RIGGING DEPARTMENT

ANALYZE AND PLANED ACTIVITY FOR LIFTING AND ERECTION WORK

RIGGING DEPARTMENT LOGO


LIFT SWING MOVE DOWN In safety corridor

THINK SAFE DO SAFELY SAFETY FIRST

START
DATA MATERIAL 1. DIMENSION 2. WEIGHT REFERENCE 1. RIGGING BOOK 2. EQUIP. MANUAL 3. Standard Rigging

NEED DUO CRANE No Risk MONO CRANE

Yes

TAILING DESIGN

JSA

RIGGING PLAN ACTION CONTROL REPORT

STOP

Rigging Engineer Responsibility


Prepare Rigging Procedures:
(1) Method Of Work, sequence of activities (2) Job Safety Assessment Procedures, Sequence and criterion for safely condition (3) Safe Work Method Statements, Metode kerja yang aman (4) Risk Management Safe Work Method Statement (SWMS), (5) Rigging Plans, (6) Rigging Tools, (7) Critical Lift Worksheet, (8) Lift Study, (9) Crane Lift Study, (10) General Scaffolding Safety Checklists).

Definition of Rigging
Rigging is part of the lifting operation which forms the link between the crane and the load

Lifting Plan

Displacement

Safety Factor

RIGGING PLAN LIFTING FOR POWER CONTROL CENTERS

Lifting Procedure

LIFTING TOOLS IN SPECIAL CONDITION

STEP 1

LIFTING TOOLS IN SPECIAL CONDITION

STEP 2

LIFTING TOOLS IN SPECIAL CONDITION

STEP 3

LIFTING TOOLS IN SPECIAL CONDITION

STEP 4

Displacement Frame Analysis

Displacement Stress Analysis