5/30/2014 3 Date of First Meeting: - 12/09/2008 Total no. of meetings: - 09
Mr. P. K. Gupta Leader Mr. Chamanlal Dy. Leader Mr. Saurabh Harne Member Mr. M. K. Lakhani Member Mr. U. P. Gupta Member Mr. R. D. Maurya Member Mr. Anil Dev Member Mr. Madhukar Mishra Member Mr. Shyamal Roy Member Mr. A. K. Dixit Member
FACILITATOR Mr. Balbir Singh
MEMBER STEERING COMMITTEE Mr. A. Akhtar
Avg. Attendance of Group - 73% Avg. Age of Group - 40 YEARS Avg. Working Experience of Group - 17 YEARS
CIRCLE'S INTRODUCTION 5/30/2014 4 PROBLEMS COLLECTED BY BRAIN STORMING
1. Spillage of urea prills from filled stitched bags. 2. Spillage of urea from bagging machines during lumps removing. 3. Failure of ET-06 belt conveyor due to cracking of bend pulleys. 4. Damaging of ET-01 belt conveyor and D-Shaping of transoms. 5. Uneven stitch length of stitches on urea filled bags. 6. Poor performance of bagging machines (Service air problem) 7. Rupturing of urea filled bags at portable conveyors. 8. Urea spillage at ET-07/ET-08 tail pulleys area. 9. Urea spillage due to jamming of TR-01/TR-02 at BH-03/BH-06. 10. Huge dust emission at ET-07/ET-08 belt conveyors.
PROBLEM SELECTED
Problem no. 3. Failure of ET-06 belt conveyor due to cracking of bend pulleys is selected.
5/30/2014 5 SYSTEM INTRODUCTION ET-6 bend pulley is used to bend the conveyor belt, towards the gravity take up pulley and counter weight to provide sufficient tension in conveyor belt & keep it straight. The belt conveyor system is used to convey the Urea prills from prilling section to Bagging plant. HEAD PULLEY CARRYING IDLER SNUB PULLEY BEND PULLIES RETURN ROLLERS TAIL PULLEY TAKE UP PULLEY BELT Urea prills from Prilling Tower 5/30/2014 6 PROBLEM INTRODUCTION
ET-06 belt conveyor bend pulleys frequently cracked at hub as well as at drum. Whole bulk conveyor system stopped time to time for repairing/replacement of the pulleys, Resulting in the diversion of urea solution to V-5. Reclaiming of urea solution from V-5 incurred extra cost.
REQUIREMENT
To find out ways so that Failure of ET-06 Belt Conveyor does not occur due to cracking of Bend Pulley.
INITIAL DATA COLLECTION
1. Diversion time & date. 2. Recovery Lineup time. 3. Production rate before diversion. 4. Basic Design of Pulley.
Continue..
5/30/2014 7 Cause & Effect Diagram MEN MACHINE MATERIAL Not Applicable Not Applicable Not Applicable Low Design Capacity No modification in basic design since plant running METHOD Frequent failure due to Cracking of Bend pulleys. 5/30/2014 8 0 10 20 30 40 50 60 70 80 90 100 A B C Nature of Prob. A = Design Limitation = 90% B = Variation in Load = 5% C = Regular Inspection = 5 %
PARETO DIAGRAM 5/30/2014 9 Development of Solutions Possible Solutions Action Reason Balancing Problem Discard Only vibration observed. Load Limit Discard As Urea flow is uniform most of the time. Material Fault Discard No material failure is there. Alignment Discard Alignment checked found ok. Counter Weights Discard As per original Drawing. Pulley Design Accepted No modification since plant start up. 5/30/2014 10 Selection of Solution Modification in Design of Bend Pulleys
Frequently facing the problem of cracking of bend pulleys of ET-6 belt conveyor, our plant personnel had a visit at Indo- Gulf Fertilizer to have comparative study regarding bend pulleys. It was discovered after discussion that their pulleys are designed for heavy duty and they have not faced same problem since start up of the plant. There fore the drawing of their pulleys were obtained and subsequently new heavy duty pulleys were procured as per our requirement and plant load. Those were installed during annual shut down. Since than there has been no problem of cracking of pulleys observed, even though we are running plant at relatively higher load. 5/30/2014 11 OLD ET-6 BEND PULLEY 5/30/2014 12 NEW MODIFY ET-6 BEND PULLEY 5/30/2014 13 Cost Benefit Analysis Cost of Modification Unit Rs. Bend Pulley 2 Nos. 96755 Bearing (With Sleeve) 4 Nos. 31245 Total Cost 128000
Average Loss per Year (Diversions Only) 113200 Pay Back Period 413 Days
Average Loss per Year (Diversions & Tripping) 3051200 Pay Back Period 15 Days
5/30/2014 14 BENEFITS TANGIBLE BENEFITS
Savings per Year = Rs. 113140
INTANGIBLE BENEFITS
Shocks on related equipments (Other pulleys) will be avoided due to subsequent start up of Belt Conveyor. A potential problem will be minimized. Reliability of ET-6 will be improved.