Sei sulla pagina 1di 75

Company Profile

www.vikramsolar.c om

Contents
Company Profile Vikram Solar - Vision Ahead Vikram Solar - Product Range Our Commissioned Projects Certifications EHS

Proprietary & Confidential

www.vikramsolar.com

Vikram Group & Vikram Solar - Company Profile

Proprietary & Confidential

www.vikramsolar.com

Vikram Group - Business Interests


Textile Tea Manufacturing Equipments Solar Power Education

Proprietary & Confidential

www.vikramsolar.com

Group Companies
From a single line of business, Vikram Group has transformed itself into a well-diversified group with a strong foothold in Tea Machineries, Textiles, Solar Photovoltaic and Educational Institutes.

Vikram India Limited Worlds largest manufacturer of entire range of Tea Processing Machineries and Turnkey Tea Factory installations.

VIKRAM

Vikram Polyester Pvt Ltd Modern Textile Processing Plant in Surat.

Pioneer Syntex Pvt Ltd A state of art Textile Processing plant in Surat.

Gujrat Hiflow Yarn Limited A state of the art Textile Processing plant in Surat Vikram Solar Pvt Ltd Manufacturer of Photovoltaic Solar Modules and EPC provider.
Proprietary & Confidential www.vikramsolar.com

Ballaram Hanumandas Charitable Trust A network of Boarding Day schools and post graduate engineering college.

Hari Krishna Chaudhary Foundation Running a reputed Degree College.

Vikram Group - 37 years of excellence


Vikram Group

5,000 People 29 Countries Textiles Engineering Education Tea Manufacturing Machineries Solar Photovoltaic

Vikram Solar

600 people More than 12 Countries Module Manufacturing EPC Power Project Installation

Proprietary & Confidential

www.vikramsolar.com

Vikram Solar - Business Interest

Proprietary & Confidential

www.vikramsolar.com

Vikram Solar - An Overview


Company Profile

Established in the year 2006 Started with a base capacity of 12 MW and increased its capacity to 70 MW in a span of six months Solar Power plant developers Increasing capacity by 70 MW: Total capacity-140 MW by August2012 ISO 9001:2008 & ISO 14001 certified

Technology

Using Technology from SPIRE and NPC, leading Solar Photovoltaic Equipment providers from US and Japan respectively

Products

Designs and manufactures PV Solar Modules EPC Turnkey Solutions - Grid Connected - Off Grid

Global Presence

Europe

Asia

Germany Italy Spain United Kingdom

India Bangladesh Nepal

USA Australia Middle East

Africa

South Africa Kenya

Proprietary & Confidential

www.vikramsolar.com

Our Extensive Presence in India

Delhi

Jaipur

Ahmedabad Mumbai Raipur

Kolkata

Pune

Bangalore

Proprietary & Confidential

www.vikramsolar.com

Our Significant Global Presence


Europe
Am Exerzierplatz 68167 Mannheim Germany Email: europe@vikramsolar.com

Europe
C/ Zurbano 29. 28010 Madrid Espa

North America
1064 Van Buren Ave Suit 7- Indian Trail NC 28079, USA Email: infio.usa@vikramsolar.com

Asia
Africa
PO Box No. 17831-00500 Nairobi Kenya Email: africa@vikramsolar.com Tobacco House 1, Old Court House Corner Kolkata, West Bengal - 700001 Email: sales@vikramsolar.com

Proprietary & Confidential

www.vikramsolar.com

10

Technology

Annual, Current, Capacity of 70 MW, increasing to 140MW by August 2012 Technology Partner from Spire Incorporation, USA and NPC Industries, Japan High Efficiency Cells from Motech Industries, Taiwan

Modules in the Power class of 10 wp to 365 wp with 240wp family for 60 cells Modules and 280wp family for 72 cells Modules and 350 wp family panels with the 88 cells.
The only company in India to use Electroluminescence Test for Cells before using in the Modules, to ensure micro cracks free Modules. Current module efficiency around & excess of 15% Well positioned to produce mono-crystalline modules as well Manufacturing process follows the best International Industry Standards and Practices
www.vikramsolar.com 11

Proprietary & Confidential

Board Members
H K Chaudhary, Chairman - Vikram Group
Mr. Hari Krishna Chaudhary is the Chairman and Managing Director of Vikram Group of Industries. Under his able guidance and charismatic leadership, Vikram group has achieved unprecedented success in business and philanthropy. By establishing Vikram Solar Pvt Ltd, Sri H K Chaudhary has ventured into Renewable energy sector to explore and fulfil the growing energy needs of the our country.

