Overview
B8200 Installation
RRU Installation
It is baseband data that is tranmitted between BBU and RRU. Both intermediate frequency and radio frequency are processed in RRU. BBU and RRU transmits data through optical fiber, significantly simplifying project construction. Concept of baseband pool. Node B capacity increases.
Antenna Pole
Feeder
Optical fiber
A distributed base station consists of two separately-developed, mutually-independent parts. It uses optical fibers instead of many radio frequency cables to reduce feeders and save costs significantly. This results in decreased project costs, improved networking flexibility, and convenient installation.
Power amplifier unit RRU RRU
RF cable
Optical fiber
Optical fiber
BBU
BBU
Advantages
Full use of the existing equipment rooms, no need for new ones; Strong upgrade capability; low-loss feeders; No need for new transmission networks.
ZXWR B8200
Signal loss in feeders will result in degraded coverage performance. The 2G Hz radio frequency signal travels in feeders at a loss of 7dB/100m, and 900M Hz 4dB/100m. Generally, the feeder length of 3G sites is 50 meters, with a signal loss of about 4dB. RRU makes RF be possibly closest to the antenna to minimize the signal loss in feeders. By using BBU+RRU, signal loss in feeders can be reduced to less than 1dB.
RET
Base station antenna
7/16 female RF connector 1/2 super flexible jumper Outdoor grounding cable clip Feeder clip BTS equipment room 1/2 super flexible jumper Lightning arrester
7/8 main feeder cable, with 7/16 female RF connectors at both sides
ZXWR B8200
The BBUB+RRU networking mode saves equipment room space, reduces signal loss in feeders and increases signal gain. It also enables easy centralized management and maintenance and generally saves 20% construction cost and 20% operation and maintenance cost.
Benefits to Operators A 3G network can be easily set up through software upgrade, featuring fast speed, high quality and low cost. The 2G network and 3G network share the same physical equipment for easy evolution and less TCO. Resources are fully shared, so that the 2G network and 3G network can develop in a balanced manner. Two networks are in centralized management to save O&M cost. It is helpful to new business development and increases operating earnings. Full-range standard interfaces enable more flexible networking.
Benefits to Equipment Suppliers It saves development cost and shortens time to market. Full-range standard interfaces increases equipment compatibility. It improves equipment quality and stability to minimize O&M cost. The modular design enhances equipment expandability. It is helpful to new function development and new technology application. EDGE LTE
UMTS
HSPA WiMAX
HSPA+
Evolution, SW Investment
Single cabinet
New-generation RF modules
The 2G-3G base stations share cabinets. The 2G-3G base stations share radio frequency modules. This is achieved by software configurations. The 2G-3G base stations share baseband modules. This is achieved by software configurations.
RU RU RU
Technical Characteristics:
BBUC
It fulfills hardware dual-mode functions and soft base station functions at all possible frequency bands. GSM and WCDMA share baseband boards. Each radio frequency module supports smooth configuration from six GSM carriers to three WCDMA carriers. The transmitting power supports two configurations, 40W and 60W, with a power amplifier efficiency of up to 40. In terms of evolution, it supports hardware compatibility and evolution to LTE. It can process 36 carrier frequencies under the GSM mode. It supports up to S444 or S222222 under the WCDMA mode.
Application Type
1 2 3 4 5
GSM 900MHz UMTS 2100MHz UMTS 900MHz GSM900 + UMTS 2100MHz GSM900 + UMTS 900MHz
SDR base station can help operators operate GSM and WCDMA in one network.
Traditional 2G-3G hybrid networking
Two networks for physical equipment (radio side). One network for operation. Two networks for operation and maintenance.
One network for physical equipment. One network for operation. One network for operation and maintenance.
MSC Server
MGW
RRU
RRU
Content
Overview
B8200 Installation
RRU Installation
B8200 Installation
B8200 Installation
B8200 (3G) supports two installation modes: indoor and outdoor. B8200 Dimensions and Appearance
Equipment B8200 Dimensions (WDH) 482.6mm197mm88.4mm Weight 8.5kg Power Consumption 340W
B8200 Installation
Abbreviation
PM
Power Module
Site Alarm Module
SA
CC
FSM
BPC
GSM and WCDMA use different baseband boards (uBPC or BPC). One uBPC supports 12 TRXs.
