Sei sulla pagina 1di 43

INGENIERO CIVIL

C. PRF. 1 734 741

VICTOR ALFONSO LOPEZ ORTEGA

ARQUITECTO
DRO. No. 301

2012

ANTECEDENTES.EN RELACION AL SUCESO OCURRIDO EN FECHAS PROXIMAS PASADAS, RESPECTO A LA FALLA


QUE PRESENTO EL PISO DE FONDO DE UNO DE LOS COMPARTIMENTOS DE UN TANQUE DE
ALMACENAMIENTO DE AGUA POTABLE, OCURRIDA DURANTE EL LLENADO DEL TANQUE
SUPERIOR DEL STAND PIPE QUE LA EMPRESA TANQUES DEL NORTE, PROYECTO Y CONSTRUYO
EN LA CIUDAD DE PUEBLA, SE SOLICITO SE EFECTUARA LA REPARACION EN FORMA INMEDIATA
DE LOS ELEMENTOS COLAPSADOS,PARA LO CUAL EL SUSCRITO EFECTUO UN DICTAMEN DE LAS
CAUSAS QUE OCASIONARON DICHA FALLA, ASI COMO ESTABLECIO LOS PROCEDIMIENTOS A
SEGUIR PARA DEFINIR LA ESTRATEGIA DE REPARACION DEL DAO, DANDOSE A CONOCER EN SU
OPORTUNIDAD A LAS AUTORIDADES DEL FRACCIONAMIENTO LOS RESULTADOS DE LA VISITA
DE INSPECCION TECNICA, CON EL INFORME RESPECTIVO, QUEDANDO PENDIENTE LA ENTREGA
DE NUEVA EVALUACION EN BASE A ANALISIS ESTRUCTURAL EFECTUADO A TRAVEZ DE UN
MODELO VIRTUAL CON LAS ADECUACIONES Y/O MODIFICACIONES SUGERIDAS Y SOLICITADAS
POE LAS AUTORIDADES DEL FRACCIONAMIENTO, SOLICITANDOSE TAMBIEN SE ENTREGARA EL
PLANO BORRADOR QUE ORIGINALMENTE SE PLANTEARA AL PROYECTAR EL STAND PIPE.
POR TAL MOTIVO A CONTINUACION PRESENTO EL RESUMEN DE REULTADOS DEL ANALISIS
ESTRUCTURAL QUE SE EFECTUO AL MODELO VIRTUAL Y EL REPORTE DE LOS RESULTADOS DE
LA CORRIDA ESTRUCTURAL DE ANALISIS, ANEXANDO AL EXPEDIENTE COPIA DEL PLANO
BORRADOR ORIGINAL DEL PROYECTO.
CON LA ESTRATEGIA DE ADECUACION Y REPARACION DEL DAO SE ORDENO SE COLOCARAN
LOS ANILLOS DE RIGIDEZ HORIZONTAL QUE ORIGINALMENTE SE HABIAN PLANTEADO Y QUE SE
OMITIO COLOCAR EN UNA PRIMERA FASE CONSTRUCTIVA, ADEMAS SE RECOMENDO MODIFICAR
EL PERALTE DE LAS VIGAS DE PISO DEL FONDO DEL TANQUE SUPERIOR, Y EL DISEO DE UNION
ENTRE ESTAS, ORDENADOSE POR SUGERENCIA DE LA AUTORIDAD DEL FRACCIONAMIENTO
COLOCAR TORNAPUNTAS AL CENTRO DE ESTE PISO SOPORTADAS POR LAS PAREDES DEL
TANQUE, ASI MISMO SE CONSIDERO ADECUADO REFORZAR EL COMPORTAMIENTO DEL STAND
PIPEEN CONJUNTO BAJO LA ACCION SISMICA CON LA COLOCACION DE CONTRAVENTEOS EN
CRUZ DE LOS PANELES QUE FORMAN LOS ANILLOS DE RIGIDEZ HORIZONTAL CON LAS
NERVADURAS VERTICALES O COLUMNAS DE SOPORTE DEL TANQUE SUPERIOR.

ANALISIS ESTRUCTURAL-PROYECTO DE READECUACION DE SATAND PIPE-MARZO 9 PUEBLA,PUE.

INGENIERO CIVIL
C. PRF. 1 734 741

VICTOR ALFONSO LOPEZ ORTEGA

ARQUITECTO
DRO. No. 301

2012

RESUMEN DE DISEO

LOS PERFILES DE ACERO UTILIZADOS PARA EL ANALISIS Y DISEO ESTRUCTURAL


BAJO LA ACCION DE CARGAS CRTICAS (GRAVITACIONALES-SISIMO) SON LOS
SIGUIENTES:
TRABES PRINCIPALES:

IPR 70cmx25cm EN PLACA DE

TRABES SECUNDARIAS:

IPR 50cmx25cm EN PLACA DE

LARGUEROS:

IPR 12x4 EN 16LBS/PIE (23.8Kg/m)

COLUMNAS:

IPR 50cmx25cm EN PLACA DE

CONTRAVENTEOS:

PTR DE 4x4 EN (25.7Kg/m)

LAS TRABES PRINCIPALES SE USARAN PARA EL ANILLO DE RIGIDEZ Y LAS 8 VIGAS


QUE LLEGAN A COLUMNAS EN LA RETICULA RADIAL PARA EL COMPARTIMIENTO
SUPERIOR. LAS TRABES SECUNDARIAS SE UTILIZARAN PARA TODAS LAS DEMAS
VIGAS DE DICHA RETICULA RADIAL (VER PLANO).