Anil Chaudhary, Vice Chairman - Vikram Group


An exemplary leader and visionary at Vikram Group, he also holds a 1st class Degree in BE (Electrical) from Bangalore University and MBA from Jadavpur University. He is presently managing the Group's textile division and power projects.

Gyanesh Chaudhary, Managing Director


He is a dynamic leader and the key driving force of Vikram Solar. A Business Graduate from University of Wales, UK coupled with a Diploma in Marketing & International trade from the Harvard Business School and an executive program in marketing from the University of Boston, his experience and advanced vision provides a strong backbone for Vikram Solar.

Manoj Kumar Sharma, Director


He is one of the chief architects behind the success of Vikram Solar. A Chartered Accountant with an experience of 18 years in all major sectors of business operation, his expertise and knowledge has given a new meaning and perspective of carrying the company to new heights.

Proprietary & Confidential

www.vikramsolar.com

12

Management Team
Fernando Arroyo Villuendas, Managing Director - Vikram Proener Projects Pvt. Ltd.
Fernando has a total experience of over 16 years in various companies like Geocontrol, Construcciones Navarro Piquer, Repsol. His work experience includes 2 years as COO in Constructions Navarro Piquer, 6 years as Maintenance Chief in Repsol. For the last 7 years, he is working at Proener as Managing Director.

Shaibal Ghosh, President - International Business Division


Shaibal Ghosh, a significantly experienced Operations and P&L leader with specialization in Sales & Marketing. Has held top management profit center head responsibilities for the last 17 years, with a total work experience of 22 years. Have had comprehensive professional corporate exposures in dynamic industries such as IT, Telecom, Publishing & core manufacturing, as in Solar Glass & Solar PV modules and has worked globally since 1997 having been posted in various countries.

K K Maskara, Director - Finance & Strategic Initiatives


Kishan Kumar Maskara, a hardworking and enthusiastic upright attitude personnel with innovative nature and ability to dominate work with confidence to achieve targets, having an experience of more than 8 years in accounts, finance and commercial matters.

Manoranjan Khuntia, Vice President - Production


Manoranjan Khuntia, a professional expert in Solar Photovoltaic field having an enrich experience of 18 years in production. He has made a commendable contribution towards setting up of Solar PV module factory at Falta Special Economic Zone and thereafter is responsible of our products strictly in accordance with the quality parameters.
Proprietary & Confidential www.vikramsolar.com 13

Management Team
Partha Debnath, General Manager - Accounts & Finance
Partha Debnath, a result oriented, multi-faceted finance personnel with an overall experience of over 15 years. He is been involved in making strategic decision in multi functional and multi cultural environment in international companies like IT, real estate development, manufacturing, trading, service, agriculture both in India and abroad. He is a Chartered Accountant from The Institute of Chartered Accountant of India. He has also qualified for Certify Public Accountancy examination by California Board of Accountancy, USA.

N. Venkateshwaran Raju, General Manager - Corporate Finance


N. Venkateshwaran Raju, a commerce graduate having more than three decades of experience in the field of finance, accounts and administration. Been finance head of a paper mill having its own co generation power plant in Uttar Pradesh.

Susmita Banerjee, Deputy General Manager - Human Resource


She is a dynamic professional with over 14 years of experience in HRM broadly recruitment, performance appraisal, compensation, industrial relations, policies & procedures and general administration. She is an expert in planning, strategising and implementing HR and IR issues as well as related administrative matters. She has done her MBA from MIM and M. Sc from University of Calcutta. Her association to Vikram Solar extends the improvement in Manpower Resource Management.

