SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
SUNRISE SYSTEMS, UK
PIPENET VISION
DETAILED DEMONSTRATION AND DISCUSSION OF APPLICATIONS
PRESENTATION OUTLINE
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
Introduction
Transient Module Detailed Demonstration and Discussion of Applications Spray/Sprinkler Module Detailed Demonstration and Discussion of Applications Standard Module Detailed Demonstration and Discussion of Applications
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
PIPENET VISION
INTRODUCTION
WHAT IS PIPENET
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
PIPENET is a powerful software tool for rapid flow analysis of pipe and duct networks.
Standard Module
Spray/Sprinkler Module
Transient Module
Three modules ensure that, no matter how extensive or complex your network,
Standard Module General purpose flow analysis applications. systems and HVAC systems
Utility
Spray/Sprinkler Module Design of fire protection systems in compliance with NFPA rules Transient Module Dynamic analysis of pipe networks, along with the calculation of hydraulic transient forces.
HISTORY
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
PIPENET has a key role in improving design optimisation and safety standards in the oil&gas industry
Over 2000 users world-wide. PIPENET has been in industrial use for over 26 years User Friendliness is high priority PIPENET is constantly being updated and enhanced, putting us at the forefront of pipework and pipeline design technology. Technical support is a key aspect of company culture SUNRISE SYSTEMS is accredited with ISO 9001.
Training Demos
PIPENET News
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
This section is aimed at raising the profile of using PIPENET TRANSIENT in the minds of
Managers
Operators
Plant owners Designers Installers
Many National Codes and Standards have requirements to design piping systems to take into account the effects of occasional loads such as pressure transients in systems. This is not only concerns positive pressures but also negative pressures. Full vacuum can occur when there is column separation in a pipeline. This commonly occurs when there is a loss of power or rapid closure of an upstream valve. Thin wall ferrous and low stiffness thermoplastic pipe may be subjected to the occurrence of buckling due to vacuum.
There are two categories of damage that arise from surge events
Catastrophic failure of the pipeline or equipment Fatigue damage to pipelines, equipments and supports
Pipelines have been known to fail catastrophically as a result of surge events. The failure may take the form of a pipe burst or a pipeline collapse from buckling. The consequences could be
1. Delay to completion of the project 2. Plant and equipment non availability to the process and thus loss of earnings 3. Environmental damage 4. Personal injury 5. Loss of reputation and branding 6. Loss of future work from the client 7. Damage to other properties, injuries to the public 8. Increased insurance premiums
Pipeline
1. The derating of pipeline materials occurs because of the fatigue that occurs. To overcome the potential of fatigue failure increased pipe wall thickness is required to reduce the stress level in the pipe wall. 2. Pipeline accessories may fail to fatigue damage. These include leaking gaskets, valve body, seal or gasket failure, instrument failure or pipe support failure.
Equipments
Damage to equipment may mean that a process is offline whilst replacement equipment is installed. The on-costs can be many times the primary price of the equipment alone.
Equipments (cont.)
Pumps
1. Pumps can suffer damage to the seals, bearings, impeller, shaft and casing from surge events. 2. In todays world of high speed small frame pumps the relatively small nozzles are particularly vulnerable if the piping is not correctly supported or isolated. 3. Seals are damaged as a negative pressure may lift the seal face and allow solids to enter. This will lead to wear and consequential leaks. 4. Cast iron bodied pumps can fail because of the stress reversals in a fatigue situation. Cast iron is particularly weak in tension. 5. A surge event may create vortexing that results in loss of prime to a pump system.
Equipments (cont.)
Valves
1. Valves can be damaged by fatigue such their seats will allow fluid to pass and thus not isolate as designed. Gland seals are likely to leak requiring the retightening of the gland or complete re packing. 2. Control valves may be susceptible to loss of control during a surge event. 3. Control valves have parts that are more likely to be damaged. Such items as positioners or other electronic components are vulnerable. 4. Check valve seats may be damaged and thus leak. This results in a waste of energy in duty/standby pump arrangements as fluid is recirculated. Shafts and pins have been known to fail due to fatigue. 5. There have also been incidents of the flaps in a dual flap check valve failing completely and lodging is some other process equipment causing blockages. 6. Air release/ vacuum valves usually have small components or floats that can be damaged by pressures in excess of design or severe vibration resulting from surges.
Equipments (cont.)
Valves
7. Relief valves may discharge as a result of a surge event. If this occurs frequently the seat may fail from fatigue. 8. If the valve is buried it becomes a major exercise to replace.