CON LOS ELEMENTOS ESTRUCTURALES PROPUESTOS SE OBSERVA UN BUEN


COMPORTAMIENTO ANTE CARGAS CRITICAS (SISMO Y TANQUE LLENO) YA QUE
NINGUN MIEMBRO PASA DEL 80% DE EFICIENCIA Y EL DESPLAZAMIENTO MAXIMO
ES DE 27.6mm QUE COMPARADO CON EL DESPLAZAMIENTO PERMISIBLE (L/500)
DE 46mm ESTA SOLO AL 59%.

ANALISIS ESTRUCTURAL-PROYECTO DE READECUACION DE SATAND PIPE-MARZO 9 PUEBLA,PUE.

INGENIERO CIVIL
C. PRF. 1 734 741

VICTOR ALFONSO LOPEZ ORTEGA

ARQUITECTO
DRO. No. 301

2012

LA TABLA DE DESPLAZAMIENTOS MAXIMOS OBTENIDOS CON EL MODELO VIRTUAL


SE MUESTRA A CONTINUACION.
SE CONSIGNAN RESULTADOS SATISFACTORIOS DENTRO DE RANGOS PERMISIBLES.

ANALISIS ESTRUCTURAL-PROYECTO DE READECUACION DE SATAND PIPE-MARZO 9 PUEBLA,PUE.

INGENIERO CIVIL
C. PRF. 1 734 741

VICTOR ALFONSO LOPEZ ORTEGA

ARQUITECTO
DRO. No. 301

2012

DIAGRAMA DE ESFUERZOS

DIAGRAMA DE CORTANTE

TANTO ESFUERZOS COMO CORTANTES SE CONSIGNAN COMO RESULTADOS


SATISFACTORIOS DENTRO DE LOS LIMITES PERMISIBLES DE LOS MATERIALES
CONSTITUTIVOS DE SATND PIPE.

ANALISIS ESTRUCTURAL-PROYECTO DE READECUACION DE SATAND PIPE-MARZO 9 PUEBLA,PUE.

INGENIERO CIVIL
C. PRF. 1 734 741

VICTOR ALFONSO LOPEZ ORTEGA

ARQUITECTO
DRO. No. 301

2012

DIAGRAMA DE MOMENTOS

LOS MOMENTOS FLEXIONANTES PRODUCIDOS POR LA COMBINACION DE CARGA


QUE SE UTILIZO PARA EL ANALISIS, SE CONSIGNAN DENTRO DEL RANGO
PERMISIBLE DE TODOS Y CADA UNO DE LOS ELEMENTOS PROBADOS
VIRTUALMENTE BAJO LA ACION DE ESTAS CARGAS.

ANALISIS ESTRUCTURAL-PROYECTO DE READECUACION DE SATAND PIPE-MARZO 9 PUEBLA,PUE.

INGENIERO CIVIL
C. PRF. 1 734 741

VICTOR ALFONSO LOPEZ ORTEGA

ARQUITECTO
DRO. No. 301

2012

Sistema de piso a base de placa 1/4

6
Sistema de piso a base de placa 1/2
Anillos de rigidez placa 1/2
Sistema de tornapuntas de PTR 1/4

Sistema de contra venteos de PTR 1/4

Anillos de rigidez placa 1/4

ESTE FUE EL MODELO VIRTUAL QUE SE PROBO BAJO LA COMBINACION DE CARGAS


GRAVITACIONALES Y SISMICAS, CON EL RESULTADO DE COMPORTAMIENTO ESTRUCTURAL
SATISFACTORIO PARA TODOS LOS ELEMENTOS DISEADOS

ANALISIS ESTRUCTURAL-PROYECTO DE READECUACION DE SATAND PIPE-MARZO 9 PUEBLA,PUE.

INGENIERO CIVIL
C. PRF. 1 734 741

VICTOR ALFONSO LOPEZ ORTEGA

ARQUITECTO
DRO. No. 301

2012

ESTE FUE EL MODELO VIRTUAL QUE SE PROBO BAJO LA COMBINACION DE CARGAS


GRAVITACIONALES Y SISMICAS, CON EL RESULTADO DE COMPORTAMIENTO ESTRUCTURAL
SATISFACTORIO PARA TODOS LOS ELEMENTOS DISEADOS
VISTA EN PERSPECTIVA DESDE ARRIBA

ANALISIS ESTRUCTURAL-PROYECTO DE READECUACION DE SATAND PIPE-MARZO 9 PUEBLA,PUE.

INGENIERO CIVIL
C. PRF. 1 734 741

VICTOR ALFONSO LOPEZ ORTEGA

ARQUITECTO
DRO. No. 301

2012

ESTE FUE EL MODELO VIRTUAL QUE SE PROBO BAJO LA COMBINACION DE CARGAS


GRAVITACIONALES Y SISMICAS, CON EL RESULTADO DE COMPORTAMIENTO ESTRUCTURAL
SATISFACTORIO PARA TODOS LOS ELEMENTOS DISEADOS
VISTA EN PERSPECTIVA DESDE ABAJO

ANALISIS ESTRUCTURAL-PROYECTO DE READECUACION DE SATAND PIPE-MARZO 9 PUEBLA,PUE.

