Sei sulla pagina 1di 38

DTAC 3G 2.

1GHz - Site Solution for South, North & North East

www.huawei.com

New 3G cabinet Bay-face

HUAWEI TECHNOLOGIES CO., LTD.

HUAWEI TECHNOLOGIES CO., LTD.

HUAWEI TECHNOLOGIES CO., LTD.

Circuit Breaker inside new 3G Enclosure

63A

1. BTECH will install this cabinet on site and also install PGND cable (Ground cable) THW 1*16 sq.mm. Green color in water proof flexible conduit from new cabinet to ground bar. 2. BBTECH will provide external alarm cable 4 core inside this cabinet 20m (For door alarm and FAN alarm). Huawei will install this cable with Huawei external alarm cable to DTAC MDF.

HUAWEI TECHNOLOGIES CO., LTD.

New cabinet Inlet Assignment

Optical patch cord to existing IPRAN

PGND cable 16mm^2 for cabinet

1 inch
Alarm cable 3pcs To Alarm box Spare

inch

inch
DC input cable 25mm^2 to CB 63A CPRI cable / OIL

MAIN 2

RRU power cable

HUAWEI TECHNOLOGIES CO., LTD.

Cable Inlet Assignment

Existing 3G cabinet (IPRAN inside cabinet)


Move Alarm cable 3pcs out and use this hole for patch cord from BBU 3G U2100

1 inch

inch

inch If existing IPRAN not in this cabinet, no need move alarm cable out.

HUAWEI TECHNOLOGIES CO., LTD.

Circuit Breaker Requirement and Connecting

Circuit breaker in existing power supply

For Transmission

For 2G BTS (125A)

HUAWEI TECHNOLOGIES CO., LTD.

Circuit Breaker Requirement and Connecting (Have space)

If has spare circuit breaker 125A


- use existing circuit breaker 125A connect DC cable 25 mm^2 to new 3G U2100 enclosure

HUAWEI TECHNOLOGIES CO., LTD.

DC cable connection to new cabinet (Has existing CB)


New 3G U2100 Enclosure

63A

25 mm^2 cable

HUAWEI TECHNOLOGIES CO., LTD.

10

Circuit Breaker Requirement and Connecting (No Space)

If no space - Please install new circuit breaker 63A temporary inside cabinet. - Connect DC cable 25mm^2 from DC bar to new circuit breaker 63A.

HUAWEI TECHNOLOGIES CO., LTD.

11

DC cable connection to new cabinet (no existing CB)


New 3G U2100 Enclosure

New CB 63A

63A

25 mm^2 cable

HUAWEI TECHNOLOGIES CO., LTD.

12

Cable color marking

CPRI/Jumper Line 1

CPRI/Jumper Line 2

HUAWEI TECHNOLOGIES CO., LTD.

13

PVC Tape 3M (From Local)

HUAWEI TECHNOLOGIES CO., LTD.

14

How to connect all ground cable?

HUAWEI TECHNOLOGIES CO., LTD.

15

How to connect all ground cable? Set the priority for grounding on the tower, as follows;
1) Connect to bus bar installed on tower by using 2 holes cable lug.

2) Connect to the main ground cable from tower to ground

HUAWEI TECHNOLOGIES CO., LTD.

16

How to connect all ground cable?


3) Connect to lightning protection ground cable

4) Connect between the tower segments connection. (If any additional ground cable, can be grounded to this cable by using Cclamps as shown below)

HUAWEI TECHNOLOGIES CO., LTD.

17

How to connect all ground cable?


5) Run a new main ground cable from equipment to ground level and Connect the equipment on the tower to the new main ground cable with C-clamps.

HUAWEI TECHNOLOGIES CO., LTD.

18

Solution Part 1
1) Tower Guyed mast Self Slope Square Self (L type)

HUAWEI TECHNOLOGIES CO., LTD.