Located at one side of the subrack, this board is used for heat dissipation.
FA
Indoor Installation Installation on 19-inch floorstanding mounting support Installation on 19-inch 7U wall mounting support On-wall installation Outdoor Installation Working with W121 M01 integrated power cabinet
Install the B8200(3G)on a 19-inch floorstanding mounting support,which should be no less than 400 mm away from the front row of equipment. The post of the mounting support (front) should be no less than 350 mm away from the rear wall or the behind row of racks. The distance between any side of the mounting support and the walls or other racks should be no less than 100 mm. Install the B8200(3G) at a height of one meter, with a space of 2U left between SWITCH and B8200(3G), and 1U between other equipment. See the installation layout for details. A pallet is a must when intalling the B8200(3G). The installation of the pallet is shown in the figure below. The dimensions of the floorstanding mounting support are 520 mm385 mm1600 mm (LDH).
INVERTER (1U) IDU (1U) IDU (1U) SWITCH (1U) 2U eBBUB (3G) (2U) eBBUB (2G) (2U) eBBUB (2G) (2U)
7 6 5 4 3 2 1 No. Bottom rung Flat washer (M12) Hex bolt (M12 25) Flat washer (M10) Hex bolt (M10 20) Support Top rung Name 2 8 8 4 4 2 2 Quantity
1m
The installation is shown in the figure. Note: Make sure both left and right sides are vertical. The bolts must be fully tightened.
Note: A space of at least 400 mm should be reserved for maintenance in front of the equipment. Any side of the cabinet should be no less than 100 mm away from the walls.
The dimensions of the 19-inch 7U wall mounting support are 500 mm360 mm360 mm (WDH), with a weight of about 6 kg. When two B8200s(2G) are required, install them according to the installation layout 1. When one B8200(2G) is required, install it according to the installation layout 2.
If the wall is too thin (or made of sand or wood) to provide enough bearing capacity, it is recommended to make a support or fix a wooden plate to the wall on site, as shown in the figure below.
Outdoor Installation
Battery
Battery
Model
7U Space Allocation
Outdoor Installation
Use W121 M01. Install the B8200(3G) in the W121. See W121 space allocation for details. There is a space of 7U/9U in the W121. Check to see if the ventilation plate on the right side is removed before installing the B8200(3G). If not (as shown in the figure below), do not install the B8200(3G) and other equipment until removing the ventilation plate. It is required to put the removed ventilation plate and the blank panel in the empty battery box below. The W121 does not support back-to-wall installation. A space of more than 500 mm should be reserved in the behind for the convenience of input/output power cable maintenance, and 500 mm on the left and right for the external air conduits of the heat exchanger. The distance between two W121s should be larger than 500 mm. Solve any floor bearing capacity-related problem according to the structure analysis report.
DC power cable Outdoor optical fiber SA panel cable Dry contact alarm cable Power supply monitoring cable E1 cable Ethernet cable GPS feeder Grounding Cable
1. DC Power Cable Application: It is used to connect the external -48VDC power supply into the equipment. Use it to connect the power supply equipment to the power module FM of the B8200(3G). Connect B1 to the protective grounding terminal of the B8200(3G). Connect B2 and B3 to the DC power cabinet. The power cable connections are shown in the table below:
48 V GND 48 V Voltage: 0 V DC Max. power: 300 W Voltage: 48 V DC Max. power: 300 W A1 A2 Brown conductor Blue conductor
B2 B3
The anti-pull wire fastener of the optical fiber must be cut from the root, as shown in the figure below.
After Before
3. SA Panel Cable
End A of the cable is an SCSI50 plug that connects with the corresponding port on the SA panel. End B1 is a DB44 plug (connecting with E1/T1), end B2 being RS232 connector (DB9), end B3 being dry contact connector (DB25), and end B4 being grounding end.