INGENIERO CIVIL
C. PRF. 1 734 741

VICTOR ALFONSO LOPEZ ORTEGA

ARQUITECTO
DRO. No. 301

2012

ANALISIS VIRTUAL.
****************************************************
* *
* STAAD.Pro *
* Version 2005 Bld 1001.US *
* Proprietary Program of *
* Research Engineers, Intl. *
* Date= MAR 9, 2012 *
* Time= 3:46:47 *
* *
* USER ID: [ LZ0 + LND ] *
****************************************************
1. STAAD SPACE
INPUT FILE: Tanque.STD
2. START JOB INFORMATION
3. ENGINEER DATE 06-MAR-12
4. END JOB INFORMATION
5. INPUT WIDTH 79
6. UNIT CM KG
7. JOINT COORDINATES
8. 44 320 140 -320; 45 546.274 140 -226.274; 46 640 140 0; 47 546.274 140 226.274
9. 48 93.726 140 -226.274; 49 0 140 0; 50 93.726 140 226.274; 51 320 140 320
10. 60 433.137 140 -273.137; 61 593.137 140 -113.137; 62 593.137 140 113.137
11. 63 433.137 140 273.137; 64 206.863 140 273.137; 65 46.863 140 113.137
12. 66 46.863 140 -113.137; 67 206.863 140 -273.137; 68 320 0 -320
13. 69 546.274 0 -226.274; 70 640 0 0; 71 546.274 0 226.274; 72 93.726 0 -226.274
14. 73 0 0 0; 74 93.726 0 226.274; 75 320 0 320; 85 320 250 -320
15. 86 546.274 250 -226.274; 87 640 250 0; 88 546.274 250 226.274
16. 89 93.726 250 -226.274; 90 0 250 0; 91 93.726 250 226.274; 92 320 250 320
17. 101 433.137 250 -273.137; 102 593.137 250 -113.137; 103 593.137 250 113.137
18. 104 433.137 250 273.137; 105 206.863 250 273.137; 106 46.863 250 113.137
19. 107 46.863 250 -113.137; 108 206.863 250 -273.137; 118 320 400 -320
20. 119 546.274 400 -226.274; 120 640 400 0; 121 546.274 400 226.274
21. 122 93.726 400 -226.274; 123 0 400 0; 124 93.726 400 226.274; 125 320 400 320
22. 134 433.137 400 -273.137; 135 593.137 400 -113.137; 136 593.137 400 113.137
23. 137 433.137 400 273.137; 138 206.863 400 273.137; 139 46.863 400 113.137
24. 140 46.863 400 -113.137; 141 206.863 400 -273.137; 151 320 800 -320
25. 152 546.274 800 -226.274; 153 640 800 0; 154 546.274 800 226.274
26. 155 93.726 800 -226.274; 156 0 800 0; 157 93.726 800 226.274; 158 320 800 320
27. 167 433.137 800 -273.137; 168 593.137 800 -113.137; 169 593.137 800 113.137
28. 170 433.137 800 273.137; 171 206.863 800 273.137; 172 46.863 800 113.137
29. 173 46.863 800 -113.137; 174 206.863 800 -273.137; 175 206.863 600 273.137
30. 176 593.137 600 113.137; 177 433.137 600 -273.137; 178 46.863 600 -113.137
31. 188 320 1200 -320; 189 546.274 1200 -226.274; 190 640 1200 0
32. 191 546.274 1200 226.274; 192 93.726 1200 -226.274; 193 0 1200 0
33. 194 93.726 1200 226.274; 195 320 1200 320; 204 433.137 1200 -273.137
34. 205 593.137 1200 -113.137; 206 593.137 1200 113.137; 207 433.137 1200 273.137
35. 208 206.863 1200 273.137; 209 46.863 1200 113.137; 210 46.863 1200 -113.137
36. 211 206.863 1200 -273.137; 212 320 1600 0; 213 320 1600 -160
37. 214 433.137 1600 -113.137; 215 480 1600 0; 216 433.137 1600 113.137
38. 217 206.863 1600 -113.137; 218 160 1600 0; 219 206.863 1600 113.137
39. 220 320 1600 160; 221 320 1600 -320; 222 546.274 1600 -226.274; 223 640 1600 0
40. 224 546.274 1600 226.274; 225 93.726 1600 -226.274; 226 0 1600 0
C:\Documents and Settings\Juan\Escritorio\Stand pipe\Tanque.anl Page 1 of 45

Friday, March 09, 2012, 03:47 AM


STAAD SPACE -- PAGE NO. 2
41. 227 93.726 1600 226.274; 228 320 1600 320; 229 263.432 1600 -136.568
42. 230 376.569 1600 -136.568; 231 456.569 1600 -56.5685; 232 456.569 1600 56.5685
43. 233 376.569 1600 136.568; 234 263.432 1600 136.568; 235 183.432 1600 56.5685
44. 236 183.432 1600 -56.5685; 237 433.137 1600 -273.137
45. 238 593.137 1600 -113.137; 239 593.137 1600 113.137; 240 433.137 1600 273.137
46. 241 206.863 1600 273.137; 242 46.863 1600 113.137; 243 46.863 1600 -113.137
47. 244 206.863 1600 -273.137; 245 206.863 1400 273.137; 246 593.137 1400 113.137
48. 247 433.137 1400 -273.137; 248 46.863 1400 -113.137; 249 46.863 1000 113.137

ANALISIS ESTRUCTURAL-PROYECTO DE READECUACION DE SATAND PIPE-MARZO 9 PUEBLA,PUE.

