Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Consultation Meeting
12 November 2009
Legend Hotel Villas, Mandaluyong City
LAGUNA LAKE DEVELOPMENT AUTHORITY
Laguna de Bay
Institutional
Strengthening and
Community
Participation Project
LISCOP –
5-yr development initiative of LLDA
Harness and
deepen
stakeholders
’
participation
in micro-
watershed
environment
Mission No. 2
Implement direct
and
strategic micro-
watershed level
interventions that
would contribute
towards
improvement of
the quality of the
Laguna de Bay
and its watershed
Mission No. 3
Strengthen LGU’s
self-governance
and reinforce
inter-LGU
cooperation in
the
environmental
The 34 Pipeline Sub-Projects in 22 municipalities
generated from 15 out of 24 micro-watersheds
which have undergone LEAP
= Covered subprojects
SUB-PROJECTS IN RIZAL PROVINCE
= Covered subprojects
Tanay Micro-Watershed Enhancement Sub-Project (P 30.6 M)
Key Components:
Streambank stabilization
Flood Control
Ecological enhancement
Reforestation
Livelihood
Coop Formation
Pollution management
MRF
Rehab of dumpsites Katutubo Village
Pavilion
Status: Operation
Teresa MRF w/ Composting Sub-Project (P
8.1 M)
Production Area
Status: Operation
Morong MRF with Composting Sub-Project ( Php
9.9 M)
Admin Bldg
Production Area
Status: Operation
Baras Flood Control Sub Project (P
10.0 M)
Status: Construction
Stage
Taytay Flood Control Sub-Project ( Php
10.0 M)
Status: Construction
stage
(1)Angono Material Recovery Facility (Php 11
M) and (2) River and Lakeshore Protection Sub-
Projects
= Covered subprojects
Kalayaan Integrated Solid Waste Management Sub-Project
(P 11.2 M)
Status: 100%
completed Testing
Status: Operation Stage
Stage
Majayjay Falls Eco-Tourism Sub-Project (P
34.8 M)
Administration Building
Hanging bridge
Status:
Operation
Siniloan Environmental Enhancement
Sub-Project (Php 4.0 M)
Status: MRF:Pre-Operation
Stage
Nagcarlan Integrated Waste
Management Sub-Project ( Php 5.0
M)
ACCESS ROAD
MRF
MRF
WWTF
MRF Site
Status: Construction
Pakil Environmental Enhancement Sub Project (P
10M)
Eco-tourism Site
MRF Site
Status: Construction
SUB-PROJECTS IN CAVITE PROVINCE
= Covered subprojects
GMA Cluster Material Recovery &
Composting Facilities Sub-Project (P
16.6 M)
Status:Construction Stage
TYPES OF SUBPROJECTS
Waste Management = 25
STATUS OF BATCH 1 SUB-PROJECTS
100
90
80
70
60
% Accom 50
40
30
20
10
0
1 2 3 4 5 6 7 8 9 10 11
No. of LGUs
100
90
80
70
60
% Accom 50
40
30
20
10
0
1 2 3 4 5 6 7 8
No. of LGUs
4 Sub-projects = COMPLETED
3 Subprojects = SUBSTANTIALLY COMPLETED
2 Sub-projects = PRE CONSTRUCTION
Upcoming Projects
MRF with Composting: 3
Paete :P 5M
Antipolo : P 24 M
Lucban : P 17 M (with WWTF)
Flood Control: 1
Angono River and Lakeshore
Stabilization : P 17 M
STATUS: Approved by
the MDFO
Paete: SPAR for
LISCOP Incentive
Package
Micro-Watershed Management Plan
Capacity Building
Laguna Province:
San Pedro
Alaminos
Lumban
Rizal
Bay
Paete
Mabitac
Calauan
Magdalena
Pangil
Pila
Batangas Cavite:
Majayjay
Silang
Malvar Carmona
Requirements from LGUs to be
Eligible for LISCOP Funding
1.Letter of Intent (LOI),
2.Passage of a Sangguniang Bayan Resolution
expressing its commitment and support to
implement the sub-project,
3.Social acceptance of the sub-project/proof
of consultation,
4.Borrowing Capacity, and
5.Proof of land ownership thru valid land
documents
Financing Scheme
Green and Blue Sub-Projects
Reforestation, watershed protection, river and shore protection
Municipalities
Loan Grant Equity
Cities 80 0 20
40 50 10
Financing Scheme
Brown Environment
Solid waste management, drainage, sewerage and sanitation support projects
Cities/Municipalities
Loan Grant Equity
Cities 80 0 20
45 40 15
3rd & 4th
40 50 10
Sub-Project Appraisal and
Approval
DOF
PGB
LLDA
MDFO LISCOP - PCO
LGUs
CTRG
DOF – Department of Finance
PGB – Policy Governing Board
MDFO – Municipal Development Fund Office
PCO – Project Coordinating Office Communities
CTRG – Consolidated Technical Review Group
Welcome
to the
LISCOP
family!
For more information, contact: