McGraw-Hill/Irwin Copyright 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
132
133
134
135
Tools
Tracking and baseline Gantt charts Control charts
137
FIGURE 13.1
138
FIGURE 13.2
139
Glossary of Terms
EV
PV
Earned value for a task is simply the percent complete times its original budget. Stated differently, EV is the percent of the original budget that has been earned by actual work completed. The planned time-phased baseline of the value of the work scheduled. An approved cost estimate of the resources scheduled in a time-phased cumulative baseline [BCWSbudgeted cost of the work scheduled]. Actual cost of the work completed. The sum of the costs incurred in accomplishing work. [ACWPactual cost of the work performed]. Cost variance is the difference between the earned value and the actual costs for the work completed to date where CV = EV AC. Schedule variance is the difference between the earned value and the baseline line to date where SV = EV PV. Budgeted cost at completion. Total budgeted cost of the baseline or project cost accounts. Estimated cost at completion. Estimated cost to complete remaining work. Cost variance at completion. VAC indicates expected actual over- or under-run cost at completion.
AC
CV SV BAC EAC ETC VAC
TABLE 13.1
1311
b. Work packages
c. Deliverables d. Organization units e. Resources
3. Develop a time-phased budget using work packages included in an activity. Accumulate budgets (PV). 4. At the work package level, collect the actual costs for the work performed (AC). Multiply percent complete times original budget (EV).` 5. Compute the schedule variance (EV-PV) and the cost variance (EV-AC).
f. Budgets
1312
FIGURE 13.3
1313
1314
1315
1317
Cost/Schedule Graph
FIGURE 13.4
1318
FIGURE 13.5
1319
1320
FIGURE 13.6
1321
FIGURE 13.7
1322
FIGURE 13.8
1323
TABLE 13.2
1324
FIGURE 13.9
1327
FIGURE 13.10
1328
FIGURE 13.11
1329
1330
Interpretation of Indexes Index >1.00 =1.00 <1.00 Cost (CPI) Under cost On cost Over cost Schedule (SPI) Ahead of schedule On schedule Behind schedule
TABLE 13.3
1331
Indexes Periods 17
FIGURE 13.12
1332
50/50 rule
Allows for 50% of the value of the work package budget to be earned when it is started and 50% to be earned when the package is completed.
EACf
1334
1335
EXHIBIT 13.1
1336
1337
FIGURE 13.13
1338
FIGURE 13.14
1339
Key Terms
Baseline budget Control chart Cost performance index (CPI) Cost variance (CV) Earned value (EV) Estimated Cost at CompletionForecasted (EACf) Estimated Cost at CompletionRevised Estimates (EACre) Percent complete indexbudget costs (PCIB) Percent complete indexactual costs (PCIC) Schedule performance index (SPI) Schedule variance (SV) Scope creep To complete performance index (TCPI) Tracking Gantt chart Variance at completion (VAC)
1340