Located in the East Boston neighbourhood of Boston,
Massachusetts, US Ranked as fifth most significantly delayed airport in 2001 Average of 47.5 delays per 1,000 flights Usage in 2001 479,000 annual operations Demand projected in 2015 510,000 to 656,000 annual operations
Causes of delay
Delay due to weather condition 70-75% delay nationwide
Normal condition Adverse weather
Delays
Operation per hr 118-126
70-75% + 5 12%
78-88
Strong northeast winds Only two or one runway can be used Capacity dropped to 40-60 operations per hour Use of less than 3 runway due to adverse condition
Mix of Airplanes 40% of runway used by small, non-jet airplane, carrying between 9 -34 passengers 16 19 % runways used by regional jets carrying 35-70 passengers Over scheduling when they schedule more flights than the airport can possibly handle Increase in number annual passengers to 37.5 million projected in 2015 Location 90% of flights starts and ends there Arrival in uniform manner Very little slack in system to recover from delays
Normal good weather capacity Number of server 2 Passenger load factor 70% Arrival rate 50 planes/hr
19 seat turbo
150 seat Regional jets Passengers time
348
1,585 640 25.7
Total cost
Cost (average per plane per hr) 19 seat turbo 150 seat Regional jets For arrival rate - 50 For arrival rate - 55 For arrival rate - 59
348
1,585
75.25
467.29
143.96
893.95
695.60
4,319.48
640
167.95
321.29
1,552.43
There are only delay costs associated with an arrival rate of 59, delay time: 60.5-15= 45.5
Service Rate 30 30 30
The average delay time seems to be reasonable as the difference between average delay time for arrival rate of 55 and arrival rate of 59 is very high
Turboprop Turboprop Turboprop Regional Jet Regional Jet Regional Jet Conventional Jet Conventional Jet Conventional Jet
60
100 Turbopro Regional Jet Conventional Total p Jet 40% 18% 42% 24 19 230 11 50 154 58212 1080 1.855% 25 150 402 1063692 2520 0.237% 1195320 6000 0.502%
Airplane Mix
Airplane
Total
Total
60
100 Regional Jet Conventional Jet Total 30 150 402 1266300 3000 1400028 6000
Airplane Mix
Airplane
20%
12 19 230
30%
18 50 154 97020 1800
50%
36708 1200
3.269%
1.855%
0.237%
0.429%
60 150 Turboprop 20% 12 19 230 36708 1800 Regional Jet 30% 18 50 154 97020 2700 Conventional Jet 50% 30 150 402 1266300 4500 Total
Total Revenue Total landing Fees Landing Fees/Total Revenue Peak Period Demand Landing Fees
1400028 9000
4.904%
2.783%
0.355%
0.643%
60 200 Turboprop 20% 12 19 230 36708 2400 Regional Jet 30% 18 50 154 97020 3600 Conventional Jet 50% 30 150 402 1266300 6000 Total
1400028 12000
6.538%
3.711%
0.474%
0.857%
42) during peak period as landing fee would have higher cost effect for turboprop as the proportion of landing fee with total revenue is higher. Hence, there would be a decrease in the arrival rate of turboprops during the peak period. The similar impact would be less for the airplane mix of 20-30-50.
Extent to which savings in delay cost that result from demand mgmt. Offset period fees
Total Cost For Arrival Rate Saving (arrival rate from = 50 55 to 50) 19 seater turbo plane 75.3 68.7
467.3
167.9
426.7
153.3
100.0
100.0
59.4
85.4
144.0
893.9 321.3 For Arrival Rate = 59
551.6
3425.5 1231.1
150.0
150.0 150.0
557.7
2681.6 1059.9
If the arrival rate is more than service rate then there would be huge waiting line of planes. Airplanes would have to be diverted to other airports or have to wait in air. This would also result in cancellation of flights. In any case, Cost involved would be tremendous.
19 seater turbo plane 150 seat plane regional jets Passenger's time
Cost (avg per plane per hr) 348 1,585 640 25.7
Service Rate 60
Cost (avg per plane per hr) 19 seater turbo plane 150 seat plane 348 1,585
regional jets
640
168.83
If Logan drops to two total runways in operation, with a capacity of 22.5 arrivals per hour each, or to one runway with an average of capacity of 30 arrivals per hour then the delay costs and delay times will be astronomical and they will have to divert planes to other airports.