ENE040613040018 HUAWEI BSC6000

Deployment Guide
www.huawei.com

ISSUE 1.0
GSM BSS Training Team

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

The course tells the preparation for the deployment of HUAWEI BSC6000, and describes the deployment procedure and noteworthy issues of the following three operations: Hardware installation Software installation Commissioning, acceptance test, and cutover

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 2

Reference
Guide to HUAWEI BSC6000 Deployment

HUAWEI BSC6000 Hardware Installation Manual


Version Upgrade Guide

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 3

Target
At the end of the course, the students can: Get a grasp of the preparation for the deployment of BSC6000 Get a good grasp of the hardware installation process

and noteworthy issues during the deployment


Get a good grasp of the process of software upgrade, commissioning, and noteworthy issues of BSC6000 Get a grasp of the methods of acceptance test and

cutover during the BSC6000 deployment

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 4

Chapter 1 Preparation for the Deployment Chapter 2 Hardware Installation and Check Chapter 3 Software Installation and Commissioning Chapter 4 Cutover and Acceptance Test

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 5

Engineering Preparation
Software version Apply for the software version Software on

http://support.huawei.com/
Apply for the License Data preparation Have the data upgrade tool available Make off-line configuration according to the data provided by the customer Resource preparation Human resource Documents Tools and instruments
HUAWEI TECHNOLOGIES Co., Ltd.
Page 6

HUAWEI Confidential

Engineering Preparation
For the deployment, the following information and documents need be obtained: Contract information (about the product configuration) Goods information Survey Report Installation Environment Check List Customer information (Information such as order delivery information of the contract and contract number can be obtained from the EPMS system.) Engineering Document Notes According to demands, determine whether to create the Engineering Implementation Scheme Check whether the equipment room meets the installation requirements, and whether the mains power, the distribution frame, and ground cable are available. For specifics, refer to the Installation Environment Check List.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 7

Chapter 1 Preparation for the Deployment

Chapter 2 Hardware Installation and Check


Chapter 3 Software Installation and Commissioning

Chapter 4 Cutover and Acceptance Test

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 8

Hardware Installation and Check


Hardware installation and check include the following issues: Hardware installation procedure

Hardware installation preparation


Hardware installation Noteworthy issues Quality check

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 9

Hardware Installation Procedure


The right flowchart shows the hardware installation procedure. Notes: Before the installation, know well about related content in the Survey Report. In the equipment room, a cabinet can
Install internal components of the cabinet Install the cabinet Install the external power cable Prepare for the installation Cabling rack (upward/downward cabling)

be installed on either raised floor or


cement floor, so pay attention to related noteworthy issues according to the actual situation.

Install boards
Install signal cables Install the cabinet and other fitting parts Install the LMT computer and alarm box Check of hardware installation

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 10

Prepare for the Installation


Obtain the following technical documents Documents offering guidance of the installation: network planning, floor plan, detailed construction drawing, and cabling diagram Product manual Other related documents: contract or agreement, equipment configuration table, and goods delivery list. Arrange the construction personnel Have the installation tools available: tools and meters Check the installation environment: check the installation environment according to the Installation Environment Check List. Unpacking check Check the package Open the wooden case Open the carton Check goods

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 11

Install the cabinet

Cabinet installation on raised floor

Confirm the installation position of the cabinet

Confirm the installation position of the rack Cabinet installation on cement floor Install the rack

Confirm the installation position of the cabinet


Install the cabinet Install the cabinet Insulation test Insulation test No No No Has the test passed or not? Yes Yes Connect the combining cabinets Recover the antistatic floor Installation is complete Installation is complete Connect the combining cabinets Has the test passed or not?

