4. Finite Scheduling
Planning business issues Oracle Advanced Supply Chain Planning Plan types Implementation progression Planning business flow Planning data flow
New challenges and focus areas: Globalization and global sourcing, leaner supply networks, increased demand variability and cost volatility Increased customer expectations, faster product life cycles with local market requirements Mergers and acquisitions, and continued consolidation of suppliers and customers Increasing compliance requirements such as SarbanesOxley
Shape Demand
Respond to Demand
SUPPLIERS
Tier 2 Tier 1
Fax
Paper
Distribution plans
Paper
Production plans Manufacturing plans
Marketing
?
Sales
Manufacturing
Demand Planning
Supply Planning
Tier 2
Tier 1
Portal
Internet
Manufacturing
Embedded Analytics
7
Operational Excellence
Multi-Enterprise Collaboration
Role-based Portals
Postponement Optimization
Products
SNO
IO
RT S&OP
DM
PTP
ASCP
PS
GOP
CP
Platform WFL
Embedded Analytics
Oracle Global Order Promising (GOP) Oracle Inventory Optimization (IO) Oracle Production Scheduling (PS) Oracle Strategic Network Optimization (SNO)
9
E-Business Suite
Items and categories Bills of material Routings Resources Production and inventory costs Organizations Customers Calendars and shifts Units of measure WIP discrete jobs OPM process batches OPM complex routings and recipes OSFM lot-based jobs
Advanced Planning
Advanced Supply Chain Planning
Demand forecast Constrained supply Order forecast Supply commit Safety stock Sourcing rules Planned orders Demand Management Real-Time Sales and Operations Planning
Inventory Optimization
Production Scheduling
Collaborative Planning
10
APS
Source
Order Management Sales demand Inventory WIP
11
Manufacturing Planning
Sequence dependent setups/changeovers Simultaneous resources Batch resources Alternate resources Minimum transfer quantities Complex, network routings By-products and co-products Line rates and takt times
Transportation Suppliers
Transportation
Manufacturing
12
Eliminate spreadsheets
Material and capacity planning Personalized exceptions and queries Tailor workbench for individual users
13
14
Respects constraints
15
Optimization:
iLOG solver and optimization technology automates decision making: Optimizes plans to strategic objectives Generates coordinated sourcing, production, and distribution plans for supply chain partners Recommends alternate suppliers, components, routings, and resources Incorporated with third-generation memory-based planning
16
Optimization objectives
Maximize inventory turnover ratio Maximize plan profit Maximize on-time delivery
0.23
0 1
17
Planner Workbench:
Decision-support tool Flexible, intuitive, and easy to use interface Navigation paths to related information Designed to streamline common activities of planners
18
Simulation:
Quickly simulate plans with modified parameters (item simulation sets, plan options) Use key performance indicators (KPIs) to evaluate alternate plans: Inventory turnover On-time delivery Plan profit Resource utilization Graphical KPI display
19
20
21
Optimized
22
Unconstrained
23
Constrained
Respects constraints
24
Optimized
Respects constraints
25
Production
Demand
Production
Demand
Production
4
Demand Production Demand Machine constraint Labor constraint Production Demand
5 1 2 3
26
Production
Demand
Production
Demand
Production
4
Demand Production Demand Machine constraint Labor constraint Production Demand
5 1 2 3
27
Machine constraint
Production
Production
Production
Production
Demand
Production
Demand
Demand
Demand
Demand
3
28
Machine constraint
Production
Production
Production
Demand
Production
Demand
Demand
Demand
Demand
Production
3
29
Day 1
25 75
Day 2
25 75
Day 3
Day 4
Supply constraint
Material capacity Resource capacity 50 60 50 60 50 60 50 60
30
Planning Period
Sales orders
Priority 1, $1.00 Priority 2, $2.00 Supply constraint Material capacity Resource capacity Planned supply P1 Order, $1.00 P2 Order, $2.00
Day 1 25 75
Day 2 25 75
Day 3
Day 4
50 60
50 60
50 60
50 60
25
75
31
25
75
Sales orders
Priority 1, $1.00 Priority 2, $2.00 Supply constraint Material capacity Resource capacity Planned supply P1 Order, $1.00 P2 Order, $2.00
Day 1 25 75
Day 2 25 75
Day 3
Day 4
50 60
50 60
50 60
50 60
25
25
32
25
25 50 50
Sales orders
Priority 1, $1.00 Priority 2, $2.00 Supply constraint Material capacity Resource capacity Planned supply P1 Order, $1.00 P2 Order, $2.00
Day 1 25 75
Day 2 25 75
Day 3
Day 4
50 60
50 60
50 60
50 60
25
35
33
25
35 60 20
Planning Period
Sales orders
Priority 1, $1.00 Priority 2, $2.00 Supply constraint Material capacity Resource capacity Planned supply P1 Order, $1.00 P2 Order, $2.00
Day 1 25 75
Day 2 25 75
Day 3