Subhendu Roy, Senior VP & Head - EPC Sales


Subhendu, a BE & MBA with an overall experience of 23 years in assisting functional heads in strategic areas of the power plant operation an d the power distribution business. Also, working with Group Heads on various aspects of the companys future projects and business development activities.
Proprietary & Confidential www.vikramsolar.com 14

Vikram Solar - Vision Ahead

Joint Venture Committed Towards Excellence

Proprietary & Confidential

www.vikramsolar.com

16

Vikram Solar - Long Term Plan


300 MW of Photovoltaic capacity across value chain in different phases (except Poly Silicon)
Poly Silicon Silicon Wafer PV Cell Module EPC

100MW

100MW

140MW

350MW

Wafering

Cell/Modules

Module

EPC

Proprietary & Confidential

www.vikramsolar.com

17

Vikram Solar - Backward Integration Strategy


Value Chain Crystalline Solar Cell

Silicon Fab Engineering Key Equipment Consulting

Ingot & Wafer

Cell

Module

Turnkey Line Key Equipment Consulting

Turnkey Line Key Equipment Consulting

Turnkey Line Key Equipment Consulting

Vikram Solar Photovoltaic

Service

Service

Service

Service

Proprietary & Confidential

www.vikramsolar.com

18

Photovoltaic Value Chain


Poly-Silicon Silicon Wafers PV Cell Module

Growing a block/ingot

Cropping

Cutting a block

Grinding edges

Slicing Wafers

The intentions are twofold - control the value chain and create space for technology development

Proprietary & Confidential

www.vikramsolar.com

19

Road Map - Expansion Projection


Year 2012 2013 2014 Wafering (MW) 0 0 0 0 Cells (MW) 100 100 +100 200 Modules (MW) 140 (Expanded) 140 +70 210 IPPs(MW) 20 70 70 160

250
200 150 100 50 wafering (MW) Cells (MW) Modules (MW) IPP's (MW)

0
2012
Proprietary & Confidential

2013

2014
20

www.vikramsolar.com

Vikram Solar - Product Range

Proprietary & Confidential

www.vikramsolar.com

21

PV Modules
ELDORA 140
POLY-CRYSTALLINE SOLAR PV MODULE

ELDORA 210
POLY-CRYSTALLINE SOLAR PV MODULE

Features

High conversion efficiency based on leading innovative photovoltaic technologies High reliability with guaranteed 0~+4.99 Wp power output tolerance, ensuring ROI Withstands high wind-pressure and snow load (passed 5400Pa mechanical loading test), and extreme temperature variations Optimal output over decades, with very good low light response

Proprietary & Confidential

www.vikramsolar.com

22

PV Modules (Contd)
ELDORA 240
POLY-CRYSTALLINE SOLAR PV MODULE

ELDORA 280
POLY-CRYSTALLINE SOLAR PV MODULE

Features

High conversion efficiency based on leading innovative photovoltaic technologies High reliability with guaranteed 0~+4.99 Wp power output tolerance, ensuring ROI Withstands high wind-pressure and snow load (passed 5400Pa mechanical loading test), and extreme temperature variations Optimal output over decades, with very good low light response
www.vikramsolar.com 23

Proprietary & Confidential

The Latest offering ELDORA 350


POLY-CRYSTALLINE SOLAR PV MODULE

The BIG One

Features

High conversion efficiency based on leading innovative photovoltaic technologies High reliability with guaranteed 0~+4.99 Wp power output tolerance, ensuring ROI Withstands high wind-pressure and snow load (passed 5400Pa mechanical loading test), and extreme temperature variations Optimal output over decades, with very good low light response 88 Cell, cell efficiencies of 16.60% with ARC Glass & higher thickness Ribbons The dimensions of the Module 1800 MM X 1300 MM X 36 MM. 4 MM Glass & 4 Diode JB in 350 Wp glass

Quality and Safety


Electrical insulation values for this 350 wp panel (in Mega Ohm per panel) will be more than 50 Mega Ohms.
Per Pallet 350 wp panels - 28 modules Per 40 Container - 12 pallets/336 Modules
www.vikramsolar.com

25 year limited power output warranty Rigorous quality control meeting the highest International Standards ISO 14001 (Environment Health & Safety) Certified Factory ISO 9001:2008 (Quality Management System) Certified Factory TUV: IEC 61215, IEC 61730, IEC 61701, CE, UL 1703, MCS Strict adherence to Electroluminesence Testing ensuring micro-crack free Modules
24

Proprietary & Confidential

Vikram Solar - Commissioned Projects

Proprietary & Confidential

www.vikramsolar.com

25

Few Power Plant Installation at a Glance


Capacity 29 MWp 10 MWp 3 MWp 2.5 MWp 1 MWp 800 KWp 300 KWp 250 KWp 100 KWp 42 KWp 30 KWp 53 KWp 74 KWp 67 KWp Type Grid Tied Grid Tied Roof Top Grid Tied Grid Tied Grid Tied Telecom Application Grid Tied Grid Tied with Battery Back Up Telecom Application Grid Tied Rooftop Rooftop Rooftop Project Location France Spain Spain Germany Germany Italy India Italy India India India India Italy Spain Commissioned On Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned

Proprietary & Confidential

www.vikramsolar.com

26

Few Power Plant Installation at a Glance


Capacity 7 KWp 6 KWp 5 KWp 5 KWp 5 KWp 11 MWp 5.8MWp 5.8MWp 5 MWp 5 MWp 5 MWp Type Stand Alone Grid Tied with Battery Back Up Stand Alone Grid Tied with Battery Back Up Grid Tied with Battery Back Up Grid Tied Grid Tied Grid Tied Grid Tied Grid Tied Grid Tied Project Location India India India India India Spain Spain Spain Spain Spain Spain Commissioned On Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned

4.5 MWp
160 KWp 116 KWp

Grid Tied
Rooftop Rooftop

Spain
France Spain

Commissioned
Commissioned Commissioned

Proprietary & Confidential

www.vikramsolar.com

27

Few Power Plant Installation at a Glance


Capacity 4.4 MWp 4 MWp 3.8 MWp 2 MWp 1.9 MWp 1.8 MWp 1.5 MWp 1.5 MWp 1.2 MWp 1.1 MWp 1 MWp 0.9 MWp 0.8 MWp 167 KWp 130 KWp
Proprietary & Confidential

Type Grid Tied Grid Tied Grid Tied Grid Tied Grid Tied Grid Tied Grid Tied Grid Tied Grid Tied Grid Tied Grid Tied

Project Sponsor Spain Spain Spain Spain Spain Spain Spain Spain Spain Spain Solaria Spain Spain France Spain
www.vikramsolar.com

Commissioned On Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned
28

Grid Tied ( 0.4 MWp CSP & 0.5 MWp PV)


Grid Tied Rooftop Rooftop

Few Power Plant Installation at a Glance


Capacity 0.8 MWp 0.6 MWp 0.5 MWp 0.5 MWp 0.3 MWp 3.6 MWp 3 MWp 10 MWp 2 MWp 1.1 MWp 536 KWp Type Grid Tied Grid Tied Grid Tied Grid Tied Grid Tied Grid Tied Rooftop Rooftop Rooftop Rooftop Rooftop Project Sponsor Spain Spain Spain Spain Italy Italia Spain France Spain Spain Spain Project Status Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned Commissioned

232 KWp
250 KWp 500 KWp

Rooftop
Rooftop Rooftop

Spain
Spain Spain

Commissioned
Commissioned Commissioned

Proprietary & Confidential

www.vikramproener.com

29

Few Power Plant Installation at a Glance


Capacity 2MW 1 MW 5MW 2 MW 1 MW 2MW 5MW Type Grid Tied Grid Tied Grid Tied Grid Tied Grid Tied Grid Tied Grid Tied Project Sponsor India India India India India India India Place Commissioned Commissioned Commissioned Roorkee, Uttarakhand Rourkela, Orissa Lucknow, Uttar Pradesh Jodhpur, Rajasthan

Proprietary & Confidential

www.vikramsolar.com

30

Our Commissioned Projects


Argamasilla I (Ciudad Real)
Type Place Project Status Size Grid Tied Argamasilla I (Ciudad Real) Commissioned 29 MWp

Villanueva De La Serena
Type Place Project Status Size Grid Tied Villanueva De La Serena Commissioned 10 MWp

Proprietary & Confidential

www.vikramsolar.com

31

Our Commissioned Projects


MAGACELA (BADAJOZ)
Type Place Project Status Size Grid Tied MAGACELA (BADAJOZ) Commissioned 10 MWp

TRUJILLO 3 (CACERES)
Type Place Project Status Size Grid Tied TRUJILLO 3 (CACERES) Commissioned 10 MWp

Proprietary & Confidential

www.vikramsolar.com

32

Our Commissioned Projects


Spain
Type Place Project Status Size Roof top Spain Commissioned 3MWp

Karlstadt ,Germany
Type Place Project Status Size Grid Tied Karlstadt ,Germany Commissioned 2.5 MWp

Proprietary & Confidential

www.vikramsolar.com

33

Our Commissioned Projects


Kottenheim, Germany
Type Place Project Status Size Grid Tied Kottenheim, Germany Commissioned 1.05 MWp

Chhattisgarh, India
Type Place Year of Commissioning Size Grid Tied Chhattisgarh, India August 2011 2 MWp

Proprietary & Confidential

www.vikramsolar.com

34

Our Commissioned Projects


Gujarat, India
Type Place Project Status Size Grid Tied Gujarat, India Commissioned 5 MWp

Orissa, India
Type Place Project Status Size Grid Tied Orissa, India Commissioned 1 MWp

Proprietary & Confidential

www.vikramsolar.com

35

Our Commissioned Projects


Torano Nuovo - Italy
Type Place Project Status Grid Tied Torano Nuovo - Italy Commissioned

Size

800 KWp

Uttar Pradesh, India


Type Place Stand Alone Hybrid Uttar Pradesh, India

Project Status
Size

Commissioned
10 KWp x 30

Proprietary & Confidential

www.vikramsolar.com

36

Our Commissioned Projects


Parma, Italy
Type Place Project Status Size Stand Alone Hybrid Parma, Italy Commissioned 250 KWp

HIT, Kolkata, India


Type Place Project Status Size Grid Connected with Battery Backup HIT, Kolkata, India Commissioned 100KWp

Proprietary & Confidential

www.vikramsolar.com

37

Our Commissioned Projects


Uttar Pradesh & Haryana, India
Type Place Project Status Size Hybrid System for Telecom Towers Uttar Pradesh & Haryana, India Commissioned 4.2KWp x 10

Salt Lake, West Bengal, India


Type Place Project Status Size Grid Connected Salt Lake ,West Bengal India Commissioned 30KWp

Proprietary & Confidential

www.vikramsolar.com

38

Our Commissioned Projects


Uttarakhand, India
Type Place Project Status Project Sponsor Size Stand Alone ITI Building, Uttarkhand, India Commissioned UREDA 3.5KWp * 2 Nos

Uttarpradesh, India
Type Place Project Status Project Sponsor Size Grid connected with Battery back up Energy Park , U.P, India Commissioned NEDA, U.P 6KWp

Proprietary & Confidential

www.vikramsolar.com

39

Our Commissioned Projects


West Bengal, India
Type Place Project Status Project Sponsor Size Grid Connected with Battery back up Gurudas College, West Bengal, India Commissioned WBGEDCL 5KWp

Haryana, India
Type Grid Connected with Battery back up

Place
Project Status Project Sponsor Size
Proprietary & Confidential www.vikramsolar.com

Bahal, Haryana, India


Commissioned BRCM Public School 5KWp
40

4.5 MW Solar power plant in France


Awarded Mounting

one of the most difficult power plant installation system installed by hand over surface with average 25 %

steep

Proprietary & Confidential

www.vikramsolar.com

41

Photo Gallery

5MW for MONTEBALITO

5MW for MONTEBALITO

4.5MW for ALDESA


Proprietary & Confidential

5MW for GMF


www.vikramsolar.com 42

Certificate of Commissioning
Details of SPV Modules and Inverters:
Type of Solar photovoltaic modules Make of Solar Photovoltaic Modules Model of PV Modules Capacity of each PV Modules Total No. of PV Modules Type of Inverters Make of Inverters Poly Crystalline Eldora, Vikram Solar Pvt. Ltd. Eldora 200 200 W 6480 Central AEG Eldora 205 205 W 9076 Eldora 210 210 W 8976

