Automotive Solution
Automotive Solution
Distribution Flows (Procurement, Logistics, and Sales)
Receipts Management
Inventory
Vehicles Planning
By Model By Color
V01 Safety Stock V02 Safety Stock V02 - On Hand Balances Consolidated BB Procurment Plan BB-DRP
Lead Times Lead Times
NMA Agreement
In-Transit
2006 Oracle Corporation Proprietary and Confidential NMA
NME
NML
Vehicles Costing
WMS_LICENSE_PLATES_NUMBERS
RCV_TRANSACTIONS MTL_LOT_NUMBERS
Notification
6
Awaiting Approval?
Receive
Express Receive Transactions in WMS Notification Yes
Deliver
Shipment Costed ?
3
Error Message No
Shipment Costed ?
Yes
2
AP Invoices
= Extension Number
CONVERT ADJUST
CHARGE
INVOICE
Receiving Controls
WAREHOUSE STOCK
N104SG
N104SG Cost Group N04-1
CUSTOMERS
VIN006
VIN006
VIN011 VIN012
VIN012
VIN012
Customer B: Cost Of Goods Sold: 46,500
Substitution Netting
Supercession Chains
Suggestion of Part B
Request Part A
Vehicles Availability
Spares Availability
Pricing/Discounting/Holds
Credit Checking
Invoice Generated
Unreserve
Enter - Line
Schedule - Line
Fulfill - Deferred
Fulfill
Close - Line
End
XX VIN Unconfirm
XX Awaiting Mo Picking
Yes
No No
XX Order Internal ?
Yes
Unreserve XX Apply Split Hold Schedule - Line Create Supply - Line Ship - Line, Manual Fulfill - Deferred Fulfill Invoice Interface - Close - Line Line End
XX Shipping Hold
Vehicles Sales
Pick Slip Report Service Request creation Task PDI Task RP Task Fitting
VIN Reservation
5
1 2 3 4
Task RP Completed
Yes
Sales Rep Sends notification to Manager requesting release of Hold for direct Shipment from Aweer
Ship Confirm
Payment Verification
10
Payment Verification
Ship Confirm
Full Internal Cross-Organizational Logistics Control with Over 50 Order Amendments Provisions !
Credit Management
Approval Process
Payment
Plan Element
Expression Rate Table
Automotive Solution
Service Flows (Workshop Operations)
Verify Entitlements
Warranty, Maintenance Contract, Goodwill, Campaign, etc.
Complete Operations
Job Inspection
Receive Payment
Deliver Vehicle
Create Service request for vehicle Inspect vehicle and access condition
Define Renewal rules Define Billing rules Define events & counters for KM readings
Review Contract for QA compliance Define quality Guidelines for contract Run QA check for Contract
Approve Contract
Mechanic View
Automotive Solution
Financial Flows (Financial Management)
Accounts Receivable
Credit Management
Refunds
Cash Receipts
Cash Management
Lease Management
Advanced Collections
Fixed Assets
Customer Receipts
Cash / Cheque / Credit Card / PDC
Ship Goods
AIM Methodology
Pre-Defined Future Process Model as a Starting Point
Requirements Mapped to Business Flows
AIM Methodology
Phase Transition Production Phase Definition Build Phase Phase Definition Elaboration
Elaboration Phase
Build consensus around project direction, scope, objectives and Prepare the production environment and configure the applications. Validate Organization and Chart Ofapproach. Account Structure Provide agreed upon levels of user support. Prepare the Development Environment. Familiarize key users with Business Flows. Install data conversion programs and convert and verify legacy data. Analyze user-learning needs and develop the User Learning Plan Measure system performance and enhance data as required. Develop, test, and accept custom extensions, Perform initial mapping Business Flows to the business processes. Determine Exception Determine Exception Perform acceptance testing. Train the end users. of Implement the production Conduct CRP 2.0 to refine the solution Decommission the former systems, if any. conversions and subsystem integrations. Dispositions Dispositions Prepare Gather the requirements to support the functional and information needs the application system. support infrastructure. Develop functional and technical design for of custom extensions, Improve knowledge andfrom skillsthe for the new environment. Project Propose a organizational transition strategy for moving Production Obtain management approval to proceed with the next phase. Update Update Flows Verify that all aspects of system are ready for transition. Begin to use interfaces, and database extensions. Planning Devote attention to post production issues like user acceptance, productivity, and human Environment current system, manual or the automated, to Flows the new the Production System Develop unit and system integration test scripts. performance support application system.