INGENIERO CIVIL
C. PRF. 1 734 741

49.
50.
51.
52.
53.
54.
55.
56.
57.
58.
59.
60.
61.
62.
63.
64.
65.
66.
67.
68.
69.
70.
71.
72.
73.
74.
75.
76.
77.
78.
79.
80.
81.
82.
83.
84.
85.
86.
87.
88.
89.
90.
91.
92.
93.
94.
95.
96.

VICTOR ALFONSO LOPEZ ORTEGA

ARQUITECTO
DRO. No. 301

2012

250 433.137 1000 273.137; 251 593.137 1000 -113.137; 252 206.863 1000 -273.137
262 320 1950 -320; 263 546.274 1950 -226.274; 264 640 1950 0
265 546.274 1950 226.274; 266 93.726 1950 -226.274; 267 0 1950 0
268 93.726 1950 226.274; 269 320 1950 320; 278 433.137 1950 -273.137
279 593.137 1950 -113.137; 280 593.137 1950 113.137; 281 433.137 1950 273.137
282 206.863 1950 273.137; 283 46.863 1950 113.137; 284 46.863 1950 -113.137
285 206.863 1950 -273.137; 286 320 2300 0; 287 320 2300 -160
288 433.137 2300 -113.137; 289 480 2300 0; 290 433.137 2300 113.137
291 206.863 2300 -113.137; 292 160 2300 0; 293 206.863 2300 113.137
294 320 2300 160; 295 320 2300 -320; 296 546.274 2300 -226.274; 297 640 2300 0
298 546.274 2300 226.274; 299 93.726 2300 -226.274; 300 0 2300 0
301 93.726 2300 226.274; 302 320 2300 320; 303 263.432 2300 -136.568
304 376.569 2300 -136.568; 305 456.569 2300 -56.5685; 306 456.569 2300 56.5685
307 376.569 2300 136.568; 308 263.432 2300 136.568; 309 183.432 2300 56.5685
310 183.432 2300 -56.5685; 311 433.137 2300 -273.137
312 593.137 2300 -113.137; 313 593.137 2300 113.137; 314 433.137 2300 273.137
315 206.863 2300 273.137; 316 46.863 2300 113.137; 317 46.863 2300 -113.137
318 206.863 2300 -273.137; 319 46.863 1775 113.137; 320 433.137 1775 273.137
321 593.137 1775 -113.137; 322 206.863 1775 -273.137; 323 206.863 2125 273.137
324 593.137 2125 113.137; 325 433.137 2125 -273.137; 326 46.863 2125 -113.137
327 376.569 1300 -296.568; 328 160 1400 0; 329 206.863 1400 113.137
330 320 1400 160; 331 433.137 1400 113.137; 332 480 1400 0
333 433.137 1400 -113.137; 334 206.863 1400 -113.137; 335 320 1400 -160
MEMBER INCIDENCES
84 44 60; 85 45 61; 86 46 62; 87 47 63; 88 51 64; 89 50 65; 90 49 66; 99 60 45
100 61 46; 101 62 47; 102 63 51; 103 64 50; 104 65 49; 105 66 48; 106 48 67
107 67 44; 116 50 74; 117 51 75; 118 47 71; 119 46 70; 120 45 69; 121 44 68
122 48 72; 123 49 73; 148 85 101; 149 86 102; 150 87 103; 151 88 104
152 92 105; 153 91 106; 154 90 107; 163 101 86; 164 102 87; 165 103 88
166 104 92; 167 105 91; 168 106 90; 169 107 89; 170 89 108; 171 108 85
180 49 90; 181 48 89; 182 51 92; 183 47 88; 184 50 91; 185 44 85; 186 46 87
187 45 86; 212 118 134; 213 119 135; 214 120 136; 215 121 137; 216 125 138
217 124 139; 218 123 140; 227 134 119; 228 135 120; 229 136 121; 230 137 125
231 138 124; 232 139 123; 233 140 122; 234 122 141; 235 141 118; 244 86 119
245 87 120; 246 88 121; 247 92 125; 248 91 124; 249 90 123; 250 89 122
251 85 118; 276 151 167; 277 152 168; 278 153 169; 279 154 170; 280 158 171
281 157 172; 282 156 173; 291 167 152; 292 168 153; 293 169 154; 294 170 158
295 171 157; 296 172 156; 297 173 155; 298 155 174; 299 174 151; 308 122 155
309 123 156; 310 124 157; 311 125 158; 312 121 154; 313 120 153; 314 119 152
315 118 151; 316 124 175; 317 175 158; 318 157 175; 319 175 125; 320 153 176
321 176 121; 322 154 176; 323 176 120; 324 151 177; 325 177 119; 326 152 177
327 177 118; 328 155 178; 329 178 123; 330 156 178; 331 178 122; 356 188 204
357 189 205; 358 190 206; 359 191 207; 360 195 208; 361 194 209; 362 193 210
371 204 189; 372 205 190; 373 206 191; 374 207 195; 375 208 194; 376 209 193
377 210 192; 378 192 211; 379 211 188; 388 155 192; 389 156 193; 390 157 194
391 158 195; 392 154 191; 393 153 190; 394 152 189; 395 151 188; 396 212 213
397 212 214; 398 212 215; 399 212 216; 400 212 217; 401 212 218; 402 212 219
403 212 220; 404 213 221; 405 214 222; 406 215 223; 407 216 224; 408 217 225

