Sei sulla pagina 1di 39

Dual Gradient Drilling

Basic Technology
Lesson 2 Key Success Factors in DGD Jerome J. Schubert Hans C. Juvkam-Wold

11/06/00

Confidential to Subsea Mudlift Drilling JIP

DGD Template 1 of 42

Introduction
Success Factors in Equipment Success Factors in Drilling Operations Success Factors in Well Control

11/06/00

Confidential to Subsea Mudlift Drilling JIP

DGD Template 2 of 42

Success Factors in Equipment


Riser Return line Achieving dual density Cuttings processing unit Isolation of mud from seawater Managing the u-tube

11/06/00

Confidential to Subsea Mudlift Drilling JIP

DGD Template 3 of 42

Riser
No Riser Conventional Riser Other


11/06/00

Phantom riser Super straw Cork/Snapper Holy riser Top drum/tulip


Confidential to Subsea Mudlift Drilling JIP DGD Template 4 of 42

Return line
Riser Free standing Choke & Kill line Boost line Separate return line

11/06/00

Confidential to Subsea Mudlift Drilling JIP

DGD Template 5 of 42

Achieving dual density


Gas lift Glass beads Water-jet pump Centrifugal pump Positive displacement pump

11/06/00

Confidential to Subsea Mudlift Drilling JIP

DGD Template 6 of 42

Positive displacement pumps


Progressive cavity pumps Reciprocating Piston or Plunger pumps Diaphragm pumps

11/06/00

Confidential to Subsea Mudlift Drilling JIP

DGD Template 7 of 42

Diaphragm pumps
Constant discharge rate High efficiency Large volume displacement Good HP rating Low pressure surges Can handle mud, gas, and solids

11/06/00

Confidential to Subsea Mudlift Drilling JIP

DGD Template 8 of 42

Pump Design Criteria


Maximum output GPM Maximum output HP Maximum pressure Maximum mud density

11/06/00

Confidential to Subsea Mudlift Drilling JIP

DGD Template 9 of 42

Pump Controls
Match subsea pump rate with surface pump rate Automatic pump operation vs. manual controls Reaction time for start, stop, change in rate Subsea seawater pressure sensor Subsea mud reservoir level sensor

11/06/00 Confidential to Subsea Mudlift Drilling JIP DGD Template 10 of 42

Pump Redundancy

What can be done if one or more of the pump chambers fails?

11/06/00

Confidential to Subsea Mudlift Drilling JIP

DGD Template 11 of 42

Pump power

Hydraulic power
Electric motors to run hydraulic pumps Hydraulic fluid pumped from the surface

11/06/00

Confidential to Subsea Mudlift Drilling JIP

DGD Template 12 of 42

Solids processing unit


System must handle solids in some way Pump ok How about plugging choke/kill and return lines?

11/06/00

Confidential to Subsea Mudlift Drilling JIP

DGD Template 13 of 42

Isolation of mud from seawater


How do we separate mud in the annulus from the seawater either in the riser or open ocean? SRD Pressure rating Active for tripping, running casing, logging, etc.

11/06/00 Confidential to Subsea Mudlift Drilling JIP DGD Template 14 of 42

Managing the u-tube


How will we handle the u-tube? Write all procedures compensate for the active u-tube? Build a DSV to manage it?

11/06/00

Confidential to Subsea Mudlift Drilling JIP

DGD Template 15 of 42

DSV design factors


How is it going to open and close? Will it have an adjustable opening pressure? Will it pass MWD signals and LCM? What will it do to circulating pressures? Are the opening and circulating pressure repeatable? Where will it be located in the drillstring?

11/06/00 Confidential to Subsea Mudlift Drilling JIP DGD Template 16 of 42

Success Factors in Drilling Operations


Lower riser loads Lower deck loads Lower deck space requirements Drill to TD with fewer casing strings

11/06/00

Confidential to Subsea Mudlift Drilling JIP

DGD Template 17 of 42

Success Factors in Drilling Operations


Balanced Cement Plug Running Casing Cementing Check for Underbalance Circulation Connections

Dual to Single Density Conversion Routine Drilling Start-Stop Circulation Tripping Unplanned Shutdown Fishing Logging
DGD Template 18 of 42

11/06/00

Confidential to Subsea Mudlift Drilling JIP

What a Dual Gradient Drilling System Must Be Able To Do For Effective Well Control

A 11/06/00

TM

Confidential to Subsea Mudlift Drilling JIP

DGD Template 19 of 42

Outline
Understanding DGD Well Control - what is different ? How can we educate ourselves and develop a detailed understanding?

What must an effective DGD well control system be able to accomplish?


What must an effective DGD system contain?

11/06/00

Confidential to Subsea Mudlift Drilling JIP

DGD Template 20 of 42

Understanding WC in DGD
Accept that DGD Well Control is not a simple task - it is different - and it is frequently neither intuitive nor obvious for example U-tubing - how does it affect kick detection? - how can we ensure that a constant bottomhole pressure is being maintained? - what if power fails during WC operations? More details later . . .
11/06/00 Confidential to Subsea Mudlift Drilling JIP DGD Template 21 of 42

U-Tubing in DGD
FLOATER
~SEAWATER HYDROSTATIC PRESSURE

STATIC FLUID LEVEL

BOP

PUMP

Even with a DSV there is still a potential U-tube

A 11/06/00

TM

Confidential to Subsea Mudlift Drilling JIP

DGD Template 22 of 42

Outline
How can we educate ourselves and develop a detailed understanding?