Update Procedures Update Procedures Update Setups Update Test Script Prepare CRP 3.0 Environment Conduct CRP 3.0 Identify Exceptions Perform Acceptance Test Convert and Verify Data
Build
Transition
Production
Create, test, and accept database extension and Update Setups installation routines. Conduct CRP solution 1.1 Finalize the in preparation for transition to Update Test Script (Familiarization) production
Prepare CRP 2.0 Environment Conduct CRP 1.2 (Mapping) Conduct CRP 2.0 Identify Exceptions
Identify Exceptions
Design Extensions
Begin Production
Maintain System
AIM Methodology
Definition
Project Planning
Elaboration
Determine Exception Dispositions
Build
Determine Exception Dispositions
Transition
Prepare Production Environment
Production
Update Flows Update Procedures Update Setups Update Test Script Prepare CRP 3.0 Environment Conduct CRP 3.0 Identify Exceptions
Identify Exceptions
Design Extensions
Begin Production
Maintain System
Deliverables - Modules
Modules
General Ledger Accounts Payable Accounts Receivable
Deliverables
Activity
PROJECT MGMT REQUIREMENTS MAPPING
AIM
CR.010 RD.050/B R.030 TA.090
Task
Project Management Plan
Deliverable
Project Management and Quality Plan Business Requirements/Map ping Technical Architecture Create Application Extensions Design Applications Extension Technical Design Future Business Model Conversion Data Mapping System Test Document Application setups
Time
Week 3
Gather & Map Business Requirements Define Application and Database Server Architecture Create Application Extensions Functional Design Create Application Extensions Technical Design
Week 8
CUSTOM EXTENSIONS
MD.050
MD.060
FUTURE BUSINESS PROCESSES TRANSITION
Week 33 to Week 34
BP.080
CV.040 TE.040
Perform Conversion Data Mapping Develop System Test document Define Application Setups
SETUP
BR.100
Alert
Periodic
Alert
Modules
Forms Personalizations Reports
Training Approach
Transfer of Skills (TOS) at 3 levels
Product Training (Typically at Start, Already Conducted at ) Implementation Workshops (Key End-users) End-user Training (EUT) This is Role Based
Approach
Functional Champions to Undergo Product Training Implementation Workshops Delivered by Oracle End User Training by Super Users
Project Management
Team Structure
Sponsor
Steering Committee
Project Manager
Tech Lead
Database Administrator
Network Admin
Project Assumptions
Staffing as Per Role & Responsibility High-Thrust on Adopting Best Practices Process Standardization Across Business Units Process Enabled Re-Engineering (PER), and not Business Process Re-Engineering (BPR) Quick Turnaround of Deliverables Scope Changes Managed by Change Request Process Minimal Customizations
Risk Assessment
Risk
Scope creep
Consequence
Lack of focus increasing risk of progress slippage
Mitigation
Change control procedure for scope amendments
Impact
High
Inability to define and agree business processes Insufficient or unavailable business resources
Progress slippage Business requirements not adequately defined and/or progress slippage Impact on overall project timescale & increased risk in Production upgrade Progress Slippage
Small user team under focused leadership Project team remain committed to the project Code freeze on Production & Investigate other options Highlight Importance of Time Frames
High
High
High
High
Resource Requirements
Role
Project Manager
Resource
Availability
50%
Activity
Lead and Supervise the Efforts of the Team Providing detailed requirements and system testing and acceptance Provide detailed requirements; perform system testing, and user acceptance testing. Lead the DBA, Data conversion and Customization teams that form a part of project team
Stream Leads
1 per stream
75%
Business Users
50%
Technical Lead
75%
2-3
75%
Provide technical assistance to the Oracle technical team Routine system house keeping and operations activities
50%