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 12

Install the External Power Cables


A cabinet need the following external power cables: Two external -48V power cables (blue, 25mm2) connecting to the cabinet Two external GND power cables (black, 25mm2) connecting to the cabinet One external PGND cable (Kelly, 25mm2) connecting to the cabinet Three PGND cables interconnecting the combining cabinets (Kelly, 6mm2, equipotential connection cables, three PGND cables connecting two adjacent cabinets, ensuring equal potential among combining cabinets)

The below picture shows the connection of external power cables:

PDF
48V1 48V2 GND PGND 48V1 48V2 RTN PGND

BSC6000 cabinet
HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Confidential
Page 13

Install the External Power Cables


PDF and the power distribution box of BSC6000 cabinet

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 14

Install the External Power Cables


Notes for installation of external power cables Ensure the standard and neat layout of cables

Ensure the standard and neat binding of cables


Test the power supply function

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 15

Install the External Power Cables


Test the power supply function Confirm that the switch of the tributary, through which PDF provides power to the BSC6000 cabinet, is set to OFF. Confirm that all switches on the power distribution box of the BSC6000 cabinet are set to OFF. Use a multimeter to test the voltage of -48v input terminal1 and -48v input terminal2 of the power distribution box. If the voltage is over 0.1v, then if the distribution cables are correct, the PDF power supply switch is invalid, so please replace the power supply switch. If the distribution cables are incorrect, connect the cables again. Set the power supply switch corresponding to PDF to ON.

Measure the input voltage of the BSC6000 cabinet. The voltage should
ranges between -57V and -40V. Set the power distribution switch corresponding to PDF to OFF.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 16

Install internal components of the cabinet


Install the internal components of the cabinet in the following order: GBAM server LAN Switch KVM Subrack A service cabinet need be installed with only subracks.

Notes of installation:
Before installing internal components of the cabinet, set all power supply switches on the power distribution box of the cabinet to OFF. During installation, ensure that all rack-mounting ears are orderly and that

there are equal distances between components, equal distances between


components and blank panels, and equal distances between blank panels, and avoid any too big distance.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 17

Install Subracks
The switch state ON means 0 and OFF means 1. The highest bit of DIP corresponds with the highest bit of the byte.

Bit 1 2 3 4 5 6 7

Meaning Subrack number control bit Subrack number control bit Subrack number control bit Subrack number control bit Subrack number control bit Odd parity check bit It is undefined, and is generally set as 0. The automatic DIP bit of the GSCU board in the central subrack is: 0, the starting of boards is highly dependent on the GBAM server, namely that the boards load from the server after starting. 1, the starting of boards is less dependent on the GBAM server, namely that the boards check the validity of the Flash file when starting, and load from the Flash file if the Flash file is valid or load from the server if the Flash file is invalid.

The odd parity check is used for DIP. In the


eight DIP bits, the quantity of 1 must be odd. Use the following method to set: First set the DIP bit 15 and 8. DIP bit 7 is generally 0.

Then count the quantity of 1 in the current DIP


bits. If the quantity is even, set DIP bit 6 as 1. If the quantity is odd, set DIP bit 6 as 0.
8
1 8

ON

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 18

Install Signal Cables


A BSC6000 cabinet need be installed with the following signal cables: Monitor signal cable of the power distribution box

GTNU cross-connect cable


Network cable (including GSCU interconnect network cable and other network cables) Y-shape clock cable Trunk cable (including trunks cables of the Abis, Ater, A, and Pb interface)

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 19

Layout Principles of Signal Cables


Because a large amount of cables need be distributed in a BSC6000 cabinet, comply with the layout principles when performing capacity expansion and distributing cables to avoid waste of the cabling space and affect of the subsequent capacity expansion. The principles of capacity expansion are as follows: Add cabinets from left to right (when facing the rear of the cabinets) Add subracks from bottom to top Add boards from the middle to two sides In the upward cabling or downward cabling mode, distribute cables in the same sequence and the principle is as follows: All cables coming out of the front of the cabinet are distributed at the front of the cabinet and all cables coming out of the rear of the cabinet are distributed at the rear of the cabinet. When distributing cables at the front of the cabinet, first distribute signal cables from the GSCU board and then distribute signal cables from the GGCU board. No sequence is required to distribute other signal cables. When distributing cables at the rear of the cabinet, first distribute trunk cables and then distribute optical fibers.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 20

