1. Previous Meeting 2. HSE Programs

5. Weekly Inspection 6. Medical Cases 7. Environmental Issues 8. Action Plans

3. HSE Statistics
Performance per Area and Total 4. HSE Findings Summary

Findings analysis- cause wise,


Company, and Area HSE Findings by Company Reported Near Miss Evaluation by Findings Score

BARAKAH NUCLEAR POWER PLANT PROJECT

BARAKAH NUCLEAR POWER PLANT PROJECT

NO.

ITEMS

ACTION PLANS
ENEC HSE representative had recommended analysis of recurring findings such access and egress, housekeeping, and scaffolding. The analysis will cover past 3 months, trend be known whether performance is following a positive trend. The slide on HSE Findings per Area must have additional column showing no. of inspections in specific area. For example, reported findings at camp is zero but number of inspections unknown. Advan company discussed action plans on the 43 findings this week. Planning and Engineering Manager from Advan explained corrective actions to address findings related to scaffolding, fall protection, etc. Due to high rating of HSE findings, the organization will come back next week presenting their complete plans.

ACTION BY

DUE DATE

STATUS

Weekly Findings

HSJV

Next Meeting

Done

No. of Inspections

HSJV

Next Meeting

Done

High Findings

HSJV

Next Meeting

Done

BARAKAH NUCLEAR POWER PLANT PROJECT

Manpower
250

Access & Egress

Housekeeping

Scaffolding

6000 5500
5000

200

150

5744
100

4500 4000 3500 3000

5104
50

5243

October (2012)

November (2012)

December (2012)

BARAKAH NUCLEAR POWER PLANT PROJECT

NO.

ITEMS

ACTION PLANS

ACTION BY

DUE DATE

STATUS

Subcontractors should focus on condition of Access and ladders in the areas of Power Block. These Egress, 62% organizations can make use of HSJV ladder total findings at checklist to upgrade current conditions of Power Block ladders in Power Block
Half of the total findings are related to require tagging, and condition of ladder. Awareness on tagging requirements is necessary to all workers. Ladder will be checked again at all aspects ensuring compliance to standard requirements. Note : additional trainings must be reinforced to improve awareness of workers

Seoyong Advan Gusan

Immediate

OPEN

Scaffolding 2 44 % of total findings at

Power Block Findings related to conditions of guard rails, planks,


and toe boards are either missing or in bad state shall be corrected as per standard.

Advan D&I Gusan Hilalco Samjin Seoyong

Immediate

OPEN

BARAKAH NUCLEAR POWER PLANT PROJECT

BARAKAH NUCLEAR POWER PLANT PROJECT

DATE : 8-12 January 2013

As of 01/12 Total ATTENDANCE 127

TIME : 1-hour session

Training Provider : HSJV HSE Training Team


Regulations : ADEHSMS requirement BNPP ratio of 1:25 Purpose : Review first aid role and techniques

BARAKAH NUCLEAR POWER PLANT PROJECT

System support : Any temporary structures used in construction to support spanning or arched structures. Erectors : Trained scaffolders Reference Procedure : Scaffolding, P21 False work, P29

BARAKAH NUCLEAR POWER PLANT PROJECT

BARAKAH NUCLEAR POWER PLANT PROJECT

DESCRIPTION Basic PPE acquires intentional damage and vandalism. Workers apply artistic writings, drawings, stickers on PPE making it untidy.
BARAKAH NUCLEAR POWER PLANT PROJECT

BARAKAH NUCLEAR POWER PLANT PROJECT

(This Week From Jan 5 Jan 11, 2013)

Item
Near Misses
Over speeding
First Aid Cases (FA) Medical Treatment Cases (MTC) Restricted Work Cases (RWC) LTIs Property Damages Vehicle Accidents Environmental Release

Ancillary Area For the Cum Week

Camp Area For the Cum Week

Office Area For the Cum Week

Power Block For the Cum Week

Village 1 For the Cum Week

Village 2 For the Cum Week

HSJV Total For the Cum Week

NMDC Total For the Cum Week

0 0 0 0 0

0 0 0 0 0

0 0 0 0 1

0 0 0 0 1

1 0 0 2 0

1 0 0 2 0

1 0 0 1 1

1 0 0 1 1

0 0 1 0 0

0 0 1 0 0

0 0 0 0 0

0 0 1 0 0

2 0 1 3 2

2 0 2 3 2

0 0 0 0 0

0 0 0 0 0

0 0
0 0

0 0
0 0

0 0
0 0

0 0
0 0

0 0
0 0

0 0
0 0

0 0
0 0

0 0
0 0

0 0
0 0

0 0
0 0

0 0
0 0

0 0
0 0

0 0
0 0

0 0
0 0

0 0
0 0

0 0
0 0

For this week One Strike Policy 0

Cumulative 105*

Legend : Ancillary Rebar Shop, Batch Plant, Paint Shop, Heavy Equipment Shop Power Block Cut Off Wall, Wharf Area, Concrete Block Area * : 41 cases (Oct- Dec. 2011), 64 cases (2012), 0 (2013)
BARAKAH NUCLEAR POWER PLANT PROJECT

