Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
GENERAL INFORMATIONS
30 after 24 h
Chimeney sweeper: 15 minutes ( post circulation 3 )
SUPERMICRA E ed SE
FUNCTIONING AND FAULTS FINDING TEST The following test must be executed with the help of the boilers Instructions Manual
REMARK: The lasting check must be executed with a tester on the flow of the , after disconnecting the boiler and after disconnecting the connector relevant to the component or circuit to be tested. For the tests on the electrical components check the connections and the contacts of the connections even if not indicated Move the selector on O Does the green led flash? YES Is the red led off?
YES
NO
NO
Are there 230v between the clamp NO L and N of the clamp board M 5 of the main PCB? YES
Check the 230 v net, the cable and the connections Replace the main PCB
If flashing - Replace the NTC sensor If constantly on - Fill the circuit or replace the loss of water pressure switch
Move the selector on SUMMER Is the green led constantly on? YES Move the DHW selector at maximum and open an hot water tap at maximum. Is there production of hot water? YES
NO
NO NO
Open the regulator The membrane NO Replace the DHW micro switch of the water valve is dirty or YES Clean or replace the membrane damaged Replace the main PCB
NO
Is the contact of the NO DHW micro-switch closed?(electrical continuing between 16 and 20 on the main PCB) YES
NO
NO Replace the main PCB Are there 230 v between the clamps of the pump? YES Replace the pump
YES
NO
NO
With the boiler off are the contact C and NC of the flue pressure switch closed? Replace the fan
NO
Replace the pressare switch Replace the main PCB if there are not 230v between 8 and 9 of M2, with the boiler on, if off replace the IONO board
YES
YES
NO Are the ignition electrode and its cable dirty or damaged? YES
For the SE models check that the contact between C and NO of the pressare switch is closed, that the pipes are connected and the pressure switch is efficient
YES
During the ignition process are there NO 230 v on the of the gas valve? ( reset if the boiler goes in block )
YES
Have the 100C safety thermostat NO and the flue thermostat (mod E) the contact closed? YES
Replace the damaged one REMARK: for the flue thermostat check the draught Replace the Iono board
Replace the valve if there is no gas in the network (check of the pressure on the IN plug of the gas valve) Check the regulation of the power of slow ignition and of the minimum power of the gas valve (see the Manual) Is the modulator interrupted or in short circuit? Does the flame stay at minimum or at low power?
NO YES
YES
NO
Has the power of slow ignition been regulated in the correct way? (see the Instruction Manual )
NO
YES
Replace the main PCB Replace the modulator Regulate the max power on the gas valve, as indicated on the manual Replace the Iono board Clean, regulate or replace the IONO electrode Make the cleaning of the DHW exchanger with specific products
NO
SI
NO
Is the ignition electrode dirty, YES badly regulated or damaged? Does the water flow remain low?
NE
YES
YES
NO
NO
YES
YES
Reduce the water flow at the tap or at the regulator Value of the sensor 0C = 33 k 20C = 12,5 k 60C = 2,5 k 80C = 1,3 k
Reduce the water flow at the tap at about NO 5l/min. After some seconds does the flame modulate? YES END OF THE D.H.W. TEST CHECK OF THE HEATING Move the selector in WINTER with the regulation at maxim. NO Does the boiler start working? YES Does the pump start NO working?
YES
Does the NO Regulate the room thermostat room thermosta t ask for YES Make a bridge on the clamps 39 and 40 of M10 of the board: If the heat? boiler works replace the room thermostat. If not replace the main PCB Are the switches 5 and 6 of the board on the pump OFF?
NO YES
NO
Check that the eventual taps or thermostatic valves in the system are open
1) Put the manometer in the outlet test point of the gas valve 2) Take the instruction manual for consultation
3) Open a DHW tap, and after 10set the maximum pressure ( with tool number 10 )
4) To set the minimum pressure (with screw driver ) after disconnecting one cable of the modulator
You can have 30 seconds available, if you turn the heating trimmer leftwards, till the end of the turn.
( start again the 30 with a power reset ) 6) Regulate the Heating power.
At the maximun power on the rigth or at the desired power.