Capacity of each Inverter


Total no. of Inverters Total Capacity of Solar Power Project

500 kW
10 5.0414

Details of Site Location:


Village
Shivlakha

Taluka
Bhaehau

District
Kutch

Revenue survey numbers


526/C, 526/P1, 527/B, 527/C, 528/B1, 531, 537/B1, 538/A

Proprietary & Confidential

www.vikramsolar.com

43

Project Pipeline in India


Sl. No. 1 2 Capacity 10 MW 10 MW Type Solar Power Plant under JNNSM Solar Power Plant under JNNSM Solar Power Plant for Telecom Application Stand Alone Solar Power Plant with Battery Back up Stand Alone Solar Power Plant with Battery Back up Grid Connected Solar Power Plant with Battery Back up Grid Connected Solar Power Plant with Battery Back up Stand Alone Solar Power Plant with Battery Back up Project Sponsor Lexicon Vanijya Pvt. Ltd. Symphony Vyapaar Pvt. Ltd.

3
4 5 6 7 8

30 X 10 KW
1 x 25 KW 1 x 25 KW 100 KW 30 KW 20 KW

Global Towers Ltd.


Zoram Energy Development Agency Zoram Energy Development Agency Ballaram Hanumandas Charitable Trust Tapti Valley Education Foundation , Gujarat Directorate of New and Renewable Energy, Nagaland, Kohima

Proprietary & Confidential

www.vikramsolar.com

44

Project Pipeline in India


Sl. No. 9 Capacity 50 KW Type Stand Alone Solar Power Plant with Battery Back up Stand Alone Solar Power Plant with Battery Back up Grid Connected Solar Power Plant with Battery Back up Grid Connected Solar Power Plant with Battery Back up Project Sponsor Directorate of New and Renewable Energy, Nagaland, Kohima Directorate of New and Renewable Energy, Nagaland, Kohima Vikram Green Tech Pune Signotron India Pvt. Ltd.

10
11 12

100 KW
30 KW 10 KW

Proprietary & Confidential

www.vikramsolar.com

45

Vikram Solar EPC Installation Film

Vikram Solar EPC Installation Film

Proprietary & Confidential

www.vikramsolar.com

46

Our Infrastructure
Highly automated, state-of-the-art facilities

Proprietary & Confidential

www.vikramsolar.com

47

Module Assembly Service

Proprietary & Confidential

www.vikramsolar.com

48

Module Assembly Service


The process includes the following steps:
Assembler Bussing Module Lay Up Laminator

Cleaning

Testing

JB Fixing

Framing

Packaging

Our multiple lines are from Spire USA , NPC Japan

Proprietary & Confidential

www.vikramsolar.com

49

Manufacturing Process

GLASS WASHING

STRINGING

BUSSING

SHEET CUTTING

FRAMING

TRIMING

LAMINATION

LAY UP

JB FIXING
Proprietary & Confidential

CLEANING
www.vikramsolar.com

PACKING
50

Testing Equipment

CELL TESTING

VISUAL INSPECTION

IV TEST

LAMINATED QC

FINAL Q.C.

FLASH TESTING

H.V. TESTING

Proprietary & Confidential

www.vikramsolar.com

51

Storage of Cells, Materials and Modules

Proprietary & Confidential

www.vikramsolar.com

52

Storage Capacity at Our Plant


Cells - 7 Mw EVA - 150000 sq metre Backsheet - 75000 sq metre Fibre Glass - 10000sq metre Glasses - 70000 Pieces (each of measurement 1.64m*.982m) AL Frames - 120 Tonne Flux - 500 Litres Ribbons - 6000 Kgs of Interconnect Ribbon and 2000 Kgs of Bussing Ribbon Sealant of 7000 Cartridges Module Storage Capacity of 3.5 Mw

Proprietary & Confidential

www.vikramsolar.com

53

Placing RFID on Modules (JNSM Requirement)

