Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
DO MONTE
Rua de Farim, n.6, Cruz de Pau, 2845-081 Amora, Portugal
Professional Profile
A hands-on, dynamic, result-oriented Superintendent with over 35 years of significant achievement in managing piping projects across a wide range of industries and technical levels. Having worked with many top companies in international shipping and construction industries, onshore and offshore, I have become highly competent in a variety of fields. I trust my experience will back this statement up and look forward to my next challenge. Some of my core competencies include:
Health, Safety & Environment Pre-Fabrication & Erection Manpower & Man-Hours Planning Daily Reports
Quality Control Drawings Execution Budget Planning & Management Punch List and Tests
Work History
Field Engineer THYSSENKRUPP Companhia Siderrgica Do Atlntico - Brasil 05.2008 12.2011
Responsible on the different areas for the construction proposals analysis and on the Construction side, for the coordination of contractor companies, evaluating their progress daily to ensure that the project specifications and agreed schedule are followed accordingly. Ensure that the Construction Plan is followed correctly, by identifying and resolving any project deviations, therefore maintaining the stipulated project schedule, quality, safety & environmental measures at all times. Coordination of test packs and punch lists. Part of a pre-commissioning team.
10.2007 04.2008
Project: Horizont Primary Upgrade. Monitoring and assisting in the implementation of project quality and safety & environment. Liaising with clients, engineers and consultants. Co-ordinating and reviewing of drawings submissions, specifications, changes and document control. Assisting with the preparation and maintenance of the project schedule. Coordinating inspection duties and assisting in construction design, including preparation of layout and lift drawings. Coordinating field details, site inspections and liaising with subcontractors. Identified and resolving field technical issues.
Site Superintendent
11.2006 - 09.2007
Gas Expansion Project - Ras Laffan. Responsible for the mechanical and piping erection of the Sulphur Storage and Refrigerant Area including all Tie-ins preparation, fabrication and installation.
Piping Surveyor
03.2006 - 10.2006
TOTAL Rosa project on Board of FPSO Girassol, Luanda, Angola. Surveyed all new line routes before pre-fabrication. Elaborated reports, when necessary, to justify modifications and propose new routes for approval.
1|P a g e
03.2005 - 11.2005
Responsible for the elaboration and coordination of all test packs for all piping systems on the new project. Surveyed quality control and documentation for take-over.
05.2004 02.2005
Worked as Supervisor in the new project of LPG BOTTLE FILLING PLANT. Followed up daily progress and coordinated all installation machineries and piping erection. Surveyed quality control and documentation for take-over. Advisor and coordinator during the pre-commissioning, commissioning and start-up.
02.2004 04.2004
Worked as Supervisor on the shut-down and was responsible for the Reactor, Regenerator and 3rd Stage Separator repairs, on the Catalic Fluid Cracking Unit. Coordinated and followed up the daily progress.
Supervisor
09.2003 01.2004
Responsible for fabrication and installation of piping for Main Condenser, Boiler and Gas Turbine.
Shift Supervisor
06.2003 08.2003
Field Engineer
10.2002 05.2003
Was part of the team responsible for final inspections (Test Packs, Punch Lists, Hydro-Tests and As Built drawings). Followed up pre-commissioning.
01.1986 09.2002
Worked as a Senior Supervisor of the Pipe Department overseeing a total of 375 employees. Responsible for the coordination of Work Preparation, Manpower and Man-hours Planning. Prepared studies and analysis of work specifications presented by the owners for the piping job of different vessels like VLCC Tankers, LPG and LNG Gas Carriers, Rigs, Platforms, Navy Vessels, FPSOs, etc.
Senior Draftsman
1979-1986
Worked as a Senior Draftsman in the Mechanical Drafts Office for machinery & piping of new vessel projects (VLCC Tankers, Bulk Carriers, etc.). Executed different type of drawings including Isometrics, General Arrang., P&ID, etc.
1975-1979
Worked as a Senior Work Preparator in the New Projects Central Office. Coordinated and controlled the distribution of all jobs related equipment, structures, piping, etc., for fabrication and installation within the different departments.
2|P a g e
1974-1975
Worked as Shop Work Preparator, preparing all job phases for fabrication, including bending and cutting machines.
1971-1974
Worked as a Pipe Work Preparator on board of different vessels coordinating all jobs between on board and workshop.
Pipe Fitter
1968-1971
Computer Proficiencies
Microsoft Office (Excel, Word, PowerPoint, Outlook, Project)
Hobbies
Tennis, Running, and Reading
Personal Details
Nationality: Marital Status: Portuguese Married
3|P a g e