(This Week From Jan 5 Jan 11, 2013)


Source: CAR, Near Miss, Observation Cards and Walkthrough

Area

No. of No. of Inspections Findings

KEPCO & HSJV

SUBCON

KEPCO & HSJV


300

SUBCON
289

Ancillary Area Camp Area Office Area Power Block Village 1 Village 2

5
4 5 5 5 5

109
14 65 336 31 36

47
14 27 47 1 2

62
0 38 289 30 34

250 200 150 100 50 0 62 47 14 0

47 38 27

30 1 2

34

Total Findings

591
BARAKAH NUCLEAR POWER PLANT PROJECT

BARAKAH NUCLEAR POWER PLANT PROJECT

(This Week From Jan 5 Jan 11, 2013)

Issued
Findings
K E P C O H S J V
S U B C O N

Status
Total

Open
KEPCO HSJV Subcon KEPCO

Closed
HSJV Subcon

Near Miss CAR OC & WF TOTAL

0 1 0 1

0 36 0 36

1 2 0 3

0 0 0 0

1 78 22

0 172 278

1 114 174 275 0 22 278 300

1 137 453 591

101 450

BARAKAH NUCLEAR POWER PLANT PROJECT

for the Period


Company
D&I Gusan HSJV Hyundai C&I Isam Kabbani Samho Seobon Seoyong Sungchang Yoo A 1

Total Open
Company
D&I Geumhwa Gusan Hyundai C&I Isam Kabbani Samho Seobon Seoyong Sung Chang Yoo A 1

Jan 5 Jan 11, 2013 CCAP CAR/NM


3 1 14 1 2 5 1 6 1 2

December 2012
2 1

January 2013
3 1 1 3 3 2 6 1 2

TOTAL OPEN
5 1 1 1 3 3 2 6 1 3

Youn Chang
TOTAL 1

3
39

Youn Chang
TOTAL

2
6

2
24

4
30

BARAKAH NUCLEAR POWER PLANT PROJECT

(This Week From Jan 5 Jan 11, 2013)


Fire Prevention Plant & Equipment PPE Access & Egress Scaffolding Signs, Barriers & barricades Material Management Color Coding Electrical Safety Waste Management Lifting PTW Working at Height Fall Protection Environmental Health & Welfare Hand & Power Tools Excavation Supervision Poor Illumination Training Hot Works Road Safety LOTO Steel Erection Confined Space Manual Handling

1 1 1 1 1
0

6 6

12

16 15

21 20 19

24 24 23

27

29

37 37

45 44 44 43

Source: CAR, Near Miss, Walkthrough and Observation Card

10

15

20

25

30

35

40

45

50

BARAKAH NUCLEAR POWER PLANT PROJECT

1
Secure acetylene cylinders by chain (Power Block, DOW) Flammable material storage must be made of noncombustible material (Ancillary, Younchang) Keeping flammable materials at designated point (RCB1, Seoyong PB) Ensure correct positioning of MEWP outrigger pads (Ancillary, Samho)

2
Use of face shield and hearing protection on chipping works(CP-I2, Seobon) Cleaning by air blast, workers require use of face shield, mask, and hearing protection (Power Block, Gusan) Worker s engaged in grinding works to use face shield (Power Block, Younchang)

Repair leaking MEWP, clean out any spill (Village 1, Hanlim)


Maintain safe clearance of cranes counterweight and structure (Power Block, Hilalco ) Replace damaged welding clip.(Power Block, Advan)

Allocate fire extinguisher in the tower light (Office Area, Seobon)

Use of safety helmet when working downside of scaffolding(CP-I2 , Jonghap)

Fire Prevention

Plant & Equipment


BARAKAH NUCLEAR POWER PLANT PROJECT

PPE

BARAKAH NUCLEAR POWER PLANT PROJECT

10

20

30

50

60

40

70

Seoyong

Seoyong (PB) TowersTech


Gusan Gusan (PB) Eun min Jong hap Jong hap (PB) Youn Chang Youn Chang (PB) Howsys WBG Lima Hilalco Advan Hanlim Uwell Yoo A Hyundai C&I Samjin Eugene Daemyung Seobon D&I Al Raeel DOW Samho

(This Week From Jan 5 Jan 11, 2013)

