Case 2: EPS90 Testing

Q: How to Test EPS90 sub-rack. A:


Step1: Install PMU and PSU, Connect AC input, disconnect battery, Disconnect
Load1 and Load2, Put off Power switch of the battery; Measure the Voltage between BAT.(+) and BAT.(-), voltage between RTN(+) and Load1(-), Voltage between RTN(+) and Load2(-). All of the voltage should be about 53.5V.

Step2: Uninstall (take off, hot plug ) PMU;


Measure the Voltage between BAT.(+) and BAT.(-), it should be 0V;

Measure the Voltage between RTN(+) and Load1(-), it should be 53.5V.


Measure the Voltage between RTN(+) and Load2(-). it should be 53.5V.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 1

Step3: Install PMU, Put on Power switch of the battery;


Use one cable to short circuit BAT.(-) and LOAD2(-), the voice of contactor be put on should be heard.

Step4: Remove the short circuit cable;


Measure the Voltage between BAT.(+) and BAT.(-), it should be 53.5V.

Step5: Uninstall (take off, hot plug ) PMU;


Measure the Voltage between BAT.(+) and BAT.(-), it should be 53.5V. If all results as same as the up-step, the EPS90 sub-rack is working normally.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 2