Cable Color
White Blue White Orange White Green White Brown Red Blue Red
DB25_19
DB25_7 DB25_20 DB25_8 DB25_21
NODEB_IN6N
NODEB_IN7P NODEB_IN7N NODEB_IN8P NODEB_IN8N
Orange
Red Green Red Brown
White Blue
White Brown
Short circuit
Short Circuit
White Brown
Red
For uncustomized RS232 cables, it is required to make the DB9 (F) on site according to the following cable sequence.
DB9 (Female) DB9_2 DB9_3 DB9_5 Color of End B2 Cables Blue Orange Weld both white cables together.
The DB9 connector passes through this hole from the front panel. If other cables are routed through this hole first, the DB9 connector cannot pass through it.
Remove the original DB9 connector on the power supply monitoring cable of W212, and then plug in the DB9 connector on the dedicated FNB cable that connects to BBUB.
Grounding terminal
6. E1 Cable
If the 120-ohm E1 transmission mode is used at the site, connect the DB44 connector at end A of the 120-ohm E1 cable to the B1 jack of the SA panel cable. For end B, make a DB15 connector on site according to the following cable sequence and connect it to HDSL. Note: Both the seventh and the eighth pairs of E1 cables should be left unconnected for acting as the DB9 connector that receives clock signals from NSN and providing clock signals to the B8200(2G) respectively.
I_RING_ 0 22 Blue/1 red I_RING_ 4 13 Yellow/2 red TIP_0 23 Blue/1 black TIP_4 14 Yellow/2 black O_RING _0 24 Pink/ 1 red O_RING _4 43 Grey/2 red TIP_0 25 Pink/1 black TIP_4 44 Grey/2 black I_RING_ 1 1 Green/ 1 red I_RING_ 5 39 Blue/3 red TIP_1 2 Green/1 black TIP_5 40 Blue/3 black O_RING _1 3 Yellow/1 red O_RING _5 41 Pink/3 red TIP_1 4 Yellow/1 black TIP_5 42 Pink/3 black I_RING_ 2 5 Grey/1 red I_RING_ 6 35 Green/3 red TIP_2 6 Grey/1 black TIP_6 36 Green/3 black O_RING _2 7 Blue/2 red O_RING _6 37 Yellow/3 red TIP_2 8 Blue/2 black TIP_6 38 Yellow/3 black I_RING_ 3 9 Pink/2 red I_RING_ 7 31 Grey/3 red TIP_3 10 Pink/2 black TIP_7 32 Grey/3 black O_RING _3 11 Green/2 red O_RING _7 33 Blue/4 red TIP_3 12 Green/2 black TIP_7 34 Blue/4 black
Signal Definition Pin No. (End A) Cable No. Signal Definition Pin No. (End A) Cable No.
1 (IN0) Blue/1 red Cable Pair Sequence (End B) 9 (IN4) Yellow/2 red Yellow/2 black Blue/1 black
Note: Blue/1 red means there is one red spot on the blue cable; and so on.
Blue/1 red means there is one red spot on the blue cable; and so on.
7. Ethernet Cable
The switch must be installed at all sites. The Ethernet cables of the B8200(3G) are connected from the ETHO of the CC board to the corresponding ports of the switch, which then connects to the optical MODEM through Ethernet cable. Generally, customized 1.8 m network cables are used as Ethernet cables. If the required length exceeds 1.8m, the cable should be made on site. The Ethernet cable is straight through, with the cable sequence (568B) in the RJ45 connectors at both ends being the same.
End A 1 2 3 4 5 6 7 8 Cable Color White orange Orange White green Blue White blue Green White brown Brown End B 1 2 3 4 5 6 7 8
8. GPS Feeder
The GPS feeder is used to guide signals from GPS antenna into BBUB. The appearance is shown in the figure below. The connector (male) at end B (BBUB side) is SMA coaxial cable; while the connector (female) at end A is N coaxial cable.