BARAKAH NUCLEAR POWER PLANT PROJECT

KEPCO/HSJV SUBCON Manpower

800 700 600 500 400 300 200 100 0

Findings Score = Number of Causal x Risk(Factor Score) 10 8 6 4


5.8
Source: CAR, Near Miss, Walkthrough and Observation Card reported by KEPCO & HSJV

7.5 6.2

5.4
2.7 0.4 0.7 1.2 0.7 2.5 1 0.6 0.5

4.4
2

2
0

Legend : (I) Infra, (PB) Power Block

Action Plan for Company requiring assistance and support from the system 1. Joint Inspection will be carried out by Area Management Team. 2. Spot Training will be given to workers about major findings 3. Action plan will be submitted to HSJV HSE Team develop by SEOBON
BARAKAH NUCLEAR POWER PLANT PROJECT

BARAKAH NUCLEAR POWER PLANT PROJECT

Fall Protection, 1

Training, 1 Color Coding, 1

Housekeeping, 6

Total No. of Findings: 30


Top Hazards

Scaffolding, 2

Cause Housekeeping PPE

Nos 6 4

PPE, 4 Signs, Barriers & Barricades, 2

Control Measure

Due Date

Supervision, 2

Construction waste materials to be disposed on designated areas and clear all protruding nails.
Ensure that personal protective equipment are in good condition and no damages.

Done
Lifting, 2

Always
Health & Welfare, Fire Prevention, 2 2 Electrical Safety, 2 Working at Height, 3

Source: CAR, Near Miss, Walkthrough and Observation Card

BARAKAH NUCLEAR POWER PLANT PROJECT

Excavation, 1 PTW, 1

Health & Welfare, 1 Lifting, 1 Access & Egress, 8

Total No. of Findings: 23


Top Hazards Cause Access & Egress Signs, Barriers & Barricades Nos 8 7

Waste Management, 1 Scaffolding, 1 Plant & Equipment, 1

Control Measure Provide access in good condition and remove obstructions from walkways. Protruding angle bars and steel rebars should be provided with caps as a protection from workers.

Due Date

Material Management, 2

Done
PPE, 2

Done

Fall Protection, 2 Signs, Barriers & Barricades, 7 Fire Prevention, 3 Housekeeping, 6

Source: CAR, Near Miss, Walkthrough and Observation Card


BARAKAH NUCLEAR POWER PLANT PROJECT

BARAKAH NUCLEAR POWER PLANT PROJECT

AREA : Power Block (Advan)

January 9,2013

CORRECTIVE ACTION:

PLANNED SUPERVISOR PREVENTIVE ACTION

BARAKAH NUCLEAR POWER PLANT PROJECT

AREA : MCO1 (SAMHO)

January 9,2013

CORRECTIVE ACTION:

PLANNED SUPERVISOR PREVENTIVE ACTION

BARAKAH NUCLEAR POWER PLANT PROJECT

BARAKAH NUCLEAR POWER PLANT PROJECT

Inspection Committee inspection Weekly Inspection

Date 2013-01-08 2013-01-09

Attendees HSJV, KEPCO, HSE Management Team HSJV HSE Team

Remark 4 Findings 21 Findings

BARAKAH NUCLEAR POWER PLANT PROJECT

Findings per Company


2.5 2 1.5 1 2 1 1 1 1 2 2

Total

2 1

0.5
0

Advan

D&I

Gusan (PB)

Hwangchon

Hyundai C&I

Samho

Seoyong

Seoyong (PB)

Youn Chang

Findings per Causal


No Fire Extiguisher Flammable Materials No Inspection of Fire Equipment Unoperational Alarm Damaged Fire Equipment Fire Extinguisher Empty 0 1 1 2 3 4 5 6 7 2 3 5 6

Key item : Fire Prevention

BARAKAH NUCLEAR POWER PLANT PROJECT

BARAKAH NUCLEAR POWER PLANT PROJECT

No.

Source of Injury

Area
Advan Concrete Worker

Description

Immediate Action

Planned Supervisor Preventive Action

The patient was working downside of cantilever when a ply board Pain, swelling Power Block accidentally fell down right foot (AB and K Line) from a 2 meter height landing on his right foot 06-01-2013 10:30

Assessment done Elastic bandage applied Analgesic cream applied

HSJV (O&M) Swelling, right hand Cleaner Labor Camp

08-01-2013 07:00

Patient was cleaning one of the rooms in Labor Camp. He was moving the Assessment done bed and accidentally Referred to Ruwais trapped his hand in Hospital for X-ray between the bed and the wall, thus causing the injury.

BARAKAH NUCLEAR POWER PLANT PROJECT

No.

Source of Injury

Area
Seobon

Description
when he walk on the ground for arrange plywood suddenly he stepping on the protruding nail and get injured on his right leg foot pit.

Immediate Action
Wound dressing done Tetanus Injection given at right deltoid muscle Analgesic for pain and Antibiotic given

Planned Supervisor Preventive Action

Pain, injured on his right leg 3 foot pit

Carpenter CPI-2 ADB

07-01-2013 16:30
Seobon Punctured wound nail Right sole Carpenter CPI2 STC building 10-01-2013 21:00

On the way to the bus, the worker stepped on a protruding nail from a wooden block thus caused the injury. The patient was wearing safety shoes..