Notes
Notes about the installation When distributing signal cables, do not destroy the jacket of the

signal cables.
If a signal cable need be pulled out, hold its connector instead of pulling the cable, so that the signal cable is not damaged. The manual describes only the installation method. To determine the actual installation positions of the cables, comply with the requirements concluded by the survey and refer to the data configuration scheme.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 21

Cable Distribution Requirements


The bending radius of all cables should be not smaller than the required minimum bending radius. All cables should be distributed in a standard and neat way.

All cables should be bound in a standard and net way.


Cable Network cable Trunk cable 75 coaxial clock cable Y-shape clock cable
R

The minimum bending radius 25mm 40mm 45mm 25mm 35mm 25mm 25mm 25mm 40mm
Page 22

GTNU cross-connect cable


Cable tie Cable tie

Interconnect cable between GSCU subracks Signal cable of alarm box Monitor signal cable of power distribution box Optical fiber

Correct

Incorrect

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Install Monitor Signal Cable


The power distribution box of a cabinet is connected only to the monitor port of the bottom subrack in the cabinet. Insert one end of the monitor signal cable of the power distribution box to the MONITOR socket on the metallic screen board. Lead
Subrack Power distribution box COM4

the monitor signal cable through the cabling


trough to the side of the cabinet, and along a post to the COM4 interface at the rear of the power distribution box, and then insert

the other end to the COM4 interface.

MONITOR

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 23

Install Monitor Signal Cable

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 24

Installing Inter-GTNU Cables


Install the GTNU cross-connect cable,
as shown in the below picture.
Pin14 A W1 Pin1 A X2 X1 W2 W4 X4 W3 X3 Pin14 B 1 2 3 Pin1 B

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 25

Installing Inter-GTNU Cables


Full interconnection is used for different
GTNU subracks. Full interconnection between GMPS and GEPS Full interconnection between GTCSs The Interconnecting of GTNU cross-connect must be same to data configuration Right figure shows how to connect interGTNU cables between subracks.
1
GTNU GTNU

0
GTNU GTNU

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 26

Installing Inter-GTNU Cables


Right figure shows how to connect the inter-GTNU cables in 3 subracks (1 GMPS+2 GEPS, or 3 GTCS).
0
GTNU GTNU

1
GTNU GTNU

2
GTNU GTNU

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 27

Installing Inter-GTNU Cables


Right figure shows how to connect the inter-GTNU cables in 4 subracks (1 GMPS+3 GEPS, or 4 GTCS).
0
GTNU GTNU

3
GTNU GTNU

1
GTNU GTNU

2
GTNU GTNU

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 28

Installing Ethernet Cables


Network cables to be installed fall into the following types: Inter-GSCU Ethernet cables

Ethernet cables between the GSCU and the GBAM


Ethernet cables between the LAN switch and the GBAM Ethernet cables between the LAN switch and the LMT or the M2000/LAN Ethernet cables between the LAN switch and the CBC

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 29

Installing Inter-GSCU Ethernet Cables


Connecting inter-GSCU Ethernet cables between subracks

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 30

Installing Inter-GSCU Ethernet Cables


Interconnection between GSCU subracks Star-shape interconnection between GMPS and GEPS Star-shape interconnection between GTCSs When installing interconnect network cables between GSCU subracks, use different ways for the following two
0
GSCU GSCU

situations:
The GSCU subracks to be connected are in the same cabinet. The GSCU subracks to be connected are in different
1
GSCU GSCU

cabinets.
Connecting inter-GSCU Ethernet cables in 2 subracks as shown in the right picture.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 31

Installing Inter-GSCU Ethernet Cables


Connecting inter-GSCU Ethernet cables in 3 subracks as show in the right picture.
0
GSCU GSCU

2
GSCU GSCU

1
GSCU GSCU

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 32

Installing Inter-GSCU Ethernet Cables


Connecting interGSCU Ethernet cables in 4 subracks as show in the right picture.
0
GSCU GSCU

2
GSCU GSCU

1
GSCU GSCU

3
GSCU GSCU

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 33

Installing Y-Shaped Clock Cables


The below picture shows the GTNU cross-connect cables.

1 W2

1
8 1

8 1

X2 W1 X1 W3 X3
8 1

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 34

Installing Y-Shaped Clock Cables


The right picture shows the connection of clock cables between subracks.
GMPS
GGCU GGCU

GEPS
GSCU GSCU

GEPS
GSCU GSCU

GEPS
GSCU GSCU

CLKIN

CLKIN

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 35

Installing Trunk Cables


Distribute trunk cables according to the following orders: Distribute trunk cables from the bottom subrack to the top subrack in the same cabinet. Distribute trunk cables from the middle to the side boards in the same subrack. Distribute trunk cables leftwards from Slot 20 to Slot 27 and rightwards from Slot 19 to Slot 14. Distribute trunk cables from the bottom DB44 interface to the top DB44 interface on the same board. Interconnect trunk cables of different equipment according to the following principles: Connect the TX of trunk cable E1 at the BSC6000 side to the RX of E1 of the peer equipment. Connect the RX of trunk cable E1 at the BSC6000 side to the TX of E1 of the peer equipment. Decide which pair of E1 at the BSC6000 side interconnects to which pair of E1 of the peer equipment according to the specific data configuration. Before interconnecting different types of cables, for example 75ohm coaxial cable and 120ohm twisted pair, use multiplexers or tielines to transduce the impedance.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 36

Installing Trunk Cables


Set the DIP switch of GEIU according to the actual situation at the site.
Switch DIP bit S1 1 Description Impedance selection switch of No.0~7 E1/T1 75 ON 120 OFF

2
3 4 5~8 S3 S4 S5 1~8 1~8 1~8

Impedance selection switch of No.8~15


Impedance selection switch of No.16~23 Impedance selection switch of No.24~31 Idle Transmit end PGND selection switch of No.0~7 Transmit end PGND selection switch of No.8~15 Transmit end PGND selection switch of No.16~23

ON
ON ON ON ON ON ON

OFF
ON

OFF OFF OFF OFF OFF

S6

OFF ON

ON S1 OFF

S5

OFF

ON S4 OFF

ON S3 OFF

OFF

S6

1~8

Transmit end PGND selection switch of No.24~31

ON

OFF

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 37

Distribution Order of Trunk Cables


Distribution order: A -> B -> C -> D
GEIU GEIU

E1/T1(24~31)

E1/T1(24~31)

E1/T1(16~23)

E1/T1(16~23)

E1/T1(8~15)

E1/T1(8~15)

E1/T1(0~7)

E1/T1(0~7)

Active A BC D
HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Confidential
Page 38

Standby

Installing Trunk Cables


1 2 3 4 1

5 5

6 6

Rear of the cabinet

Side of the cabinet

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 39

Install Other Components of a Cabinet


Install the following components of a cabinet Install the side door

Install the front door and rear door


Install the PGND cable of the cabinet door Attach an engineering label to the cabinet

HUAWEI
Product label

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 40

Hardware Installation Check


Hardware installation check includes the following items: Check the installation of the cabinet (refer to the Cabinet

Installation Check List in the Installation Manual)


Check the installation of the cable (including the power cable, PGND cable, and signal cable) Check the installation of local maintenance terminal and alarm box Power on and check Check the environment sanitation of the site

