRF Site

Status: Procurement of Civil


Mabitac MRF with Composting SubProject
(P 5 M)

Status: Construction
SUB-PROJECTS IN CAVITE PROVINCE

= Covered subprojects
GMA Cluster Material Recovery &
Composting Facilities Sub-Project (P
16.6 M)

Status:Construction Stage
TYPES OF SUBPROJECTS

Flood Control = 3 Eco-tourism = 6

Waste Management = 25
STATUS OF BATCH 1 SUB-PROJECTS

100
90
80
70
60
% Accom 50
40
30
20
10
0
1 2 3 4 5 6 7 8 9 10 11
No. of LGUs

Tanay; 2. Teresa 3. Morong 4. Liliw 5. Cavinti 6. Majayjay 7. Nagcarlan 8. Siniloa


2. 9. Sta Cruz 10. Kalayaan 11. GMA

17 Sub-projects in 10 municipalities = COMPLETED


1subproject in 1 municipality = UNDER CONSTRUCTION
STATUS OF BATCH 2 SUB-PROJECTS

100
90
80
70
60
% Accom 50
40
30
20
10
0
1 2 3 4 5 6 7 8
No. of LGUs

Angono; 2: Taytay 3: Pila; 4 Pangil; 5: Victoria 6. Baras; 7: Mabitac 8: Pa

4 Sub-projects = COMPLETED
3 Subprojects = SUBSTANTIALLY COMPLETED
2 Sub-projects = PRE CONSTRUCTION
Upcoming Projects
MRF with Composting: 3
Paete :P 5M

Antipolo : P 24 M
Lucban : P 17 M (with WWTF)
Flood Control: 1
Angono River and Lakeshore
Stabilization : P 17 M

STATUS: Approved by
the MDFO
Paete: SPAR for
LISCOP Incentive
Package
Micro-Watershed Management Plan

Funding Assistance in project implementation

with Loan-Grant-Equity Scheme


Project Development Fund of LLDA as a
Source of Equity

Assistance in securing Environmental


Compliance Certificate (ECC)

Capacity Building

Local and International


Recognition
LISCOP
Will end January 2010

Working on its Additional Financing

There is strong demand from LGUs to


finance MRF, Flood Control,Ecotourism
Water Supply and Sanitation
FOR LISCOP PHASE 2
Indicative List
Rizal Province:
Teresa
Baras
Cardona
Pililla
Antipolo

Laguna Province:
San Pedro
Alaminos
Lumban
Rizal
Bay
Paete
Mabitac
Calauan
Magdalena
Pangil
Pila
Batangas Cavite:
Majayjay
Silang
Malvar Carmona
Requirements from LGUs to be
Eligible for LISCOP Funding
1.Letter of Intent (LOI),
2.Passage of a Sangguniang Bayan Resolution
expressing its commitment and support to
implement the sub-project,
3.Social acceptance of the sub-project/proof
of consultation,
4.Borrowing Capacity, and
5.Proof of land ownership thru valid land
documents
Financing Scheme
Green and Blue Sub-Projects
Reforestation, watershed protection, river and shore protection

Municipalities
Loan Grant Equity

Cities 80 0 20

1st & 2nd 50 30 20

3rd & 4th 45 40 15

40 50 10
Financing Scheme
Brown Environment
Solid waste management, drainage, sewerage and sanitation support projects

Cities/Municipalities
Loan Grant Equity

Cities 80 0 20

1st & 2nd 60 20 20

45 40 15
3rd & 4th
40 50 10
Sub-Project Appraisal and
Approval
DOF

PGB

LLDA
MDFO LISCOP - PCO

LGUs
CTRG
DOF – Department of Finance
PGB – Policy Governing Board
MDFO – Municipal Development Fund Office
PCO – Project Coordinating Office Communities
CTRG – Consolidated Technical Review Group
Welcome
to the
LISCOP
family!
For more information, contact: