Dynamic Scheduling A Team Approach to Increase Worker Performance & Reduce the Risk of Cost and Schedule Over-runs Best Management Practices Presentation themes:
Establishing Key Performance Indicators and Targets Using Benchmark Estimates for Job Plans Programming versus Scheduling (Dynamic Scheduling) Receiving accurate and timely activity status from the field Maintaining Control of Shift Reports Trending and Performance Analysis The Dynamic Trio
Organization
Asset Management Team
Technical
Operations
Maintenance
Project Manager
Core Team
Operations Maintenance Safety Environment Inspection Admin Supply Chain Engineering Project Controls Materials
Project Controls
Manager Area Field Planners Programmer / Scheduler Area Operations Coordinators Area Safety Coordinators Administration
Dynamic Trios
Area Execution Coordinators Area Operations Coordinators Area Safety Coordinators
Vision Statement Operate a safe and reliable process for a predetermined run duration at design rates
Established by the Asset Management Team (Leaders Team)
Supported by effectiveness of workscope optimization Supported by a Steering Committee (Core Team) made up of Stakeholder Department Leads Approved by Senior Management / Partners
Mission Statement Plan, manage and control all aspects of the outage project using a defined process to meet or exceed Key Performance Targets
Established by the Steering Committee (Core Team) Supported by efficiency of the Project Controls Group Approved by the Asset Management Team (Leaders Team) Must be measurable (accountability, responsibility and consequences)
4a - Budget
4b - Schedule Duration
Plan activity logic networks, resources, programming logic; estimate wrench-hours and activity durations
Use consistent data codes and structure
Unit
Unit
System
Maintenance Pre Shutdown Decontaminate Blind Clean Open Inspect Repair Phase Horizontal Safety Valves
Productivity Factors
Input / Information from the Project Controls Group
Process availability Resource limits, i.e., cranes, inspectors, operators Equipment priority Risk
Construction Projects
Resource and commodity driven Level resources by trade High level planning by WBS Schedule to produce a plan that meets the engineering and procurement process by contract and/or discipline; i.e., civil, structural, mechanical, electrical, etc. Produce a Gantt Chart every week Re-schedule weekly to produce a new plan (Gantt Chart) Manage human resources Supervise work activities
Produce a tabular shift report every 12 hours Re-schedule every 12 hours during the Execution Phase to produce a new plan based on current conditions (Shift Report) Manage work activities not human resources Supervise human resources
Resource leveling
Milestone driven Activity constraints, i.e., mandatory start / finish
Task dependent, i.e., activities from one network are dependent on activities from other networks
Developed in isolation by a Scheduler over a number of weeks to produce a level resource profile and a Gantt Chart Very difficult to make changes to a plan that took 2 months to develop
Scheduler loses credibility by Field Forces due to the lack of project control
Updates from the Field Forces are difficult to obtain
Reacting to changing conditions is almost impossible due to the constraints in logic and dependencies
Scheduling software cannot calculate a new plan due to the constraints applied by the Scheduler, or the lack of programming information
A Programmer (aka Scheduler) establishes the project parameters as defined by the Dynamic Trio and inputs the data from the Field Planning Form
Use Productivity Factors based on Key Performance Target for Wrench-time and Contracting Strategies Use the software program to produce a plan by calculating, not leveling
Optimize the plan by calculating What-if scenarios based on Productivity Factors, Calendars, WBS, Resources, etc.
Restricted Resources
Resource Calendars set to 24 Hours unless resource is restricted to one shift Resources include:
People Materials Equipment / Tools Instructions
Calendar Driven
WBS
Calendar Risk
Grid
Phase Work Type
Permit
Activity Type
Schedule
Resources Float
Receiving accurate and timely activity status from the field Best Management Practices
Each Area Execution Coordinator updates their Area Shift Report with a 0% - 50% - 100% value Update Shift Reports are brought to the Programmer (dayshift / nightshift) between 3 4 oclock Failure to update the status of all activities by their assigned Area will result in the Operations Coordinator not being able to assist the Programmer with developing a new plan The process of updating status accurately and in a timely fashion is self-controlled by the Dynamic Trio themselves
Earned Wrench-hours
New schedule affected by activities not completed as per plan plus added and extra work
New Target
The Dynamic Trio will prepare for the next shift of Wench-pullers:
Area Operations Coordinator preps permits Area Execution Coordinator preps tool, materials, equipment and prepares workforce Area Safety Coordinator preps safety equipment, safety resources, procedures, etc.
Corporate Owned
policies and procedures