19

Solution Normal Tower


Type S ID Criterias ( GM /L) Tower type Site Solution Description Antenna Level Mounting type Single arm mounting Single arm mounting Single arm mounting Single arm mounting Single arm mounting Single arm mounting Single arm mounting Single arm mounting Single arm mounting Single arm mounting Single arm mounting Special mounting Special mounting Special mounting Special mounting Special mounting Special mounting Special mounting Special mounting Antenna Problem

1.1a 2G Ant <= 3 1.1b 2G Only 1.2a 2G Ant > 3 1.2b

Guy

Install new 3G U2100 ant same level 2G.

same level 2G same level 2G

Sq. Self / Self slope Install new 3G U2100 ant same level 2G. Guy / Sq. Self Install new 3G U2100 ant below level 2G . Self slope

below level 2G

2.1a 2.1b

2G Ant <=3 , 3G (850) =3

Guy Install new 3G U2100 ant same level 2G. Sq. Self; Self slope same level 2G

2.2

2G Ant > 3 and <= 6, 3G (850) = 3

Guy /Sq. Self / Self install new 3G U2100 ant same level 3G. slope priority-1 : install new 3G U2100 ant same level 3G. (Check by level 2 engineer)

same level 3G(U850)

2G +3G (850)

same level 3G(U850)

2.3a 2G Ant > 6, 3G (850) = 3

Sq. Self /Self slope priority-2 : Re-enforce tower priority-1 : install new 3G U2100 ant same or lower than 3G 850. (Check by level 2 engineer) priority-2 : Re-enforce tower same level 3G(U850)

same level 3G(U850)

2.3b

Guy

same level 3G(U850)

HUAWEI TECHNOLOGIES CO., LTD.

20

Only 2G

HUAWEI TECHNOLOGIES CO., LTD.

21

Solution 1.1a (2G ant <=3)


Condition: 1.Only 2G 2.tower&Antenna Guyed mast

Solution: Single band ant ,Install new 3G U2100 ant same level 2G.

Antenna mounting type: Single arm mounting.

HUAWEI TECHNOLOGIES CO., LTD.

22

Solution 1.1b (2G ant <=3)


Condition: 1.Only 2G 2.tower&Antenna Square self (L type)/Self slope

Solution: Single band ant ,Install new 3G U2100 ant same level 2G.

Antenna mounting type: Single arm mounting (Special mounting)

HUAWEI TECHNOLOGIES CO., LTD.

23

Solution 1.2a (2G ant >3)


Condition: 1.Only 2G 2.tower&Antenna Guyed mast Square self (L type) Solution: Single band ant ,Install new 3G U2100 ant below level 2G.

Antenna mounting type: Single arm mounting.

HUAWEI TECHNOLOGIES CO., LTD.

24

Solution 1.2b (2G ant >3)


Condition: 1.Only 2G 2.tower&Antenna Self slope

Solution: Single band ant ,Install new 3G U2100 ant below level 2G.

Antenna mounting type: Single arm mounting (Special mounting)

HUAWEI TECHNOLOGIES CO., LTD.

25

2G + 3G (850)

HUAWEI TECHNOLOGIES CO., LTD.

26

Solution 2.1a {2G ant <=3, 3G (850)=3}


Condition: 1. 2G + 3G (850) 2.tower&Antenna Guyed mast Solution: Single band ant ,Install new 3G U2100 ant same level 2G.

Antenna mounting type: Single arm mounting.

HUAWEI TECHNOLOGIES CO., LTD.

27

Solution 2.1b {2G ant <=3, 3G (850)=3}


Condition: 1. 2G + 3G (850) 2.tower&Antenna Square self (L type)/Self slope Solution: Single band ant ,Install new 3G U2100 ant same level 2G.

Antenna mounting type: Single arm mounting (Special mounting)

HUAWEI TECHNOLOGIES CO., LTD.

28

Solution 2.2 {2G ant >3 and <=6, 3G (850)=3}


Condition: 1. 2G + 3G (850) 2.tower&Antenna Guyed mast / Square self (L type) / Self slope Solution: Single band ant ,Install new 3G U2100 ant same level 3G(U850).