C:\Documents and Settings\Juan\Escritorio\Stand pipe\Tanque.anl Page 2 of 45

Friday, March 09, 2012, 03:47 AM


STAAD SPACE -- PAGE NO. 3
97. 409 218 226; 410 219 227; 411 220 228; 412 217 229; 413 213 230; 414 214 231
98. 415 215 232; 416 216 233; 417 220 234; 418 219 235; 419 218 236; 420 221 237
99. 421 222 238; 422 223 239; 423 224 240; 424 228 241; 425 227 242; 426 226 243
100. 427 229 213; 428 230 214; 429 231 215; 430 232 216; 431 233 220; 432 234 219
101. 433 235 218; 434 236 217; 435 237 222; 436 238 223; 437 239 224; 438 240 228
102. 439 241 227; 440 242 226; 441 243 225; 442 225 244; 443 244 221; 444 229 244
103. 445 230 237; 446 231 238; 447 232 239; 448 236 243; 449 235 242; 450 234 241
104. 451 233 240; 452 192 225; 453 193 226; 454 194 227; 455 195 228; 456 191 224
105. 457 190 223; 458 189 222; 459 188 221; 460 194 245; 461 245 228; 462 227 245
106. 463 245 195; 464 223 246; 465 246 191; 466 224 246; 467 246 190; 468 221 247
107. 469 247 189; 470 222 247; 471 247 327; 472 225 248; 473 248 193; 474 226 248
108. 475 248 192; 476 157 249; 477 249 193; 478 156 249; 479 249 194; 480 158 250
109. 481 250 191; 482 154 250; 483 250 195; 484 152 251; 485 251 190; 486 153 251
110. 487 251 189; 488 155 252; 489 252 188; 490 151 252; 491 252 192; 492 90 124
111. 493 123 91; 494 92 121; 495 125 88; 496 86 120; 497 119 87; 498 118 89

ANALISIS ESTRUCTURAL-PROYECTO DE READECUACION DE SATAND PIPE-MARZO 9 PUEBLA,PUE.

10

INGENIERO CIVIL
C. PRF. 1 734 741

112.
113.
114.
115.
116.
117.
118.
119.
120.
121.
122.
123.
124.
125.
126.
127.
128.
129.
130.
131.
132.
133.
134.
135.
136.
137.
138.
139.
140.
141.
142.
143.
144.
145.
146.
147.
148.
149.
150.
151.
152.

VICTOR ALFONSO LOPEZ ORTEGA

ARQUITECTO
DRO. No. 301

2012

499 122 85; 500 91 51; 501 50 92; 502 89 49; 503 48 90; 504 47 87; 505 46 88
506 51 71; 507 75 47; 508 74 49; 509 73 50; 510 72 44; 511 48 68; 512 45 70
513 69 46; 514 85 45; 515 44 86; 540 262 278; 541 263 279; 542 264 280
543 265 281; 544 269 282; 545 268 283; 546 267 284; 555 278 263; 556 279 264
557 280 265; 558 281 269; 559 282 268; 560 283 267; 561 284 266; 562 266 285
563 285 262; 572 286 287; 573 286 288; 574 286 289; 575 286 290; 576 286 291
577 286 292; 578 286 293; 579 286 294; 580 287 295; 581 288 296; 582 289 297
583 290 298; 584 291 299; 585 292 300; 586 293 301; 587 294 302; 588 291 303
589 287 304; 590 288 305; 591 289 306; 592 290 307; 593 294 308; 594 293 309
595 292 310; 596 295 311; 597 296 312; 598 297 313; 599 298 314; 600 302 315
601 301 316; 602 300 317; 603 303 287; 604 304 288; 605 305 289; 606 306 290
607 307 294; 608 308 293; 609 309 292; 610 310 291; 611 311 296; 612 312 297
613 313 298; 614 314 302; 615 315 301; 616 316 300; 617 317 299; 618 299 318
619 318 295; 620 303 318; 621 304 311; 622 305 312; 623 306 313; 624 310 317
625 309 316; 626 308 315; 627 307 314; 628 225 266; 629 226 267; 630 227 268
631 228 269; 632 224 265; 633 223 264; 634 222 263; 635 221 262; 636 266 299
637 267 300; 638 268 301; 639 269 302; 640 265 298; 641 264 297; 642 263 296
643 262 295; 644 227 319; 645 319 267; 646 226 319; 647 319 268; 648 228 320
649 320 265; 650 269 320; 651 320 224; 652 223 321; 653 321 263; 654 222 321
655 321 264; 656 221 322; 657 322 266; 658 225 322; 659 322 262; 660 268 323
661 323 302; 662 301 323; 663 323 269; 664 265 324; 665 324 297; 666 264 324
667 324 298; 668 263 325; 669 325 295; 670 262 325; 671 325 296; 672 267 326
673 326 299; 674 266 326; 675 326 300; 676 193 328; 677 194 329; 678 195 330
679 191 331; 680 190 332; 681 189 333; 682 192 334; 683 327 188; 684 328 212
685 329 212; 686 330 212; 687 331 212; 688 332 212; 689 333 212; 690 334 212
691 188 335; 692 335 212; 693 334 335; 694 335 333; 695 333 332; 696 332 331
697 331 330; 698 330 329; 699 329 328; 700 328 334
DEFINE MATERIAL START
ISOTROPIC STEEL
E 2.09042E+006
POISSON 0.3
DENSITY 0.00783341
ALPHA 1.2E-005
DAMP 0.03
END DEFINE MATERIAL
MEMBER PROPERTY AMERICAN
84 TO 90 99 TO 107 148 TO 154 163 TO 171 212 TO 218 227 TO 235 276 TO 282 291 TO 299 356 TO 362 371 TO 379 396 TO 451 540 TO 546 555 TO 563 572 TO 627 TAPERED 70 1.27 70 25 1.27 25 0.64
116 TO 123 180 TO 187 244 TO 251 308 TO 315 388 TO 395 452 TO 459 628 TO 642 643 TAPERED 50 0.64 50 25 0.64 25 0.64