Proprietary & Confidential

www.vikramsolar.com

54

Placing RFID on Modules (JNSM)


Each PV module used in any solar power project must use a RF identification tag. The following information must be mentioned in the RFID used on each module (This can be inside or outside the laminate, but must be able to withstand harsh environmental conditions) Name of the manufacturer of PV Module Name of the Manufacturer of Solar cells Month and year of the manufacture (separately for solar cells and module) Country of origin (separately for solar cells and module) I-V curve for the module Wattage, Im, Vm and FF for the module Unique Serial No and Model No of the module Date and year of obtaining IEC PV module qualification certificate Name of the test lab issuing IEC certificate Other relevant information on traceability of solar cells and module as per ISO 9000
Proprietary & Confidential www.vikramsolar.com 55

Placing RFID on Modules (JNSM)

Proprietary & Confidential

www.vikramsolar.com

56

Report Generated after Tag Writing

Proprietary & Confidential

www.vikramsolar.com

57

Generated IV Curve after Tag Writing

Proprietary & Confidential

www.vikramsolar.com

58

Certifications

Proprietary & Confidential

www.vikramsolar.com

59

Certifications

Modules from Vikram Solar are certified with TUV IEC61215, IEC61730 , IEC 61701,CEC, MNRE, MCS, UL1703 During the OEM process - Modules require co-certification from TUV Rhineland and will take 3 months processing time For Domestic sales Modules require TUV IEC61215, MNRE Certificate ISO 9001:2008 and ISO14001 :2004 Certified

Proprietary & Confidential

www.vikramsolar.com

60

Certificates

Proprietary & Confidential

www.vikramsolar.com

61

Certification - ISO 140001:2004


Vikram Solar is committed to manufacture and sale of Solar Photovoltaic Modules and Systems that can produce clean & green energy leading to sustainable environmental development, continually improve environmental performance and develop systems by:

Managing environmental matters as legal parts of the business, which is also prime corporate responsibility

Complying with all applicable environmental Legislations & Regulations and commitment to environmental protection through prevention of pollution
Striving hard towards conservation of natural resources/Emerge by their responsible and efficient use Providing appropriate training to employees to enhance their awareness on environmental aspects and commitment to Environment Protection by adhering suitable methods and Operational control procedures Being committed to communicate the Environmental policy to all persons working for or on behalf of our organization Providing a framework for setting & reviewing Environmental Objectives & Targets, develop Environmental programs & Initiate Action towards Continual Improvement.

Proprietary & Confidential

www.vikramsolar.com

62

ICRA Credit Rating


Instrument
Term Loan Fund Based Limits

Amount Rated
Rs 23.39 crore (Reduced from Rs 27.00 crore) Rs. 58.61 crore (Enhanced from Rs 38.00 crore) Rs 41.00 crore (Enhanced from Rs. 21.00 crore)

Rating Action
ICRA]BB (Stable) revised upwards from [ICRA]BB- (Stable) [ICRA]BB (Stable) revised upwards from [ICRA]BB- (Stable) [ICRA]BB (Stable) revised upwards from [ICRA]BB- (Stable)/[ICRA]A4 reaffirmed

Non Fund Based Limits*

*The rated limits are interchangeable between short term and long term scale

Proprietary & Confidential

www.vikramsolar.com

63

EHS
What EHS is: (Environment, Health, Safety)
Environment
Conserving Air, Water, Soil, Plants, Animals, Wildlife, Our Community (causing no damage)

Health
Preserving Human Health both Chronic and Acute (preventing illness)

Safety
Preserving Human and Community Safety/ Well Being (preventing injury)
Proprietary & Confidential www.vikramsolar.com 64

EHS
Different

types of Fire extinguishers installed in different location in factory Safety during work used PPEs

ERT team

for emergency is defined.


the assembly area is defined.

For emergency case Smoke detector

, Beam Detectors and Response Indicators installed with a monitoring system . class room Training and Mock drill for all employees working. Saplings and Trees are planted for going green.

Timely

Several 4

First aid boxes are in place at different location.

3 emergency Exits for evacuation is


Regular monitoring

defined.

of the Environmental Aspects viz. Air, Water, Noise, etc.