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 41

Power On and Check


Check before power-on Check and ensure that no board is inserted in the slots on the backplane. Power on the power distribution box and check. After ensuring that the cabinet is powered off, use a multimeter to test the resistance of each power wire post on the cabinet top and grounding wire posts to check for short circuit. After ensuring that all switches of the power distribution box above the cabinet are turned to OFF. When the power supply switch of the tributary, through which PDF supplies power to the BSC6000 cabinet, is in no-load mode, use a multimeter to check whether the output voltage of PDF is in the required voltage scope (57V~-40V). At the moment, the RUN indicator on the power distribution box

Power on the cabinet

should blink.
When PDF normally works, turn the switches of the power distribution box to ON one by one and use a multimeter to check whether the output voltage of the power distribution box is in the required voltage scope (-57V~-40V).

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 42

Power On and Check


Power on and check each module in the cabinet: Check whether the fan can normally work. Check and ensure that no board is inserted in the slots. Turn all the power supply switches, which control the subrack power, on the power distribution box to ON. Turn on the power switches of modules such as the server and KVM one by one to check whether the equipment can normally work. Check the power supply state of the components inside the cabinet. Turn all the power supply switches, which control the subrack power, on the power distribution box to ON. Insert the boards one by one. only if the indicator is normal. If a board is abnormal, turn off the power switches, remove all inserted boards, and confirm the cause of the fault. Power on and check boards:

Note: Check the boards indicator after inserting a board. Insert the next board

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 43

Power On and Check


The below picture shows the power controlling of each module in the cabinet by the power distribution switches of the power distribution box.

Assignment of Switches

SW1SW4

GEPS/GTCS

SW2SW5

GEPS/GTCS

SW3SW6

GEPS/GTCS

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 44

Check the Environment Sanitation of the Site


Do not pile up packages and boards in the equipment room in a disorderly way, but put them neatly in the equipment room.

Do not leave cable ties or any other thing in the cabling rack (trough), at
the cabinet bottom, or around the cabinet. Do not leave cable ties or any other thing below the raised floor. After installation is complete, restore the raised floor to keep it smooth and clean.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 45

Chapter 1 Preparation for the Deployment Chapter 2 Hardware Installation and Check Chapter 3 Software Installation and Commissioning Chapter 4 Cutover and Acceptance Test

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 46

Summary
Software installation Software structure

Install OMU software


Install LMT software Download the software of BSS board Software commissioning Network commissioning Prepare for the commissioning Commissioning procedure Service test

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 47

Software Layout
The software of BSC6000 uses a distributed structure and includes the board software and Operation & Maintenance software. The board software, which is distributed among all boards of BSC6000, includes the following types: Board version software Patch software Bios software The Operation & Maintenance software includes the following types: OMU software LMT software M2000 network management software

Software installation process:


Install OMU software Install LMT software Download the BSS board software

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 48

Software Description
Software Function Installation time Before delivery Before delivery Suse Linux Enterprise Server 9.0 It provides an operating platform for the OMU software
Windows2000 Professional(SP4)/ Windows XP Professional(SP2)

It provides an operating platform for the LMT software

OMU software

It operates on the GBAM server and finishes the Operation & Maintenance function of the system.
It performs the maintenance function through the OMU software on the GBAM server.

At the site

LMT software

At the site

BSS board software

It includes the radio resource processing At the site software, resource controlling plane software, BTS management software, and configuration management software, which implement functions of different entities.
HUAWEI Confidential
Page 49

HUAWEI TECHNOLOGIES Co., Ltd.

Networking Diagram
Networking scheme Use Port10 of GSCU in the basic subrack to interconnect GSCU and the GBAM server. Port10 on the active and standby GSCU in the basic subrack form
EHT 10 GSCU

GMPS
GSCU

Intranet 80.0.X.X

EHT 10

a Trunk group to avoid affect on


communication when the network interface of GSCU or GBAM server has faults.
GBAM
eth0 eth2 eth1

Connect both internet interfaces


of the GBAM server to the same LAN Switch.