Pipe Supports
1. The vibration resulting from a series of surge events can cause the pipe support to damage the external surface of the pipe material and result in a leak. 2. Pipe supports secured to concrete or steel structures can fail at the fasteners as a result of fatigue. 3. Concentrated masses such as valves may be excited by surge events and cause damage to the piping material.
Emergency call out resources Alternate supply lines Increased maintenance costs Increased investment in maintenance resources Complaints procedures Standby equipment Increased level of spares holding Possible special freight arrangements for remote sites Increased insurance premiums OH&S and industrial relations problems (Occupational Safety and Health)
Pumps
A parameter used in the surge analysis of a pump system is the moment of inertia (MOI) of the pump, fluid and motor rotating elements.
Check Valves
The type of check valve used has a great bearing on the pressure transients that can occur in a system.
Air/Vacuum Release Valves The air/vacuum release valves used on pipelines come in many forms of complexity.
You may well ask why engineers dont carry out a water hammer analysis. Could it be that:
There is difficulty in undertaking the calculations using the graphical techniques of yesteryear or modern software of today? You dont have the software and these specialist tools are not easy to obtain funding approval for in a large company? Employ a specialist who does! It is not understood whether it is an art or a science? Need to increase your knowledge? Fear of the unknown and you were not taught the subject at university? Failures dont appear to be frequent, but consider that most events are buried in confidentiality agreements following litigation.
KEY POINTS
One of the Biggest Petrochemical Plants Main Header Is 2.0 M Diameter Plant Has 4 Systems in Parallel Cooling Water System Uses GRP Open System With Cooling Tower Slow Valve Closure Necessary 240 Sec Severe Oscillations After Valve
OBJECTIVES
CONCLUSIONS
Pressure Range Is Below 1 Bar Maximum Pressure Is Below 8 Barg 240 Sec Valve Closure Time Is Necessary
KEY POINTS
Operator Is Shell, In Offshore Iran Two Sister Platform Complexes Soroosh (3 Platforms) And Nowrooz (2 Platforms) The Firewater Ringmain Is Made Of GRP Pipes
OBJECTIVES
To calculate the maximum pressure surges and check if they are within the limit deluge valve closure, deluge valve opening and pump trip Check the need for vacuum breakers, their position and sizes Check stability of the control valve Calculate hydraulic transient forces for pipe stress analysis, and positioning pipe supports.
PIPENETTM - Leading the Way in Fluid Flow Analysis TRANSIENT MODULE APPLICATION SUBSEA PIPELINE SYSTEM ARABIAN GULF ZADCO, ABU DHABI
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
PIPENETTM - Leading the Way in Fluid Flow Analysis TRANSIENT MODULE APPLICATION SUBSEA PIPELINE SYSTEM ARABIAN GULF ZADCO, ABU DHABI
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
KEY POINTS
35 Km Pipeline Transporting Oil From Platform To Tank Farm Two Specific Problems
Pipeline Is 25 Years Old And Is Corroded Water Cut In Oil Is High Less Compressible High Pressure Surge
PIPENETTM - Leading the Way in Fluid Flow Analysis TRANSIENT MODULE APPLICATION SUBSEA PIPELINE SYSTEM ARABIAN GULF ZADCO, ABU DHABI
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
OBJECTIVES
Determine The Valve Closure Time For Maximum Pressure Of Closed Head Pressure Of Pump Plus 5 Barg Determine The Volume Of Oil Leakage With And Without Leak Detection System
PIPENETTM - Leading the Way in Fluid Flow Analysis TRANSIENT MODULE APPLICATION SUBSEA PIPELINE SYSTEM ARABIAN GULF ZADCO, ABU DHABI
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
PIPENETTM - Leading the Way in Fluid Flow Analysis TRANSIENT MODULE APPLICATION SUBSEA PIPELINE SYSTEM ARABIAN GULF ZADCO, ABU DHABI
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
PIPENETTM - Leading the Way in Fluid Flow Analysis TRANSIENT MODULE APPLICATION SUBSEA PIPELINE SYSTEM ARABIAN GULF ZADCO, ABU DHABI
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
PIPENETTM - Leading the Way in Fluid Flow Analysis TRANSIENT MODULE APPLICATION SUBSEA PIPELINE SYSTEM ARABIAN GULF ZADCO, ABU DHABI
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
PIPENETTM - Leading the Way in Fluid Flow Analysis TRANSIENT MODULE APPLICATION SUBSEA PIPELINE SYSTEM ARABIAN GULF ZADCO, ABU DHABI
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
CONCLUSION
The shut off valve must be closed no faster than 600 sec in quadratic mode
KEY POINTS
5700 M Pipeline From Refinery to Ship
OBJECTIVES
To reduce the maximum pressure to 15 barg. Consider alternative strategies for reducing the pressure surge. Determine the best position for the surge relief device Calculate the forces on the expansion loop Optimise the size of surge relief valve
ALTERNATIVE STRATEGIES
Two Stage Valve Closure
EXPANSION LOOP
Petrochemical plant
2000M
KEY POINTS 1 Most complex cooling water system ever designed Made of GRP material Main header size in Phase 1 of the project was 3.5 m diameter Main header size in Phase 2 of the project was 4.5 m diameter The system has 9 variable speed pumps with pressure control (7 lead, 2 stand by) The system (Phase 1) has 190 vacuum breakers
KEY POINTS 2 Each pump had a capacity of some 48,000 m3/hr, making a total of 336,000 m3/hr There were flow control valves in the system The allowable working pressure had a very narrow range.