9. Grounding Cable
Connect the grounding cables of both power cables and SA cables to the grounding terminal on the B8200(3G), and then connect the grounding terminal to the indoor equipment grounding bar through a 16mm2 yellow-green grounding cable.
Grounding point
Connect the grounding cables of both power cables and SA cables to the grounding terminal on the B8200(3G), and then connect the grounding terminal to the grounding point at the bottom left of the W121 power cabinet through a 16mm2 yellow-green grounding cable.
Such equipment as B8200(3G), switch, and microwave device must be all jointly connected to the grounding point in the power cabinet. Do not guide these equipment grounding cables to the outdoor grounding bar.
Content
Overview
B8200 Installation
RRU Installation
RRU Installation
RRU supports two installation modes: outdoor and indoor. In the outdoor mode, the distance between RRU and antenna should be less than 5m if the RRU has only one antenna, or 20m if the RRU has more than one antenna, or should meet the design rquirements. In the indoor mode, the distance between RRU and antenna should be less than 20m or shoule meet the design requirements. Install only one UMTS 2100M R8840 for each set of RRU in the first phase, and one 900M R8860 and one to four 1800M R8860s in the second phase. RRU Dimensions:
Equipment R8840
R8860
Weight 16.5kg
22.5kg
Note: The RRU must be placed vertically with its ports facing downwards. Never place it horizontally.
When installing the RRU on an outdoor antenna feeder plane, there are several mounting modes as follows: Wall-mounting (preferred); Pole-mounting or L type-mounting; Flexible mounting according to the on-site conditions. Consider full configurations for each set of RRU: Six RRUs + three or six outdoor lightning protection boxes (one lightning protection box supports two RRUs) + two combiners + two 3dB bridges Where, the combiners and bridges are used at the shared stage of the existing network. After cutover, the combiners should be removed. Whether the bridges should be removed or not depends on the practical situations. Dimensions of Pole and Lightning Protection Box
Dimensions (WDH) 450mm99mm400mm 238mm106mm305mm 600mm600mm2000mm Weight 8kg 3kg 62kg
Equipment Indoor Lightning Protection Box Outdoor Lightning Protection Box RRU Pole
Outdoor Installation of RRU - Wall-Mounting Mode Full configurations of each RRU: six RRUs + three or six outdoor lightning protection boxes. Mount all these nine pieces of equipment on the wall individually. Only one R8840 is installed in the first phase of installation, so a dummy box is required to take a position for an RRU that will be installed in the second phase, at the end of which there will be six true and dummy RRUs. Installation requirements: A space of 250mm high is required above the RRU for heat dissipation. There should be no object that affects normal outlets or connections in the 250mm installation space under the RRU. When mounting RRU and outdoor lightning protection box on the wall, do not use the included expansion bolts. Buy and use HILTI stainless steel bolts instead.
Outdoor Installation of RRU - Wall-Mounting Mode The figures below show the wall-mounted RRUs of the minimum installation dimensions. The layout may be adjusted according to the wall conditions at each site.
Outdoor Installation of RRU - Pole-Mounting Mode Installation Dimensions: First phase: The height from the top of the R8840 to the bottom of the support is 790mm. The height from the top of the outdoor lightning protection box to the bottom of the support is 870mm. In the outdoor pole-mounting mode, enough space should be reserved for operation and maintenance according to the following requirements: There must be a space of more than 1 m (from the center of the pole) at two or more sides. The distance between the pole center and the wall/equipment must be larger than 600mm if the pole is close to the wall or other equipment.
Outdoor Installation of RRU - Pole-Mounting Mode Installation of Concrete Pier under RRU Support: The construction workers should pour the concrete pier according to the practical on-site situations. Consider the bearing capacity of the floor when positioning the concrete pier based on the structure design drawings. Dimensions of concrete pier: 800mm800mm150mm The grade of the precast concrete pier is C20, with a cement/mortar ratio of 1:3. Try to keep a flat upper surface and avoid destroying the waterproof layer of the roof when pouring the concret pier. Make holes on the concret pier after it completely solidifies. M20 expansion bolts must be used to secure the pole.