Day 4
50 60
50 60
50 60
50 60
50
50
34
50
50
35
Create database links to establish communication Set up collection programs Run collection programs to copy supply chain models to the APS instance Define supply chain plan names and plan options Launch named supply chain plan
36
Fast Forward implementations of supply chain planning and constraint-based planning quickly begin return on investment Analyze costs and benefits before committing to additional implementation phases Realized benefits pay for advanced implementation phases
37
ASCP business flow ASCP business flow: Prepare ASCP business flow: Execute ASCP business flow: Analyze ASCP business flow: Implement
38
Analyze plan Adjust plan Simulate with revised constraints Collaborate on revised constraints
4. Implement
39
40
41
3. Analyze
Analyze plan Adjust plan Simulate with revised constraints Collaborate on revised constraints
42
4. Implement
43
44
Transaction Data
Planning Data
45
Transaction Data
Planning Data
Source Instance/Server
Destination Instance/Server
46
Planning Data
47
Planning data
Collections Workbench
Planner Workbench
65410
49
Summary
50
ASCP Fundamentals
51
Objectives
52
Independent
Customer Order
Forecast
53
Dependent
Forecast
Independent Demand
Dependent Demand
54
Fabrication plant
Assembly plant
Distribution centers
Customers
55
56
Item attributes
57
External and internal Plan to request/schedule/promise dates Sales order entry process Processing cycle Demand priority
58
Customer
Distribution center
Internal
Distribution center
Feeder plant
60
61
Processing Cycle
Enter Schedule Book Oracle Order Management
62
Demand Priority
Priority 1
Priority 2
63
64
65
66
67
68
Original forecast
=
Current forecast
Customer orders
69
Consumption Days
70
Days
Backward consumption days = 5 from Day 8 (Days 5, 4, 3, 2, 1) Forward consumption days = 5 from Day 8 (Days 9, 10, 11, 12, 15) 3 Original 20 2 20 1 20 4 20
Current
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 July 5 Sales Order #143 A Jul 8 120 Overconsumption entry in forecast set on July 8 for quantity - 40
71
Demand Classes
DC = MO DC = MO DC = RT DC = RT DC = WS DC = WS
Retail forecast
Wholesale forecast
72
Demand Classes
73
On Hand
74
Scheduled Receipts
ITEM A
Gross Requirements
Scheduled Receipts
80
110
80
110
200
110
200
110
200
75
Purchase Requisitions
76
Purchase Orders
Buyer
Supplier
Receiving
77
Production Plan
Planner
Shop Floor
Inventory
78
Summary
79
80
Introduction Navigation window Planning analysis windows Owning organization Navigation tips Preferences and folders
81
Introduction
Planner Workbench uses Windows
82
83
Summary
84
ASCP Fundamentals
85
Objectives
86
Overview
Inventory
Organizations Items Item attributes Org. assignment
Cost
Item costs Resource rates Accounts
Order Mgt
Customers Price lists
Purchasing
Supplier list Supplier capacity Delivery calendar
Engineering
BOM Departments Resources Routings and standards
Supply Chain
Shipping networks Sourcing rules Bills of distribution Assignment sets
87
Instances Operating units Organizations Subinventories and locators Setting up organizations Organizations and subinventories
88
Instances
Single Instance R12
D1 Singapore
Planning D2 Miami
S1 Chicago
89
Instances
You can launch a supply chain plan to plan organizations regardless of the instances that they are in.
R12 APS Instance R11 Instance AAA AAA:D1 AAA:D2 D1 Singapore R11i Instance CCC Database links
D2 Miami
S1 Chicago
Database links
CCC:S1
90
Operating Units
You can launch a supply chain plan to plan organizations regardless of the operating units or sets of books that they are tied to.
Operating Unit
91
Organizations
Distribution center
Feeder plant
Distribution center
92
Organization Security
93
Subinventories Locators
94
Setting Up Organizations
95
96
Items Item attributes Organization item Order modifiers Item attribute mass maintenance
97
Items
Items
Distribution
Production
98
Item Attributes
99
Main Tab
Unit of Measure
Physical Attributes
Weights and measures
Inventory Tab
Inventory Item Stockable Transactable
Order Management
Customer Orders Enabled Internal Orders Enabled Check ATP
Purchasing Tab
Purchasable Use Approved Supplier
100
101
102
MPP
MPS
MRP
IP
MRP Planning
103
Critical Components
104
Organization Item
Operating Unit
105
Order Modifiers
Net requirement
Planned order
Item A = 72
Item A = 100
106
107
Plans
Advanced Planning
Note: The collected data itself does not change. Update the source data if a permanent change is required.
108
Use the Select all feature to select all displayed records for mass updates. Modify the values of attributes:
Directly set a new value. Increase and decrease original values. Restore original values.