Minimum pressure = -0.3 barg Maximum pressure = 6.0 barg
The system has two receiving basins to stop air flowing back into the system if the pumps tripped PIPENET was specified for the project by Qatar Petroleum.
OBJECTIVES
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
To size the receiving basins To select the vacuum breakers and ensure their adequacy To check the stability of the control systems The users were plants operated by other companies. It was necessary to guarantee availability of water. Optimise the control systems in order to minimise power consumption Safe operation under pump trip and valve closure events.
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
KEY POINTS Liquefied Natural Gas Plant (LNG) GASCO, Abu Dhabi Mixture of Carbon steel, Lined/Unlined and GRP Complicated bypass valve arrangement Pump Startup with no system running Pump startup with the largest system running Pump trip
Turbine Trip/Main Steam System & Re-heat Systems (Hot & Cold)
Pipe Rupture
PIPENETTM - Leading the Way in Fluid Flow Analysis TRANSIENT MODULE APPLICATION 600 MW SUPERCRITICAL UNIT MAIN STEAM SYSTEM, CHINA
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297
HP Bypass
Boiler
HP Turbine
PIPENETTM - Leading the Way in Fluid Flow Analysis TRANSIENT MODULE APPLICATION 600 MW SUPERCRITICAL UNIT HOT REHEATING SYSTEM, CHINA
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297
Condenser Boiler
MP Turbine
PIPENETTM - Leading the Way in Fluid Flow Analysis TRANSIENT MODULE APPLICATION 900 MW SUPERCRITICAL UNIT HOT REHEATING SYSTEM, CHINA
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
Boiler
HP Turbine
PIPENETTM - Leading the Way in Fluid Flow Analysis TRANSIENT MODULE APPLICATION TURBINE TRIP
KEY POINTS
600~900 MW Supercritical Unit P91 Dn300/420 Main Steam Pipes in 600 MW Unit P91 Dn800 Hot Reheat Pipes in 900 MW Unit Quick Valve Closure Necessary 0.15~0.20 Sec Severe Dynamic Forces Are Produced After Valves Close Dampers Are Used to Stand Hydraulic Transient Forces
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
PIPENETTM - Leading the Way in Fluid Flow Analysis TRANSIENT MODULE APPLICATION TURBINE TRIP
OBJECTIVES
Estimate Dynamic Forces Caused by Valve Quick Closure. Calculation Results Can Be Used by Stress Analysis Software, such as Caesar II, to Evaluate Safety of System. Protect Turbine, Boiler, HP/LP Bypass Valves, Pipes, etc.
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
PIPENETTM - Leading the Way in Fluid Flow Analysis TRANSIENT MODULE APPLICATION TURBINE TRIP
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
PIPENETTM - Leading the Way in Fluid Flow Analysis TRANSIENT MODULE APPLICATION TURBINE TRIP
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
PIPENETTM - Leading the Way in Fluid Flow Analysis TRANSIENT MODULE APPLICATION TURBINE TRIP
CONCLUSIONS
Maximum Dynamic Force in A 40 m Dn400 Straight Pipe Can Reach Up to 290 KN in 600MW Supercritical Main Stream System. Maximum Dynamic Force in A 30 m Dn800 Straight Pipe Can Reach Up to 90 KN in 900MW Supercritical Hot Reheat System.
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
PIPENETTM - Leading the Way in Fluid Flow Analysis TRANSIENT MODULE APPLICATION 300 MW SUBCRITICAL UNIT FUEL OIL SYSTEM, CHINA
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
PIPENETTM - Leading the Way in Fluid Flow Analysis TRANSIENT MODULE APPLICATION FUEL OIL SYSTEM
KEY POINTS
300 MW Subcritical Boiler with 3X4 Oil Guns. Oil Guns Are Operated Group by Group without Regulation. Oil Guns Will Lose Pressure and Fuel During Pump Switch or New Oil Guns Are Put into Use.