LAN Switch
Internet

LMT

M2000

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 50

Prepare for the Installation of OMU Software


Obtain the installation information (make records in the Installation Information Record Table) The root user of GBAM server: The root user name is root and the initial password is 11111111. Samba user name: The initial user name is bsc6000 and the initial password is 11111111. The initial IP of the server: At the initial state, no setting is made for the four network cards. It is necessary to obtain the internet IP, subnet mask, and default gateway, which are to be allocated for the GBAM server. Check the settings of the server (refer to the chapter about the settings of server in the Software Installation Manual) Check the version of the operating system Check the partition rules of hard disk Check the memory size Check configuration information of the network cards Check the settings of the Samba directory Check the connection of KVM

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 51

Install the OMU Software


Use the following two methods to install the OMU software: When being not at the deployment site, install the OMU software through the network. When being at the deployment site, run the disk of OMU software in the disk drive of the GBAM server to install the OMU software. Install the OMU software by running the disk Put the OMU install disk in the disk drive of the GBAM server. Log into the GBAM server as root user. Type in the cd /media/cdrom command and change the current directory to /media/cdrom. Type in the rpm -ivh omu-9.1-1.i586.rpm command. Type in the omuctrl cfg command. Configure the network interface according to the prompt and start the OMU software. Type in the omuctrl status command. Check the operating state of the OMU software to ensure that the installation is complete.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 52

Install the LMT Software


After the local maintenance terminal of BSC6000 is installed, the menu includes the following parts:

BSC6000 local maintenance terminal


BSC6000 BTS maintenance terminal Alarm transfer tool Uninstall Huawei local maintenance terminal Performance browse tool

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 53

LMT Directory Structure


Folder FtpServer SWM Bin Description FTP SERVER program folder BSC board software management folder The folder where executable programs of the BSC6000 local maintenance terminal are saved BSC object folder The folder of BTS maintenance terminal BTSM program BSC6000 The folder where configuration files are saved

BscObj Btsm Cfg

Convert
Help pfbTool Uninstall

The folder of alarm convert tool program


The folder of LMT Help files The folder of performance browse tool program The folder of uninstall program files and uninstall log files
HUAWEI Confidential
Page 54

HUAWEI TECHNOLOGIES Co., Ltd.

Download BSC Board Software


Download BSC board software Copy the complete set of issued software to the directory

Common\SWM\Software of LMT.
Log into the BSC6000 local maintenance terminal, in the menu select BSC software > BSC software maintenance > Download software and finish downloading according to instructions of the

wizard.
Query software information in the OMU version area. Notes If the downloading fails, restart and download again.

Give English names to the downloaded files.


Halt of the downloading does not affect the whole downloading process.
HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Confidential
Page 55

Download BTS Board Software


Download BTS board software Copy the BTS version software to HW LMT\Common. Log into the BSC6000 local maintenance terminal, in the menu select BTS maintenance

> Download BTS software, and finish software downloading according to instructions of
the wizard. Notes BTS board software support only the file name with .bin or .hex as its suffix. Do not change the file name of BTS board software.

If on the GBAM server, a files name is the same as the downloaded file, the file on the
GBAM server will be overwritten. The system gives no prompt about the overwriting. So it is recommended to make backup of the files on the GBAM server before downloading to avoid data loss.

If the downloading state is waiting for download, wait for the response from the FTP

server.
In the downloading process, if the downloading of a file is halted the files following continues to be downloaded. If the downloading process is existed midway, the file currently being downloaded will be downloaded, but the files following will not be downloaded.
HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Confidential
Page 56

Commissioning Process
For specific methods and procedure of
Prepare for Commissioning Load BSC software Load BTS software Verify the Abis interface Verify the Ater interface Verify the A interface

commissioning, refer to
the Commissioning Guide.

Verify the Pb interface


Interconnect BSC to M2000
HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Confidential
Page 57

Prepare for Commissioning


Prepare for commissioning Ensure that the OMU software is installed.

