Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Disclaimer
The views expressed here contain information derived from publicly available sources that have not been independently verified. No representation or warranty is made as to the accuracy, completeness or reliability of the information. Any forward looking information in this presentation has been prepared on the basis of a number of assumptions which may prove to be incorrect. This presentation should not be relied upon as a recommendation or forecast by Global Coke Limited.
At the pithead, run by the miners At the plant head, run by the steel makers
India is unique
Not Unless
They secure supplies Attain minimum scale of operations Co generate electricity Master the art of blending Optimise the logistics
Assured quality
Extremely favourable logistic costs Long term contracts with mining companies
mechanism Additional benefits of Carbon credits Trained manpower Professional management with proven capabilities of unlocking values and wealth creation
control of logistics Berge operations in Mozambique Advantage of prime mover in emerging destination
Future Plans
Million ton plants in all four corners of India Coal Washery in Mozambique Secure supply route from Mozambique Aggressively acquire overseas asset plays
Points to ponder
Indias energy hunger does not mean that we
will consume all that we produce India can cater to markets both in Europe and the Far East Possibilities joint ventures
usage More co operation between stakeholders For sustainable development Inclusive growth Wealth creation
TWO PREDICTIONS
Coke will become increasingly dearer calling
Steel Competitiveness
Thank You