11/06/00

Confidential to Subsea Mudlift Drilling JIP

DGD Template 23 of 42

How can we Educate Ourselves?


We have found that detailed hydraulics modeling is essential to understanding DGD Study each aspect of the process in detail: - Four PhD and seven MS studies have been completed or are in progress at Texas A&M! Detailed procedures had to be developed to cover all essential drilling and WC operations Procedures are critically peer reviewed and tested against the hydraulics model
11/06/00 Confidential to Subsea Mudlift Drilling JIP DGD Template 24 of 42

Outline
What must an effective DGD well control system be able to accomplish?

11/06/00

Confidential to Subsea Mudlift Drilling JIP

DGD Template 25 of 42

WC System must be able to:


Avoid kicks - as far as possible Detect Kicks early - to minimize their size Determine kick size and Intensity Measure new formation pressure (SI-BHP) Safely remove kick from hole Maintain constant BHP Detect equipment failures during WC operations Provide contingencies for all potential failures
11/06/00 Confidential to Subsea Mudlift Drilling JIP DGD Template 26 of 42

Avoiding Kicks
Recognize the signs of increasing pore pressure? How? Allow the recovery of cuttings of sufficient size to evaluate their characteristic shape and other properties? Allow you to maintain satisfactory BHP during connections? While tripping? When cementing? When power fails?
11/06/00 Confidential to Subsea Mudlift Drilling JIP DGD Template 27 of 42

Detecting Kicks Early


Can you perform a conventional flow check?

How accurate is your pit gain indicator?


What other kick detection methods are available? What is the smallest kick that can detect? How quickly can you stop the influx? How? How do you handle the U-tube to ensure that its effects are not confused with kick indicators?
Confidential to Subsea Mudlift Drilling JIP

11/06/00

DGD Template 28 of 42

Dual Gradient Drilling System


FLOATER

Surface Pump Seafloor Pump


SEAFLOOR
BOP

~SEAWATER HYDROSTATIC PRESSURE PUMP

How are you going to handle this kick?

KICK
A 11/06/00

TM

Confidential to Subsea Mudlift Drilling JIP

DGD Template 29 of 42

Determining Kick Size


What is the initial size of the kick when its presence is first confirmed? What is the size of the kick when influx stops? How can you measure kick volume and intensity? How can you maintain constant BHP - while circulating the kick out of the hole? - if you cant circulate and kick is migrating? What is the Expected Kick Fluid Behavior?
11/06/00 Confidential to Subsea Mudlift Drilling JIP DGD Template 30 of 42

Gas Kick Behavior


As the gas kick moves up the hole the pressure generally decreases so we would expect the gas volume to expand - but how fast? At the seafloor pump there is an increase in pressure - how does the volume behave? Can we continue to assume that PV = const?

Or should we use PV = ZnRT?


We will take a closer look!
11/06/00 Confidential to Subsea Mudlift Drilling JIP DGD Template 31 of 42

Outline
What must an effective DGD system contain? - Essential Equipment?

11/06/00

Confidential to Subsea Mudlift Drilling JIP

DGD Template 32 of 42

Which DGD System?


There are basically two different methods we can use to

Reduce annulus pressure at seafloor:


Install pump at seafloor

Inject a low density fluid in the return line


Gas (e.g. air or nitrogen) Low density particles (e.g. hollow spheres)

Can we maintain safe well control with all of these methods?


11/06/00 Confidential to Subsea Mudlift Drilling JIP DGD Template 33 of 42

Dual Gradient Drilling System


FLOATER

Surface Pump Trip Tank(s) Mud Tanks, etc


SEAFLOOR
BOP

~SEAWATER HYDROSTATIC PRESSURE Seafloor Pump

Or gas or bead injector

Seafloor Pump - Power Transmission - Sensors - Controls

Seafloor Choke? - Backup? Coordination between the pumps? - Instrumentation


Confidential to Subsea Mudlift Drilling JIP DGD Template 34 of 42

KICK
A 11/06/00

TM

In Summary ...

What are the Key Factors that will

ensure safe and efficient DGD


Drilling and Well Control?

11/06/00

Confidential to Subsea Mudlift Drilling JIP

DGD Template 35 of 42

Key Success Factors for Well Control in DGD?


Kick Detection Kick Containment (stop flow into well) Kick Removal (circulate kick out of hole?) Determine New Pore Pressure (after kick)

Increase Mud Weight in hole (if necessary)


Perform Leak-off Test
11/06/00 Confidential to Subsea Mudlift Drilling JIP DGD Template 36 of 42

Key Success Factors - contd


Manage the U-tube Detect and Manage Trapped Pressure Use Drillers Method

Perform Volumetric Well Control


Manage Kick Expansion
(pump very slowly)

Manage Loss of Pumping Capability


Understand the Behavior of Gas Kicks
11/06/00 Confidential to Subsea Mudlift Drilling JIP DGD Template 37 of 42

Additional Success Factors


Tripping Logging Running Casing Cementing Casing Setting Cement Plugs, etc.

Handle Non-water Based Drilling Fluids

11/06/00

Confidential to Subsea Mudlift Drilling JIP

DGD Template 38 of 42

The End
Jerome J. Schubert Hans C. Juvkam-Wold

Key Success Factors in DGD

11/06/00

Confidential to Subsea Mudlift Drilling JIP

DGD Template 39 of 42

Potrebbero piacerti anche