Install the R8840 at the bottom layer during the first phase. It can only be positioned on the end face of the disc-shaped component (The concave surface of the component must face downwards.). Do not make it straddle two disc-shaped components. Install the outdoor lightning protection box on the R8840, with both facing the same direction, as shown in the figures above. Mount M8 bolts into the positioning holes of the pole before installation. Use these bolts to position the discshaped component.
Install two 1800M R8860s, one 900M R8860, and one outdoor lightning protection box during the second phase. Position these three R8860s at the bottom layer, with the two 1800M R8860s being adjacent. Install the outdoor lightning protection box opposite to the one installed in the first phase.
Introduce the MIMO technology into the third phase. Install one 2100M R8840, one 900M R8860, and one outdoor lightning protection box. Install the outdoor lightning protection box at the top layer, facing the same direction as the one installed in the first phase. Install the two RRUs symmetrically at the same layer, as shown in the figures above. The outdoor lightning protection box can only be positioned on the end face of the disc-shaped component (The concave surface of the component must face downwards.). Do not make it straddle two discshaped components.
Installation requirements: There should be no object that affects normal outlets or connections in the 250mm installation space under the RRU.
When installing the RRU indoors, configure six RRUs, one DC power distribution box (one DC power distribution box supports six RRUs), and one combiner/bridge for each set. Indoor or outdoor lightning protection boxes are not required. Each RRU set needs one DC power distribution box MCB (One DC power distribution box supports six RRUs. The rated current of the MCB switch should be higher than 16A). Use 25mm2 blue black power cables to connect the DC power distribution cabinet with each DC power distribution box. Install a grounding bar besides each RRU set. If two RRU sets are close to each other (less than 3m), they can share a grounding bar. Connect the protective ground of the MCB to the RRU grounding bar by using 16mm2 yellow green grounding cables. Generally, there are two modes to install the RRU indoors: Wall mounting is preferred. If the wall is too thin (or made of sand or wood) to provide enough bearing capacity, it is recommended to make a back-to-wall support on site. Refer to the wall-mounting BBUB above. If wall mounting is impossible, it is also acceptable to use a floorstanding mounting support that can bear four RRUs. Mount the MCB on the nearest wall.
Indoor Installation of RRU - Wall-Mounting Mode The figures below show the wall-mounted RRUs of the minimum installation dimensions. The layout may be adjusted according to the wall conditions at each site. A space of 250mm high is required above the RRU for heat dissipation. There should be no object that affects normal outlets or connections in the 250mm installation space under the RRU.
Indoor Installation of RRU - Floorstanding Mounting Support (Portal Rack) The dimensions of the floorstanding mounting support that bears four RRUs are 450mm600mm1600mm (WDH). Note: if it is impossible to mount expansion bolts into the indoor floor, construction workers should take suitable actions to secure the installation.
R8840
R8860
Indoor Installation of RRU - Floorstanding Mounting Support (Portal Rack) Installation Dimensions
R8840
R8860
Portal rack positioning: The front edge of the base should be flush with that of the existing devices in the equipment room, with a distance of 10cm away from adjacent devices on both sides. Install the base by using different modes that are suitable for the equipment room conditions. Use tapping screws when installing it in a shelter or expansion screws in a normal equipment room. For the convenience of cabling, it is not recommended to mount the cover-like component at the top of the portal rack. It is required to drill holes at the lower (rear side) part of the portal rack pillar for the installation of grounding bar. Such holes should be 13cm away from the base, and the lower edge of the grounding bar should be 10cm from the base. See the figure on the right.
Mount the grounding bar on the inner side of the portal rack pillar.
The lower edge of the grounding bar should be 10 cm away from the base.
10 cm
The front edge of the base should be flush with that of the existing devices.