C:\Documents and Settings\Juan\Escritorio\Stand pipe\Tanque.anl Page 3 of 45

Friday, March 09, 2012, 03:47 AM


STAAD SPACE -- PAGE NO. 4
153. 316 TO 331 460 TO 515 644 TO 700 TABLE ST HSST4X4X0.25
154. CONSTANTS
155. BETA 90 MEMB 84 TO 90 99 TO 107 117 121 148 TO 154 163 TO 171 182 185 212 156. 213 TO 218 227 TO 235 247 251 276 TO 282 291 TO 299 311 315 356 TO 362 371 157. 372 TO 379 391 395 420 TO 426 435 TO 443 455 459 540 TO 546 555 TO 563 572 158. 573 TO 627 631 635 639 643
159. BETA 45 MEMB 118 122 184 187 244 248 310 314 390 394 454 458 630 634 638 642
160. BETA 315 MEMB 116 120 181 183 246 250 308 312 388 392 452 456 628 632 636 640
161. BETA 180 MEMB 396 TO 419 427 TO 434 444 TO 451
162. MATERIAL STEEL MEMB 84 TO 90 99 TO 107 116 TO 123 148 TO 154 163 TO 171 180 163. 181 TO 187 212 TO 218 227 TO 235 244 TO 251 276 TO 282 291 TO 299 308 TO 331 164. 356 TO 362 371 TO 379 388 TO 515 540 TO 546 555 TO 563 572 TO 700
165. SUPPORTS
166. 68 TO 75 FIXED
167. LOAD 1 LOADTYPE DEAD TITLE WD
168. SELFWEIGHT Y -1
169. MEMBER LOAD
170. 404 TO 419 427 TO 434 444 TO 451 UNI GY -75
171. 396 TO 403 LIN Y 0 -75
172. LOAD 2 LOADTYPE SEISMIC TITLE SISMO
173. JOINT LOAD
174. 123 FX 1954

ANALISIS ESTRUCTURAL-PROYECTO DE READECUACION DE SATAND PIPE-MARZO 9 PUEBLA,PUE.

11

INGENIERO CIVIL
C. PRF. 1 734 741

VICTOR ALFONSO LOPEZ ORTEGA

ARQUITECTO
DRO. No. 301

2012

175. 156 FX 3907


176. 193 FX 5854
177. 226 FX 7810
178. 267 FX 8337
179. 300 FX 9834
180. LOAD COMB 3 COMBINATION WD-SISMO
181. 1 1.0 2 1.0
182. PERFORM ANALYSIS PRINT STATICS CHECK
P R O B L E M S T A T I S T I C S
----------------------------------NUMBER OF JOINTS/MEMBER+ELEMENTS/SUPPORTS = 199/ 401/ 8
ORIGINAL/FINAL BAND-WIDTH= 122/ 36/ 210 DOF
TOTAL PRIMARY LOAD CASES = 2, TOTAL DEGREES OF FREEDOM = 1146
SIZE OF STIFFNESS MATRIX = 241 DOUBLE KILO-WORDS
REQRD/AVAIL. DISK SPACE = 15.2/ 205065.5 MB
C:\Documents and Settings\Juan\Escritorio\Stand pipe\Tanque.anl Page 4 of 45