Ensure that the LMT software is installed.


Check the network connection and ensure that LMT can log into the GBAM server. Samba service can be normally started.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 58

Load the BSS Software


The process of loading BSC software: Check the GBAM version area Load the software Trigger the software Query the board software Query the board state The process of downloading BTS software: Download the BTS software (The downloading of BTS software is complete during software installation.) Configure the BTS software Load the BTS software

Query the BTS attribute


Trigger the BTS software Query the board information

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 59

Commissioning of BSC at the Local Office


Change over the active and standby boards:

check the changeover


function of the boards working in the active and standby state Query the software license: check whether the License configuration information becomes effective

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 60

Interface Debugging and Service Test


Interface debugging: The methods of debugging the Abis, Ater, A, and Pb interfaces are given in the lesson of software debugging. Service test

Dialing test of basic services


Basic service Dialing test process Expected result

Speech service

MS calls local PSTN subscribers or The connect success rate exceeds local PSTN subscribers call MS for 50 90%. The voice is clear and has no times respectively. obvious noise.
MS calls MS for 50 times. The connect success rate exceeds 90%. The voice is clear and has no obvious noise. The faxes are correctly transmitted and received. The data rate is basically the same as the tested data rate in lab.

Data service

MS sends faxes to facsimile machines, and facsimile machines send faxes to MS. Test the GPRS or EDGE function of MS.

Operation & Maintenance management

During operation, change over boards The changeover success rate exceeds for five times. 90%, and the service is not interrupted by the changeover.
HUAWEI Confidential
Page 61

HUAWEI TECHNOLOGIES Co., Ltd.

Service Test
Service test
Dialing test of feature services
Feature services Dialing test process Use a dual-mode mobile phone to switch over from GSM network to UMTS network and from UMTS network to GSM network for 50 times respectively. Expected result The connect success rate exceeds 90%. The voice is clear and has no obvious noise.

Inter-system switchover

Location service

Make an MS initiate a call and The position of MS meets keep connection, and locate the the accuracy MS. requirement.

AMR service

MS calls PSTN subscriber and selects AMR as the speech version. Test for 50 times.

The connect success rate exceeds 90%. The voice is clear and has no obvious noise.
Page 62

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Chapter 1 Preparation for the Deployment Chapter 2 Hardware Installation and Check Chapter 3 Software Installation and Commissioning Chapter 4 Cutover and Acceptance Test

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 63

Preliminary Acceptance Test


Prepare for the preliminary acceptance test Before the preliminary acceptance test (PAT), the engineering supervisor makes the following preparation: sorts out project completion documents works out the Preliminary Acceptance Test Scheme Submit the Preliminary Acceptance Test Application Report to the customer Understand the customers special requirements about the PAT, and confirm the schedule and items of the PAT. Check whether the customer has required necessary tools, test instruments and meters. Preliminary acceptance test The engineering supervisor and the customer organize the PAT. The customer manager, service manager, or project manager of the region can participate in the PAT. After the PAT passes, hand over project completion documents to the customer. Fill in the Document Handover List and have the customer sign on the list to confirm. After the PAT is complete, have the customer sign or stamp on the Equipment Installation Report and the Certificate of Preliminary Acceptance.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 64

Cutover
Cooperate with the customer to work out the Cutover Scheme according to the demands. Confirm the responsible persons and duty division of both parties. Negotiate with the customer about how to guarantee the success of the equipment cutover and about the remedy measures in case of cutover failures. Arrange personnel to observe operation of the equipment. Noteworthy issues during cutover: Designate the responsible persons for each operation. Take the next step only after ensuring that a step is complete. Two operators are required for those important steps. Designate responsible departments and persons for each cutover step and the dialing test. If the cutover is not complete, the dialing test fails, or the success rate is lower than 80% by MM-DD XX:00, unconditionally back off the cutover.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 65

Dec. 31 2006

Internal Use (Only)

Thank You