Universal wall-mounting parts are indispensable for R8840 installation in both wall-mounting and support-mounting modes. Insulating bed plates and insulating rubber rings must be used in assembly for the installation of universal wall-mounting parts. Installation Steps For portal rack-mounting mode: Bolt - insulating rubber ring universal wall-mounting part - insulating bed plate - portal rack - flat washer - spring washer - nut. For wall-mounting mode: Nut - flat washer - spring washer insulating rubber ring - universal wall-mounting part - insulating bed plate - expansion screw - wall.
R8840 Installation
Install the R8840 on the portal rack. Keep an eye on the positions of the wall-mounting holes, which are the No. 1, 3, 11, and 13 holes from top to bottom of the portal rack. Install Cell-A and Cell-B in the front of the portal rack, and Cell-C and Cell-D in the back.
DC power cable Outdoor optical fiber " jumper RRU alarm cable Grounding cable
R8840 Interfaces
Description of R8840 Interfaces
1. LC1 - Interface between BBUB and R8840 2. LC2 - RRU cascade interface 3. AISG - AISG interface 4. Monitor - Monitoring cable interface 5. PWR - Power cable interface 6. ANT2 - RF interface (diversity) 7. ANTI - RF interface (main set) 8. RXout - Frequency point extension interface 9. RXin - Frequency point extension interface
1. DC Power Cable Currently, ZTE delivers many models of DC power cabinets (such as H900, H151, T601, and W121) that are configured with two types of switches: 63A and 32A. It is recommended to connect each RRU set to a 63A switch and connect the B8200 (3G) to a 32A switch during the first-phase installation. If an old DC power supply equipment is used, it is recommended to connect each RRU set to a 63A switch and connect the B8200(3G) to a 32A switch, If the old switch does not meet specifications, replace it with a qualified one.
Outdoor Cabling Requirements The selection of outdoor cables between indoor lightning protection box (one supports three RRUs) and outdoor lightning protection box (one supports two RRUs) should follow the principles below. If the cable length is less than 50m, use 6mm2 dedicated two-core cables. If the cable length is between 50m and 145m, use 16mm2 dedicated two-core cables. If the cable length is between 50m and 80m, it is also acceptable to use 10mm2 dedicated two-core cables. If the cable length is between 145m and 290m, use 16mm2 dedicated two-core cables, but in this case, one outdoor lightning protection box only powers one RRU separately. Configure outdoor lightning protection boxes and outdoor cables as follows after completing the installation of each RRU set. If the outdoor cable length is less than 145m, the 2100M RRU and the 900M RRU should share one outdoor lightning protection box, and two to four 1800M RRUs should share one or two outdoor lightning protection box. In this case, each RRU set requires three outdoor cables. If the site is designed to accomodate UMTS equipment only, each RRU set requires only one outdoor cable. If the outdoor cable length is between 145m and 290m, each outdoor lightning protection box can only support one RRU. In this case, each RRU set requires six outdoor cables. If the site is designed to accomodate UMTS equipment only, each RRU set requires only two outdoor cables. If the cable length between the indoor lightning protection box and the outdoor lightning protection box is more than 290m, it is recommended to position the RRU as close as possible to the B8200 during project survey, and make sure the cabling route is less than 290m. If it is impossible to meet such requirements, give up the site and find a new one. It is required to finish laying outdoor cables once and for all in the first-phase installation. Lay three or six outdoor cables for each RRU set. A surplus cable length of 3-5m should be reserved at the indoor B8200 side for the installation of the indoor lightning protection box during the second phase. The pre-laid cables at the RRU side should also provide a surplus length, and waterproof treatment should be made.
Cabling Requirements in Outdoor Lightning Protection Box The inlet/outlet cables of the outdoor lightning protection box must be sealed by passing through the sealing ring of the box for good leakproofness. If the 16 mm2 outdoor cables cannot pass through the sealing ring, remove it, and then lay the cables. Make sure the cable sequence is correct during the installation of the outdoor lightning protection box, as shown in the figures below.Note: The power cable that connects with the 2100M RRU must pass through the middle cabling hole. The end of the unused cabling hole must be sealed by winding two rounds of PVC insulating tape on it.