Friday, March 09, 2012, 03:47 AM


STAAD SPACE -- PAGE NO. 5
STATIC LOAD/REACTION/EQUILIBRIUM SUMMARY FOR CASE NO. 1
LOADTYPE DEAD TITLE WD
***TOTAL APPLIED LOAD ( KG CM ) SUMMARY (LOADING 1 )
SUMMATION FORCE-X = 0.00
SUMMATION FORCE-Y = -250772.94
SUMMATION FORCE-Z = 0.00
SUMMATION OF MOMENTS AROUND THE ORIGINMX=
0.01 MY= 0.00 MZ= -80247338.23
***TOTAL REACTION LOAD( KG CM ) SUMMARY (LOADING 1 )
SUMMATION FORCE-X = 0.00
SUMMATION FORCE-Y = 250772.94
SUMMATION FORCE-Z = 0.00
SUMMATION OF MOMENTS AROUND THE ORIGINMX=
0.00 MY= 0.05 MZ= 80247338.84
MAXIMUM DISPLACEMENTS ( CM /RADIANS) (LOADING 1)
MAXIMUMS AT NODE
X = 3.57726E-02 246
Y = -4.42925E-01 286
Z = 3.57721E-02 245
RX= 5.84667E-04 311
RY= 3.58541E-05 327
RZ= 5.84667E-04 313
STATIC LOAD/REACTION/EQUILIBRIUM SUMMARY FOR CASE NO. 2
LOADTYPE SEISMIC TITLE SISMO
***TOTAL APPLIED LOAD ( KG CM ) SUMMARY (LOADING 2 )
SUMMATION FORCE-X = 37696.00
SUMMATION FORCE-Y = 0.00
SUMMATION FORCE-Z = 0.00
SUMMATION OF MOMENTS AROUND THE ORIGINMX=
0.00 MY= 0.00 MZ= -62303348.10
***TOTAL REACTION LOAD( KG CM ) SUMMARY (LOADING 2 )
SUMMATION FORCE-X = -37696.00
SUMMATION FORCE-Y = 0.00
SUMMATION FORCE-Z = 0.00
SUMMATION OF MOMENTS AROUND THE ORIGINMX=
-0.16 MY= -0.03 MZ= 62303347.05
C:\Documents and Settings\Juan\Escritorio\Stand pipe\Tanque.anl Page 5 of 45

Friday, March 09, 2012, 03:47 AM


STAAD SPACE -- PAGE NO. 6
MAXIMUM DISPLACEMENTS ( CM /RADIANS) (LOADING 2)
MAXIMUMS AT NODE
X = 2.76254E+00 300
Y = -3.00518E-01 297
Z = -4.68601E-02 151
RX= 3.76512E-04 155
RY= 2.30297E-04 174
RZ= -1.65930E-03 251
************ END OF DATA FROM INTERNAL STORAGE ************

ANALISIS ESTRUCTURAL-PROYECTO DE READECUACION DE SATAND PIPE-MARZO 9 PUEBLA,PUE.

12

INGENIERO CIVIL
C. PRF. 1 734 741

183.
184.
185.
186.
187.
188.

VICTOR ALFONSO LOPEZ ORTEGA

ARQUITECTO
DRO. No. 301

2012

PARAMETER
CODE AISC
FYLD 3515 ALL
SSY 0 ALL
SSZ 0 ALL
CHECK CODE ALL

C:\Documents and Settings\Juan\Escritorio\Stand pipe\Tanque.anl Page 6 of 45

Friday, March 09, 2012, 03:47 AM


STAAD SPACE -- PAGE NO. 7
STAAD.PRO CODE CHECKING - (AISC 9TH EDITION)
********************************************
ALL UNITS ARE - KG CM (UNLESS OTHERWISE NOTED)
MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/
FX MY MZ LOCATION
=======================================================================
84 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.111 2
1238.13 T -32877.93 138738.45 0.00
85 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.060 2
1557.30 C -13662.68 -101881.29 0.00
86 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.066 3
4128.01 T 21299.57 3693.36 0.00
87 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.144 3
1134.79 T 50251.60 101708.16 0.00
88 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.124 3
44.66 T 38738.63 -152657.27 0.00
89 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.083 3
3688.86 T 20417.63 103711.59 0.00
90 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.055 2
2954.65 C -17374.42 8981.24 0.00
99 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.125 3
2450.58 T 39996.06 -104196.80 122.46
100 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.067 3
350.49 T 27056.64 6143.42 122.46
101 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.058 2
2915.56 T -11302.47 100569.52 122.46
102 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.132 2
773.00 C -41140.39 -151784.80 122.46
103 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.112 2
1167.79 C -35878.88 105947.60 122.46
104 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.061 2
1781.07 T -22533.26 6588.72 122.46
105 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.068 3
1742.20 C 17066.75 -101201.77 122.46
C:\Documents and Settings\Juan\Escritorio\Stand pipe\Tanque.anl Page 7 of 45

Friday, March 09, 2012, 03:47 AM


STAAD SPACE -- PAGE NO. 8
ALL UNITS ARE - KG CM (UNLESS OTHERWISE NOTED)
MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/
FX MY MZ LOCATION
=======================================================================
106 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.131 2

ANALISIS ESTRUCTURAL-PROYECTO DE READECUACION DE SATAND PIPE-MARZO 9 PUEBLA,PUE.

