Scope Statement
Project Objective:
Building a Fly Ash Handling Plant within 3 months.
Deliverables
Ready to operate plant
Milestones:
1) 2) 3) 4) Design Approval Precipitator Construction Civil work completion Commissioning
Scope of work:
1. 2. 3. 4. 5. 6. 7. Design Equipment Manufacturing Transportation Civil construction at onsite Assembly Installation Commissioning
Technical Requirements:
1.Capacity:
Thermal Plant Capacity: 500MW Coal Req./MW : 10 tonnes Total Coal/day: 5000 tonnes Ash: 50 % of 5000 tonnes Capacity: approx. 100 tonnes/hour 2. Dimension: 100metre x 40 metres
~
~ ~ ~ ~ ~ ~ ~
Onsite Commission
Civil Construction
Precipitator foundation Factory outer structure and shade Ash duct set up structure Slurry duct setup structure Slurry Collector
Order Placement
Set up
Precipitator setup Ash duct setup Slurry duct setup Ash duct assembly with boiler Slurry duct assembly with collector Final setup
Induction order
Electric components
Pneumatic valves
Booster fans
Slurry pump
Induction system
Pneumatic valves Compressor Collection System Booster fans Collection silos Slurry pump Slurry duct Slurry collector
Equipment Design
Slurry system
Manufacturing
Precipitator
Sheet metal Cutting Grinding Welding Fabrication Inspection
Loading
Transport
Unloading
Collection silos
Sheet metal Cutting Grinding Welding Fabrication Inspection
Ash duct
Sheet metal Cutting Grinding Welding Fabrication Inspection
Loading
Transport
Unloading
Slurry duct
Sheet metal Cutting Grinding Welding Fabrication Inspection
Loading
Transport
Unloading
GM Manufacturing
GM Finance
GM HR
Project A
Project B
Critical Path
Thank you