Process Description

Process Modeling by using Aspen HYSYS Engr. S. Zaheer Abbas

Learning Objectives
After you have completed this section you will be able to: Use Compressors in Aspen HYSYS Use Recycle Operation in Aspen HYSYS

Process Modeling by using Aspen HYSYS Engr. S. Zaheer Abbas

Building the Simulation


Basis environment enables you to specify the basic information like components, property package, reactions and so forth associated to the simulation. Case environment enables you to specify the streams and operation equipment associated to the simulation, and view the calculated results from the simulation.

Process Modeling by using Aspen HYSYS Engr. S. Zaheer Abbas

1) Component List
Nitrogen CO2 Methane Ethane Propane i-Butane n-Butane i-Pentane n-Pentane n-Hexane

Process Modeling by using Aspen HYSYS Engr. S. Zaheer Abbas

2) Defining a Fluid Package

Process Modeling by using Aspen HYSYS Engr. S. Zaheer Abbas

Entering the Simulation Environment

Process Modeling by using Aspen HYSYS Engr. S. Zaheer Abbas

Installing Feed Streams


Add a Material Stream
Name Temperature (C) Pressure (kPa) Molar Flow (kgmole/h) Component Nitrogen CO2 Methane Ethane Mole Fraction 0.0075 0.0147 0.5069 0.1451 Component i-Butane n-Butane i-Pentane n-Pentane To Compression 35 1725 5000 Mole Fraction 0.0652 0.0578 0.0515 0.0431

Propane

0.0725

n-Hexane

0.0357
8

Process Modeling by using Aspen HYSYS Engr. S. Zaheer Abbas

Building the Simulation without the Recycle Operation

Process Modeling by using Aspen HYSYS Engr. S. Zaheer Abbas

1. Installing a Mixer
Connections Name Inlet Outlet Parameters Pressure Assignment Equalize all Mixer 1 To Compression To LP Sep

Process Modeling by using Aspen HYSYS Engr. S. Zaheer Abbas

10

2. Installing a Separator
Connections Name LP Sep

Inlet
Vapor Outlet Liquid Outlet

To LP Sep
LP Sep Vap LP Sep Liq

Process Modeling by using Aspen HYSYS Engr. S. Zaheer Abbas

11

3. Installing a Compressor
Connections
Name Stage 1

Inlet
Outlet

LP Sep Vap
Stage 1 Out

Energy
Parameters

Stage 1 HP

Adiabatic Efficiency
Worksheet

75% (Default)

Stage 1 Out, Pressure


Process Modeling by Engr. S. Zaheer Abbas

3450 kPa
12

4. Installing a Cooler
Connections
Name Stage 1 Cooler

Inlet
Outlet

Stage 1 Out
Cooler 1 Out

Energy
Parameters

Stage 1 Q

Pressure Drop
Worksheet

0 kPa

Cooler 1 Out, Temperature

50C
13

Process Modeling by using Aspen HYSYS Engr. S. Zaheer Abbas

5. Installing 2nd Mixer


Connections Name Inlet Outlet Parameters Pressure Assignment Equalize all Mixer 2 Cooler 1 Out To IS Sep

Process Modeling by using Aspen HYSYS Engr. S. Zaheer Abbas

14

6. Installing Separator
Connections Name IS Sep

Inlet
Vapor Outlet Liquid Outlet

To IS Sep
IS Sep Vap IS Sep Liq

Process Modeling by using Aspen HYSYS Engr. S. Zaheer Abbas

15

7. Installing a Valve
Connections Name Inlet Outlet Worksheet LD1 Out, Pressure 1725 kPa Let Down 1 IS Sep Liq LD1 Out

Process Modeling by using Aspen HYSYS Engr. S. Zaheer Abbas

16

8. Installing 2nd Compressor


Connections
Name Stage 2

Inlet
Outlet

IS Sep Vap
Stage 2 Out

Energy
Parameters

Stage 2 HP

Adiabatic Efficiency
Worksheet

75% (Default)

Stage 2 Out, Pressure

6900 kPa
17

Process Modeling by using Aspen HYSYS Engr. S. Zaheer Abbas

9. Installing 2nd Cooler


Connections
Name Stage 2 Cooler

Inlet
Outlet

Stage 2 Out
Cooler 2 Out

Energy
Parameters

Stage 2 Q

Pressure Drop
Worksheet

0 kPa

Cooler 2 Out, Temperature

50C
18

Process Modeling by using Aspen HYSYS Engr. S. Zaheer Abbas

10. Installing HP Separator


Connections Name HP Sep

Inlet
Vapor Outlet Liquid Outlet

Cooler 2 Out
HP Sep Vap HP Sep Liq

Process Modeling by using Aspen HYSYS Engr. S. Zaheer Abbas

19

11. Installing 2nd Valve


Connections Name Inlet Outlet Worksheet LD2 Out, Pressure 3450 kPa Let Down 2 HP Sep Liq LD2 Out

Process Modeling by using Aspen HYSYS Engr. S. Zaheer Abbas

20

12. Installing the Recycles


RCY-1: Inlet: LD1 Out Outlet: RCY 1 Out RCY-2: Inlet: LD2 Out Outlet: RCY 2 Out