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
Oil Guns May Extinguish If Oil Pressure Drop Below The Allowed Minimum Level.
Minimum Allowed Pressure Before Oil Guns Is 10 Barg .
PIPENETTM - Leading the Way in Fluid Flow Analysis TRANSIENT MODULE APPLICATION FUEL OIL SYSTEM
OBJECTIVES
Valid the Start-up Procedure of Oil Guns. Avoid Oil Guns Extinguishing and Protect Boiler. Optimize Accumulators to Stabilize Oil Pressure. Optimize Control System.
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
PIPENETTM - Leading the Way in Fluid Flow Analysis TRANSIENT MODULE APPLICATION FUEL OIL SYSTEM Scenario 1: Open Four Oil Guns Simultaneously
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
PIPENETTM - Leading the Way in Fluid Flow Analysis TRANSIENT MODULE APPLICATION FUEL OIL SYSTEM Scenario 1: Open Oil Guns
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
CONDITIONS Bottom (A Level) Oil Guns Are Opened. Top (C Level) Oil Guns Are Closed. Middle (B Level) Oil Guns Are Opened Simultaneously in 3 Seconds. Return Oil Is Controlled at 25 Bar Using A PID Controller.
PIPENETTM - Leading the Way in Fluid Flow Analysis TRANSIENT MODULE APPLICATION FUEL OIL SYSTEM Scenario 1: Open Oil Guns (1B - 4B) in 0.3s
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
Oil pressure recovery time is about 20 seconds Oil return control valve changes position from 61.5% to 39.5%.
PIPENETTM - Leading the Way in Fluid Flow Analysis TRANSIENT MODULE APPLICATION FUEL OIL SYSTEM Scenario 1: Open Oil Guns (1B - 4B) in 0.3s
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
Flowrate at bottom oil guns decreases about 4.1% Minimum pressure at bottom oil guns is 21.7 bar.
PIPENETTM - Leading the Way in Fluid Flow Analysis TRANSIENT MODULE APPLICATION FUEL OIL SYSTEM Scenario 1: Open Oil Guns (1B - 4B) in 0.3s
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
Flowrate at middle oil guns increases to 1750 kg/hr Minimum pressure at middle oil guns is 20.75 bar.
PIPENETTM - Leading the Way in Fluid Flow Analysis TRANSIENT MODULE APPLICATION FUEL OIL SYSTEM Scenario 2: Oil Pump Switch
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
PIPENETTM - Leading the Way in Fluid Flow Analysis TRANSIENT MODULE APPLICATION FUEL OIL SYSTEM Scenario 2: Oil Pump Switch
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
CONDITIONS All Oil Guns Are Opened. Return Oil Is Controlled at 25 Bar Using A PID Controller. Oil Pump A Trip in 4 Seconds. Oil Pump B Start-up Automatically When The Pressure in Supply Line Is Below 25 Barg.
PIPENETTM - Leading the Way in Fluid Flow Analysis TRANSIENT MODULE APPLICATION FUEL OIL SYSTEM Scenario 2: Oil Pump Switch
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
Oil pressure recovery time is about 15 seconds Minimum pressure at oil return line is 10.5 barg.
PIPENETTM - Leading the Way in Fluid Flow Analysis TRANSIENT MODULE APPLICATION FUEL OIL SYSTEM Scenario 2: Oil Pump Switch
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
Minimum flowrate at middle oil guns decreases to 1100 kg/hr. Minimum pressure at middle oil guns decreases to 8.5 barg.
PIPENETTM - Leading the Way in Fluid Flow Analysis TRANSIENT MODULE APPLICATION FUEL OIL SYSTEM Scenario 2: Oil Pump Switch
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
PIPENETTM - Leading the Way in Fluid Flow Analysis TRANSIENT MODULE APPLICATION FUEL OIL SYSTEM Scenario 3: Accumulator Installed On Supply Line
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
PIPENETTM - Leading the Way in Fluid Flow Analysis TRANSIENT MODULE APPLICATION FUEL OIL SYSTEM Scenario 3: Accumulator Installed on Supply Line
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
PIPENETTM - Leading the Way in Fluid Flow Analysis TRANSIENT MODULE APPLICATION FUEL OIL SYSTEM Scenario 3: Accumulator Installed on Supply Line
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
Minimum flowrate at middle oil guns decreases to 1600 kg/hr. Minimum pressure at middle oil guns decreases to 18.0 barg.
