Page 1 of 2

Radiogram No. 6014u Form 24 for 08/30/07


CLEANING FAN SCREENS ON FGB INTERIOR PANELS. АСН-М TEST CONTINUED
GMT CREW ACTIVITY
06:00-06:10 Morning Inspection
06:10-06:40 Post-sleep
06:40-07:30 BREAKFAST
07:30-07:45 Daily Planning Conference (S-band)
07:45-08:25 CDR Filling EDV [KOV] for Elektron from CWC #1077
07:45-08:15 FE-1 Prep for Work
07:45-07:50 LAB window cover closure
07:50-08:10 FE-2 Emergency, Warning Book Update
08:10-08:20 MELFI - hardware teardown
Replacement of БРПК separator on 1st line (New # 405009, b/c 00038681R
08:15-09:05 FE-1
ФГБ1ПГО_4_424_1 0.5 CTB # 1263, Discard removed separator)
08:25-08:55 CDR СОЖ Maintenance
08:30-08:45 PMA3 - pressure monitoring
FE-2
08:55-09:05 CWC audit
[АСН] raw data transfer to flash-card and downlink via OCA Tagup with
08:55-09:55 CDR
specialists via VHF (S-band if available)
09:05-09:25 FE-1 IMS update
09:15-09:35 FE-2 PMA3 - pressure monitoring
09:25-09:35 PMIC jumper cable installation
FE-1
09:35-09:50 Starting DOUG software to support SSRMS ops
09:35-09:50 FE-2 CBCS power activation
09:50-10:25 FE-1, FE-2 PMA 3 grapple using SSRMS
09:55-10:55 CDR PMA3 CBM Demate
10:55-11:55 FE-1, FE-2 PMA 3 translate using SSRMS
11:55-12:05 CDR Node 1 nadir port CBM monitoring pre-mate
12:05-12:35 FE-1, FE-2 PMA3 install on Node 1 nadir using SSRMS
12:35-12:50 CDR Node1- – first stage of CBM grapple in nadir port
12:50-12:55 FE-1, FE-2 РМА3 maneuver with SSRMS

12:55-13:40 CDR Node 1 - second stage of CBM grapple in nadir port and bolt movement

12:55-13:55 FE-1, FE-2


LUNCH
13:40-14:40 CDR
13:55-14:00 SSRMS breaking system activation.
14:15-14:35 FE-1, FE-2 PMA3 ungrapple using SSRMS
14:35-15:00 PMA 3 maneuver using SSRMS
15:00-15:15 CDR Node1 - port petals closure
15:10-16:40 FE-1 Physical Exercise (TVIS) Day 2
15:15-16:35 CDR Fan screen cleaning on FGB interior panels 116, 316, 231, 431
15:15-16:15 FE-2 Physical Exercise (RED)
16:15-16:20 Disconnect Display and Control Panel (DCP) power cable
Page 2 of 2

16:20-16:35 VHF test using US ground sites


16:35-17:05 Removal of Centerline Berthing Camera System (CBCS)
16:40-17:40 FE-1 Physical Exercise (RED)
16:45-18:15 CDR Physical Exercise (TVIS) Day 2
17:05-17:10 Latch N1 Hatch
17:10-17:25 EPO - Growth Chamber C Monitoring
FE-2
17:25-17:40 Questionnaire - log entry
17:40-19:10 Physical Exercise (CEVIS)
17:40-18:40 Ventilation grille cleaning on FGB interior panels (panels 201, 301, 401)
FE-1
18:40-19:15 Evening work prep
18:15-19:15 CDR Physical Exercise (VELO + RED) day 2
19:10-19:15 FE-2 Transfer TVIS/RED/CEVIS/HRM data to MEC
19:15-19:30 Daily Planning Conference (S-band)
19:30-20:00 DINNER
20:00-20:30 . Daily Food Prep
20:30-21:30 Pre-sleep
21:30-06:00 SLEEP
GSF-JAXA. ТБУ temperature monitoring (in the morning) / r/g 5902
Task List FE-1
PLANTS-1. Payload status check (in the morning) / r/g 5831
Note: See OSTP for references to US activities.
End of Radiogram