Proprietary & Confidential

www.vikramsolar.com

65

The EHS Development Process


Sustainability: Involve Executives, Engineers, Administration and Employees in EHS-MS Systems Design to Ensure Client Satisfaction, Utility, Widespread Ownership

Organization Direction

Leadership and Oversight Committee on Environmental, Health, and Safety


Ad Hoc Subcommittee Overseeing the EHS Management System Development

Work Production Working Committee


EHS Management System Design and Implementation

Vice President-works HR & Administration Manager

Project Team

VP

Senior Administration

QC Mgr

Employees

Rep. Researchers, Administration

Project Manager

Projects

Proprietary & Confidential

www.vikramsolar.com

66

EMS Policy - Vikram Solar

Vikram Solar is committed to manufacture and sale of Solar Photovoltaic Modules and Systems that can produce clean & green energy leading to sustainable environmental development, continually improve environmental performance and develop systems by: Managing environmental matters as legal parts of the business, which is also prime corporate responsibility, Complying with all applicable environmental Legislations & Regulations and commitment to environmental protection through prevention of pollution,

Striving hard towards conservation of natural resources/Emerge by their responsible and efficient use,
Providing appropriate training to employees to enhance their awareness on environmental aspects and commitment to Environment Protection by adhering suitable methods and Operational control procedures Being committed to communicate the Environmental policy to all persons working for or on behalf of our organization, Providing a framework for setting & reviewing Environmental Objectives & Targets, develop Environmental programs & Initiate Action towards Continual Improvement.

Proprietary & Confidential

www.vikramsolar.com

67

Workers Training Program


Provide safety

orientation, and train workers on

the basics

When you hire new and young workers, its essential to include safety issues as part of their orientation to the worksite on the first day of work, before they start working. Using a checklist can make the orientation easier and more thorough, and you can keep the checklist on file as a record of employee training.
Everyone has the right to a safe work environment. Employers, supervisors, and workers all have responsibilities to make sure work is performed safely.

Rights and Responsibilities

Proprietary & Confidential

www.vikramsolar.com

68

Workers Training Program


Train

young and new workers for their specific

tasks

All workers - especially young workers - need supervised, hands-on training in the tasks they will perform. For example, if a worker is required to operate a tool or machine, that worker has to be properly trained in using the equipment safely. Workers must be properly trained before they start a job.

General

training procedure

Heres a general procedure you can follow when training new and young workers.
Provide an overview Demonstrate and describe Observe the new worker on the job and check progress

Proprietary & Confidential

www.vikramsolar.com

69

Workers Training Program


Safe

work procedures

Some tasks require workers to follow a specific safe work procedure to eliminate or minimize risks. For example, in your workplace you may have developed procedures for locking out machinery or picking up discarded needles. Workers must be trained to follow your step-by-step safe work procedures.

Provide supervision and ongoing training for

workers

The most important part of training is the follow-up supervision. Adequate supervision includes the following:
Ensure proper instruction and training of workers. Follow up training with regularly scheduled observation to ensure that workers continue to follow safe work procedures. Document this observation.

Proprietary & Confidential

www.vikramsolar.com

70

Workers Training Program


Training records

Maintain records of the education, training, and supervision for each worker, listing dates and topics covered. Review training records regularly to ensure that training is up-todate and that it meets health and safety requirements. Young and new workers are often in situations where they are supervising their co-workers, even though they may not have the title of supervisor or assistant manager. Before promoting workers to supervisory roles or asking them to take on supervisory tasks, ensure that they have been trained on their responsibilities for health and safety as a supervisor.

Supervisor training

Make information inspections on a daily basis to ensure that workers understand and are following safe work procedures, including proper lifting techniques and the use of protective equipment, devices, and clothing.

Proprietary & Confidential

www.vikramsolar.com

71

Proprietary & Confidential

www.vikramsolar.com

72

Vikram Solar Production Process Film

Vikram Solar Production Process Flow

Proprietary & Confidential

www.vikramsolar.com

73

Proprietary & Confidential

www.vikramsolar.com

74

Thank You
www.vikramsolar.c om

Potrebbero piacerti anche