109
Update planning specific attributes that are not available in ERP such as:
Minimum Remaining Shelf Life (Days)
110
Forecast Control Planning Time Fence Days Standard Cost Net Selling Price PIP Flag Selling Price Substitution Window Safety Stock Days Unit Weight Unit Volume Safety Stock Method Safety Stock Percent ABC Class Planning Method Minimum Remaining Shelf Life
112
113
Bills of Material
D
114
CM41303
SC94043 SC94043
MC41204
MC41205
SC94043
SB41202
115
D
116
Workday calendar, work patterns, and shifts Defining work hours for a work shift Departments and resources Routings Modeling resource constraints Non critical patch resources Sequential resources Overlapping resources Simultaneous resources
117
Alternate resources Scheduling time window width for alternate resource Resource selection dependency Multiple resource scheduling One resource to one unit at a time Batch resources Minimum transfer quantity Modeling production resource capacity Multiresource scheduling
118
119
Define work calendar Attach work calendar to organization Define shift name, attached to calendar Define workday pattern for the shift name Define work shift hours for the shift name
120
121
Routings
Bill Parent AS41001 Work order
SB41101
CM41102
Routing Operation 10 Dept: Assembly Resource: Assembly Labor Resource: Tool kit Material: Operation 20 Dept: Shipping Resource: Warehouse Labor Resource: Forklift Material:
CM41102 Stylus
CM86234 Packaging
122
123
Drill
124
Sequential Resources
Sander
Paint Sprayer
125
Overlapping Resources
30% Offset
Paint Sprayer
126
Simultaneous Resources
Resources are scheduled for the same time period Primary resource group:
Direct labor
Hammer
Chisel
127
Alternate Resources
Direct labor
Hammer
Rock
Chisel
128
Window
129
OR
Operation 10 Setup (Alternate Resource) Operation 10 Run (Alternate Resource)
130
131
132
Batch Resources
133
Batch Resources
Batching window Minimum and maximum batch capacity Batchable unit of measure
134
Operation 10
Operation 20
135
Define work time available Define production resources available Use efficiency and utilization factors to modify capacity
136
Multiresource Scheduling
Processing Resources
Operation Duration
137
Modeling the supply chain Virtual enterprise structure Supply chain structure Modeling shipments between organizations Modeling shipments between organizations and external sites Supply chain links Sourcing rules Allocating demand to suppliers Sourcing splits Allocation rules
138
139
Suppliers
Manufacturing
Distribution
Consumers
140
Suppliers Suppliers
Suppliers Operating Unit Customers
Consumers
141
Singapore, D1
Distribution Centers
Miami, D2
Seattle, M1
Manufacturing Plants
Boston, M2
Chicago, S1
Subassembly Plant
Allied
Suppliers
Advantage
142
143
144
145
Sourcing Rules
Simple from - to relationships
Make at Rank 1 100% Boston, M2
146
Supply
60%
40%
147
Sourcing Splits
Buy from
Transfer from
148
Allocation Rules
The total allocation percentage for all sources within a rank must be 100% The planning engine sources with the highest rank have the highest priority in allocation Optimization sources with the lowest penalty adjusted cost have the highest priority in allocation
149
Bills of Distribution
Model relationships that would otherwise require multiple sourcing rules to describe
SR3
SR1
SR4
SR3
SR2
150
Assignment Sets
ASCP Plan: XYZ Assignment Set: ASN-S1 Item: CM41401 Organization: S1 Sourcing Rule: SR-S1 Supplier: Acme
CM41401 Acme
Chicago, S1
151
Item - organization
Specific
152
Approved supplier list Approved supplier list functions Enhanced sourcing Supplier sourcing setup Supplier-item attributes Supplier capacity
153
Commodity
Items
Supplier Site
154
Item average processing lead time Planned order release Supply due date
155
Enhanced Sourcing
Based on capacity constraints Use flexible tolerance fences to model supplier capacity constraints that can change with advance notice
156
Enhanced Sourcing
157
Define sourcing rules and bills of distribution Specify the assignment set
158
Supplier-Item Attributes
Delivery calendar Processing lead time Order modifiers Supplier flexible capacity tolerance fences
159
Supplier Capacity
Required
Available Required
Available
Required Available
Balanced
Underloaded
Overloaded
160
Lead times Lead times in requirements explosion Cumulative lead time Time fences
161
Lead Times
Preprocessing Processing Post processing Fixed Variable In-transit Lead time lot size
162
Cumulative manufacturing lead time Cumulative total lead time User-defined lead time
163
Time Fences
Time fences should be set to the lowest values that are practical. Planning Demand Release
164
165
Shipping Methods
166
Shipping Network
Customers Singapore, D1 Miami, D2
Distribution Centers
Seattle, M1
Manufacturing Plants
Boston, M2
Chicago, S1
Subassembly Plants
Suppliers
167
Transit Times
168
169
Summary
In this module, you should have learned how to: View enterprise data View item data View material data View resource data View sourcing data View supplier data View calendar, lead time, and time fence data View transportation data
170