Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Prepared by : NDPM
11 October 2012
Huawei Confidential
Methodology
Tools Used :
TEMS Investigation 9.0, Scanner PCTEL Seagull Ex Mini, 2 K800i without external antenna.
Methodology :
Huawei Confidential
Trial Route
Huawei Confidential
Scanner RSCP
Note : Before Changing parameter
Note : After Change PCPICH Power from 33dBm to 36dBm Spot with red circle improved.
Note : Fallback PCPICH Power from 36dBm to 33dBm Change MAXTXPOWER from 46 to 43
Huawei Confidential
Scanner EcNo
Note : Before Change parameter
Note : After Change PCPICH Power from 33dBm to 36dBm Spots with red circle improved.
Note : Fallback PCPICH Power from 36dBm to 33dBm Change MAXTXPOWER from 46 to 43
UE Idle RSCP
Note : Before Change parameter
Note : After Change PCPICH Power from 33dBm to 36dBm Spot with red circle improved.
Note : Fallback PCPICH Power from 36dBm to 33dBm Change MAXTXPOWER from 46 to 43
Huawei Confidential
UE Idle EcNo
Note : Before Change parameter
Note : After Change PCPICH Power from 33dBm to 36dBm Spot with red circle improved.
Note : Fallback PCPICH Power from 36dBm to 33dBm Change MAXTXPOWER from 46 to 43
UE Dedicated RSCP
Note : Before Change parameter
Note : After Change PCPICH Power from 33dBm to 36dBm Spot with red circle improved.
Note : Fallback PCPICH Power from 36dBm to 33dBm Change MAXTXPOWER from 46 to 43
Huawei Confidential
UE Dedicated EcNo
Note : Before Change parameter
Note : After Change PCPICH Power from 33dBm to 36dBm Spot with red circle improved.
Note : Fallback PCPICH Power from 36dBm to 33dBm Change MAXTXPOWER from 46 to 43
Before
5 405 467 475 1352 >= -12
Percentage
0.37% 29.96% 34.54% 35.13% 100.00% 64.87% Percentage
EcNo
0 t0 -4 -4 to -8 -8 to -12 -12 to -20 Total
Aftrer 1
31 519 523 266 1339 >= -12
Percentage
2.32% 38.76% 39.06% 19.87% 100.00% 80.13% Percentage
EcNo
0 t0 -4 -4 to -8 -8 to -12 -12 to -20 Total
After 2
33 398 516 267 1214 >= -12
Percentage
2.72% 32.78% 42.50% 21.99% 100.00% 78.01% Percentage
RSCP
Before
RSCP
Aftrer 1
RSCP
After 2
0 t0 -4
-4 to -8 -8 to -12 -12 to -20 Total
27
553 608 654 1842 >= -90
1.47%
30.02% 33.01% 35.50% 100.00% 64.50% Percentage 1.07% 29.58% 38.12% 31.23% 100.00% 68.77%
0 t0 -4
-4 to -8 -8 to -12 -12 to -20 Total
119
664 564 208 1555 >= -90
7.65%
42.70% 36.27% 13.38% 100.00% 86.62% Percentage 6.25% 46.81% 40.30% 6.63% 100.00% 93.37%
0 t0 -4
-4 to -8 -8 to -12 -12 to -20 Total
87
502 605 300 1494 >= -90
5.82%
33.60% 40.50% 20.08% 100.00% 79.92% Percentage 4.86% 38.04% 42.31% 14.79% 100.00% 85.21%
Huawei Confidential
DL Power Blocking
Huawei Confidential
Summary
Purpose of trial : To make comparison EcNo level when changing parameter 1. PCPICH Power 2. Total DL Power
Conclusion : 1.By increasing PCPICH from 330dBm to 360dBm : RSCP is maintained EcNo is slightly improve on some spot 2. Change MAXTXPOWER from 460dBm to 430dBm : RSCP is slightly decreased at some spot EcNo is slightly improved on some spots. 3.Best EcNo distribution (samples of >= -12 dB) found in 2nd scenario when CPICH set to 36 dBm while Max Tx Power set to 46 dBm (40W), equal to 10% proportion.
Huawei Confidential
Huawei Confidential
13
11 October 2012