Wound cleansing and dressing done Tetanus injection given at right deltoid muscle Analgesic given for pain Antibiotic given

BARAKAH NUCLEAR POWER PLANT PROJECT

No.

Source of Injury

Area
Dow Industries

Description

Immediate Action

Planned Supervisor Preventive Action

Punctured wound, left thumb

The worker was doing hammering works in the Wound dressing done AB area Analgesic given for Power Block when a wire punctured pain (AB) his left thumb causing the Antibiotic given injury 09-01-2013 11:00

Foreman

BARAKAH NUCLEAR POWER PLANT PROJECT

No.

Source of Injury

Area

Description

Immediate Action

Planned Supervisor Preventive Action

Hyundai C&I The worker, along with other workers is rolling Abrasion right Village 01 HDC&I the rope when the other end of the rope with 6 thigh secondary Wound dressing done steel plate hit his right to accident Office Area thigh thus causing the injury. 09-01-2013 Banksmen 07:00

BARAKAH NUCLEAR POWER PLANT PROJECT

BARAKAH NUCLEAR POWER PLANT PROJECT

compressor generator without impervious drip tray or spill protection

CAR # 0039
BARAKAH NUCLEAR POWER PLANT PROJECT

Improper chemical storage of Hazardous and Flammable liquids on

Wood cabinet & carton boxes, Combustible and Fire Hazards


Paint Spray, Acetone, Butane Gas, WD 40 All are flammable

CAR # 0070
BARAKAH NUCLEAR POWER PLANT PROJECT

No Bund wall, Drip Tray and Spill kit

CAR # 0105
BARAKAH NUCLEAR POWER PLANT PROJECT

Date Reported

Company

Description Neglected full oil drum with plastic without proper storage

Status

Expiration Date 7-Jan-13

Ref. No.

Main Area

Sub-Area

Issued By

Issuer Company/Dep t. HSJV

Causal Environmenta l Health & Welfare Environmenta l Environmenta l Waste Management Environmenta l Environmenta l Waste Management

UA/UC

2-Jan-13

Seobon

Open

2013-0012

Power Block

Power Block

Renato Ponce

UC

5-Jan-13

Gusan

Unsanitized toilet observed

Closed

10-Jan-13 2013-0038

Power Block

CWIC2

Renato Ponce

HSJV

UC

5-Jan-13

Gusan

Observed pressurized motor water pump operational without drip tray Improper chemical storage of hazardous and flammable liquids

Closed

10-Jan-13 2013-0039

Power Block

CWDC

Renato Ponce

HSJV

UC

8-Jan-13

Youn Chang

Open

13-Jan-13 2013-0070 Ancillary Area

Turbine Shop

Renato Ponce

HSJV

UC

8-Jan-13

Youn Chang

Improper waste management

Closed

13-Jan-13 2013-0071 Ancillary Area

Turbine Shop

Renato Ponce

HSJV

UC

9-Jan-13

Yoo A

Unbunded chemical storage with hazardous materials inside paint shop Unbunded chemical storage with hazardous materials inside paint shop

Open

14-Jan-13 2013-0104 Ancillary Area

Paint Shop

Renato Ponce

HSJV

UC

9-Jan-13

Yoo A

Open

14-Jan-13 2013-0105 Ancillary Area

Fabrication Shop

Renato Ponce

HSJV

UC

9-Jan-13

Yoo A

Paper waste skip bin mixed with plastic waste

Closed

14-Jan-13 2013-0106 Ancillary Area

Fabrication Shop

Renato Ponce

HSJV

UC

BARAKAH NUCLEAR POWER PLANT PROJECT

WASTE TYPE
Paper Metal Construction Concrete Wood(Good) Wood(Bad) Plastic Municipal Hazardous Total Solid Waste

WASTE MANAGEMENT UPDATE Week =03/01/2013 09/01/2013 This week


Collected (m3) Disposal (m3) Recycled (m3) Recycle(%)

Last week
Recycle(%)

Collected (m3) Disposal (m3) Recycled (m3)

56 40 104 0 0 136 112 0 8 456

0 0 315 0 0 90 0 304 8 717

0 8 0 45 0 0 0 0 0 53 6.90%

72 24 104 0 0 136 88 0 16 440

0 0 315 0 0 90 0 264 16 685

0 45 0 0 0 0 0 0 0 45 6.50%

Legend: Collected - Waste from Site to Temporary Storage Area Disposal - Waste from Temporary Storage Area to Landfill Area Recycle - Treated waste ( GMET) to Recycling Plants BARAKAH NUCLEAR POWER PLANT PROJECT