Wrong cabling. The protective grounding cable should be routed through the second inlet hole. This hole is reserved for R8840. Inlet hole for outdoor cables. The cables must be grounded. Protective Inlet hole for outdoor grounding cables. cable The cables must be grounded Protective grounding cable Reserved hole R8840 power cable Alarm cable
Wrong cabling. The power cable of R8840 should be routed through the third inlet hole. This hole must be reserved for the power cable of the 900M R8860 in the second phase.
Correct Installation
Wrong Installation
2. Outdoor Optical Fiber Configure optical fibers as follows after completing the installation of each RRU set. UMTS 2100M: 1 piece UMTS/GSM 900M: 1 piece GSM 1800M: 1 or 2 pieces Standby optical fiber: 1 piece Generally, lay five optical fibers for each RRU set. It is required to finish laying outdoor optical fibers once and for all in the first-phase installation. Lay five outdoor optical fibers for each RRU set. Coil up the surplus length of optical fibers and place them at the RRU side. A surplus optical fiber length of 3-5m should be reserved at the B8200 side for the installation of the B8200 during the second phase. Waterproof treatment should be made to the pre-laid optical fibers. If the site is designed to accomodate UMTS equipment only, each RRU set requires only three outdoor optical fibers. Each optical fiber must be tested by using optical multimeter before and after laying. Fill the detailed test results accurately into the Outdoor Fiber Test Record. Use optical multimeter to test the loop-back loss of the optical fibers. The optical fibers are in good condition if the loop-back loss is less than 1dB; otherwise, find out the reason or lay the optical fibers again. Do not lay the outdoor optical fibers at the places where they will possibly be trampled frequently. Otherwise, mount rigid PVC troughs or trough covers to protect the optical fibers. Both ends of the connectors of any pre-laid or unused outdoor optical fiber must be equipped with protective caps. Never touch any optical fiber connector with bare hand. Waterproof treatment must be made to the outdoor connectors.
3. " Jumper The " jumper (left) and the 7/8" jumper (right) are shown below.
Technical requirements: 1. See the figure above for the length. 2. It is recommended to use 37-core connector CT48A - 37TY from JONHON Optronic. Terminate the cable by soldering, which must be secure. No dry soldering is acceptable. 3. Print and paste the bar code labels according to the general requirements specified in ZTE Cable Component Design Specifications - Design and Use Requirements of Bar Codes. 4. Connections at end A are shown in the table below. End B is exposed and connections should be made on site. 37- Core (female) Round Pin at End A 15/16 17/18 19/20 21/22 23/24 25/26 Other pins are empty. Cable Color White blue / blue White orange / orange White green / green White brown / brown Red blue / blue Red orange / orange Other cores are left unused. Signal Description Dry contact 4 -/ + Dry contact 3 -/ + Dry contact 2 -/ + Dry contact 1 -/ + 485 reception -/+ 485 transmission -/+
No. 1 pin
Alarm Cable Connections between RRU and Outdoor Lightning Protection Box Connect the alarm cable of the RRU to the outdoor lightning protection box by using the white brown/brown wires at the dry contact 1, as shown in the figure below. Note: Strip off the alarm cable sheath until the wires show their colors (white brown/brown).
5. Grounding Requirements of Outdoor Cables Both ends of each outdoor cable are grounded through the shielding layer of the cable fixed by a metal fastener in the indoor/outdoor lightning protection box. Protective grounding is made to the lightning protection box through grounding cables, and the mental fastener connects with the grounding of the lightning protection box, so no grounding cable is required at both ends of the outdoor cable. The 16mm2 cable cannot pass through the cabling hole on the outdoor lightning protection box until the cable sheath is stripped off. The cable clip in the outdoor lightning protection box can be used to clamp 16mm2 shielding cables. If there is no lightning strip on the roof, it is acceptable to ground the outdoor cable at both sides. No grounding is required in the middle, as shown in the figure below. If there is a lightning strip on the roof, ground the outdoor cable at both sides when the cable length is less than 30m. If the outdoor cable length is more than 30m on the roof, ground it once per 20m.