PIPENETTM - Leading the Way in Fluid Flow Analysis TRANSIENT MODULE APPLICATION FUEL OIL SYSTEM
CONCLUSIONS
Open Oil Guns by The Group of Four Wont Cause Any Problem to The Fuel Oil System. The Supply Pressure of The Oil Guns Is Above 20 barg. Pump Trip and Switch Is A Very Dangerous Case. The Supply Pressure of The Oil Guns May Drop Down to 8.5 barg, Which Is Lower Than The Allowed Minimum Pressure 10 barg. Accumulator Can Stabilize Oil Pressure Efficiently.
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
PIPENETTM - Leading the Way in Fluid Flow Analysis SPRAY/SPRINKLER MODULE APPLICATIONS
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
Deluge systems Firewater ring mains Foam solution systems Sprinkler systems
Gas Platform Complex In Danish North Sea Seven Platforms Connected By Bridge Connections Complete System in One Simulation Input by ISC in Denmark
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
PIPENETTM - Leading the Way in Fluid Flow Analysis STANDARD MODULE APPLICATIONS IN PROCESS INDUSTRY
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
Steam Distribution Systems Ventilation Systems Compressed Air Systems Seawater Systems Closed Loop Systems
KEY POINTS Jamnagar refinery is one of the biggest refineries in the world The larger pipes are more than 1 m diameter Calculations done by Bechtel UK Extension to an existing system There are several inputs and outputs The medium is superheated steam
OBJECTIVES
Check Line Sizes and Velocities
KEY POINTS
Made of GRP material Main header size in Phase 1 of the project was 3.5 m diameter Main header size in Phase 2 of the project was 4.5 m diameter 9 pumps 7 lead and 2 standby Each pump had a capacity of some 48,000m3/hr, making a total of 336,000 m3/hr
OBJECTIVES
To size the pipes To select the pumps and ensure their adequacy under different conditions To check control systems requirements The users were plants operated by other companies. Guarantee availability of water Optimise the control systems in order to minimise power consumption
25 mm Hole Leak
KEY FEATURES
Extract Ventilation System Manufacturing Plant for Fuel Elements for Nuclear Power Plant Machining Workshop Each Machine Individually Ventilated Rectangular and Circular Ducts
OBJECTIVES
Maintain sufficient negative pressure at machines
PIPENETTM - Leading the Way in Fluid Flow Analysis STANDARD MODULE APPLICATIONS IN POWER INDUSTRY
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
Pipe Sizing
Pump Optimize
Pressure Drop Calculation Flow Distribution Calculation
PIPENETTM - Leading the Way in Fluid Flow Analysis STANDARD MODULE APPLICATION 600 MW SUPERCRITICAL UNIT FEED WATER SYSTEM, CHINA
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
PIPENETTM - Leading the Way in Fluid Flow Analysis STANDARD MODULE APPLICATION FEED WATER SYSTEM
KEY POINTS
600 MW Supercritical Unit. Dn300/450 Feed Water Pipes. 3x50% Feed Water Pump Units. Three High Pressure Heat Exchanger.
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
PIPENETTM - Leading the Way in Fluid Flow Analysis STANDARD MODULE APPLICATION FEED WATER SYSTEM
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
OBJECTIVES
Select Pipe Size and Calculate Flow Velocity. Optimize Pump Head and Capacity. Valid Minimum Bypass System. Calculate NPSH at Pump Inlet.
PIPENETTM - Leading the Way in Fluid Flow Analysis STANDARD MODULE APPLICATION FEED WATER SYSTEM RESULTS 1: FLOWRATE
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
PIPENETTM - Leading the Way in Fluid Flow Analysis STANDARD MODULE APPLICATION FEED WATER SYSTEM RESULTS 2: PRESSURE
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
PIPENETTM - Leading the Way in Fluid Flow Analysis STANDARD MODULE APPLICATION FEED WATER SYSTEM RESULTS 3: VELOCITY
SUNRISE SYSTEMS LIMITED Sunrise Business Park Ely Road Waterbeach Cambridge CB25 9QZ United Kingdom Tel.: +44 1223 441311 Fax: +44 1223 441297 E-mail: pipenet@sunrise-sys.com Web: www.sunrise-sys.com
Network
Complex
Simple
Main Systems
Utility systems, firewater systems, surge analysis Steady state (Design), Transient state (Analysis) Fast input of complex networks Fast calculations and reliable results
Main applications
Priority 1
Good thermodynamics
Priority 2
Reliable results