Antenna mounting type: Single arm mounting (Special mounting)

HUAWEI TECHNOLOGIES CO., LTD.

29

Solution 2.3a {2G ant >6, 3G (850)=3}


Condition: 1. 2G + 3G (850) 2.tower&Antenna Square self (L type) / Self slope

Solution: priority 1 install new 3G U2100 ant same level 3G 850. (Check by level 2 engineer). Antenna mounting type: Single arm mounting (Special mounting)
Solution: Priority 2 Re-enforce tower (Install same level 3G)

HUAWEI TECHNOLOGIES CO., LTD.

30

Solution 2.3b {2G ant >6, 3G (850)=3}


Condition: 1. 2G + 3G (850) 2.tower&Antenna Guy mast

Solution: priority 1 install new 3G U2100 ant same level 3G 850. (Check by level 2 engineer).

Antenna mounting type: Single arm mounting (Special mounting) Solution: Priority 2 Re-enforce tower (install same level 3G)
HUAWEI TECHNOLOGIES CO., LTD. 31

Solution Part 2
2Special tower Pole(3M) Pole(6M/9M) Wall-mount Pole Electrical Pol

HUAWEI TECHNOLOGIES CO., LTD.

32

Solution Special Tower


Type S ID Criterias ( GM /L) Tower type Site Solution Description Antenna Level Mounting type Single mounting T mounting Priority-2 : Dual band antenna 2G Only Priority-1: Check by level 2 engineer ; (Change to dual band 1800+2100 antenna) 3.1b 2G Ant > 3 Pole / Electrical priority-2 : Re-enforce tower (Change to dual band Pole 1800+2100 antenna) priority-3 : New Pole priority-4 : Combiner Solution same level 2G Existing Down time 3 Hours Down time 3 Hours Down time 3 Hours Down time 3 Hours Antenna Problem

Priority-1 : install new 3G U2100 ant same level 2G 3.1a 2G Ant <= 3 Pole 3 ,6 , 9

same level 2G

same level 2G

Existing

same level 2G

Existing

Priority-1: Check by level 2 engineer ; (Change to dual band 850+2100 antenna) 2G +3G (850) 3.2 2G Ant >=3 , 3G (850) =3

same level 3G

Existing

Down time 3 Hours Down time 3 Hours

Pole / Electrical priority-2 : Re-enforce tower (Change to dual band 850+2100 same level 3G Pole antenna) priority-3 : New Pole priority-4 : Combiner Solution

Existing

HUAWEI TECHNOLOGIES CO., LTD.

33

Power supply Solution


Solution #1 : Add new rectifier module+ new battery Solution #2 : Install new rectifier cabinet +battery system Solution # 3 : Replace existing rectifier Note: only confirm solution, for other work will be done by DTAC.

HUAWEI TECHNOLOGIES CO., LTD.

34

Solution #1 : Add new rectifier module+ new battery


Add new rectifier module 1 unit + Add Battery 1 String

AC cable
AIR

Rectifier & Battery


Transmission

Combiner RRU 2.1Ghz

Add new module


Add new Battery

RRU 850

Module

BTS Battery
2.1Ghz Cabinet

HUAWEI TECHNOLOGIES CO., LTD.

35

Solution #2 : Install new rectifier cabinet +battery system


Add new rectifier and battery 1 set ( 3 modules and 1 battery set )

AC cable
AIR

Existing Rectifier & Battery

Combiner

RRU 2.1Ghz

New Rectifier & Battery for DTN

Transmission

RRU 850

Module

BTS Battery

Battery

2.1Ghz Cabinet

HUAWEI TECHNOLOGIES CO., LTD.

36

Solution # 3 : Replace existing rectifier

Replace to new rectifier cabinet

AC cable
AIR

Rectifier & Battery


Transmission
RRU 850

Combiner

Module

BTS Battery

HUAWEI TECHNOLOGIES CO., LTD.