13

INGENIERO CIVIL
C. PRF. 1 734 741

VICTOR ALFONSO LOPEZ ORTEGA

ARQUITECTO
DRO. No. 301

2012

576.40 T -45196.93 -102298.84 0.00


107 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.151 3
2484.20 T 47936.61 137938.67 122.46
116 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.528 2
31960.36 T 35810.32 -348262.88 140.00
117 TAP ERED (AISC SECTIONS)
PASS AISC- H1-2 0.445 3
31546.43 C -46823.64 -90667.05 140.00
118 TAP ERED (AISC SECTIONS)
PASS AISC- H1-1 0.690 3
60326.35 C -29446.57 -257987.16 140.00
119 TAP ERED (AISC SECTIONS)
PASS AISC- H1-1 0.786 3
74002.65 C -4030.74 -424650.47 140.00
120 TAP ERED (AISC SECTIONS)
PASS AISC- H1-1 0.765 3
62206.95 C 35532.75 -358303.84 140.00
121 TAP ERED (AISC SECTIONS)
PASS AISC- H1-2 0.407 3
29135.70 C -45941.95 -54260.31 140.00
122 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.449 2
30433.84 T -30378.39 -244065.16 140.00
123 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.543 2
44285.48 T -4064.97 -423886.25 140.00
148 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.132 2
1239.38 C -37296.22 -185838.75 0.00
149 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.074 2
4563.67 T -14018.14 116811.66 0.00
150 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.068 3
1055.57 C 25361.31 17042.09 0.00
151 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.155 3
4127.42 T 49007.13 -117313.37 0.00
152 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.146 3
2388.17 T 45382.94 144948.92 0.00
C:\Documents and Settings\Juan\Escritorio\Stand pipe\Tanque.anl Page 8 of 45

Friday, March 09, 2012, 03:47 AM


STAAD SPACE -- PAGE NO. 9
ALL UNITS ARE - KG CM (UNLESS OTHERWISE NOTED)
MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/
FX MY MZ LOCATION
=======================================================================
153 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.083 3
2500.89 C 20166.66 -120278.34 0.00
154 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.070 2
2837.83 T -22630.46 30518.49 0.00
163 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.136 3
266.32 T 46493.14 118150.37 122.46
164 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.087 3
6757.35 T 25474.99 14663.78 122.46
165 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.062 2
2561.26 C -11733.02 -115188.49 122.46
166 TAP ERED (AISC SECTIONS)

ANALISIS ESTRUCTURAL-PROYECTO DE READECUACION DE SATAND PIPE-MARZO 9 PUEBLA,PUE.

14

INGENIERO CIVIL
C. PRF. 1 734 741

VICTOR ALFONSO LOPEZ ORTEGA

ARQUITECTO
DRO. No. 301

2012

PASS AISC- H2-1 0.135 2


1933.73 T -41164.84 145388.50 122.46
167 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.130 2
882.47 T -42759.80 -121813.60 122.46
168 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.079 2
4694.58 C -22754.83 32928.09 122.46
169 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.087 3
4343.53 T 20303.24 112219.73 122.46
170 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.138 2
1828.99 C -45310.95 114236.77 0.00
171 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.153 3
364.70 T 47482.93 -186475.88 122.46
180 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.402 2
41948.98 T 7336.69 131444.77 0.00
181 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.433 2
27899.92 T -40770.87 169468.80 0.00
182 TAP ERED (AISC SECTIONS)
PASS AISC- H1-2 0.481 3
32976.33 C -40389.31 -195818.84 110.00
183 TAP ERED (AISC SECTIONS)
PASS AISC- H1-1 0.650 3
57947.90 C -38924.32 164775.14 0.00
C:\Documents and Settings\Juan\Escritorio\Stand pipe\Tanque.anl Page 9 of 45

Friday, March 09, 2012, 03:47 AM


STAAD SPACE -- PAGE NO. 10
ALL UNITS ARE - KG CM (UNLESS OTHERWISE NOTED)
MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/
FX MY MZ LOCATION
=======================================================================
184 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.397 2
31320.89 T -23438.58 169352.27 110.00
185 TAP ERED (AISC SECTIONS)
PASS AISC- H1-2 0.447 3
27835.85 C -42849.66 -184940.86 110.00
186 TAP ERED (AISC SECTIONS)
PASS AISC- H1-1 0.640 3
72008.56 C 6112.81 114108.76 0.00
187 TAP ERED (AISC SECTIONS)
PASS AISC- H1-1 0.621 3
61733.46 C -21356.33 154373.62 110.00
212 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.159 2
3041.04 T -34439.39 319611.19 0.00
213 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.078 2
175.76 C -11190.29 -244482.58 0.00
214 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.105 3
10737.24 T 25311.04 32117.75 0.00
215 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.172 3
1612.30 T 48034.70 251643.19 0.00
216 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.188 2
3529.34 C 37347.92 -413692.28 0.00
217 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.101 3
2155.04 T 18468.89 238407.44 0.00

ANALISIS ESTRUCTURAL-PROYECTO DE READECUACION DE SATAND PIPE-MARZO 9 PUEBLA,PUE.

15

INGENIERO CIVIL
C. PRF. 1 734 741

VICTOR ALFONSO LOPEZ ORTEGA

ARQUITECTO
DRO. No. 301

2012

218 TAP ERED (AISC SECTIONS)


PASS AISC- H1-3 0.116 2
8280.44 C -24606.75 121659.39 0.00
227 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.178 3
6195.34 T 44382.61 -244779.73 122.46
228 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.078 3
1921.08 T 27145.60 33669.76 122.46
229 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.100 2
7582.94 T -8879.55 249649.50 122.46
230 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.177 2
484.54 C -37549.09 -414768.84 122.46
C:\Documents and Settings\Juan\Escritorio\Stand pipe\Tanque.anl Page 10 of 45

Friday, March 09, 2012, 03:47 AM


STAAD SPACE -- PAGE NO. 11
ALL UNITS ARE - KG CM (UNLESS OTHERWISE NOTED)
MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/
FX MY MZ LOCATION
=======================================================================
231 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.163 2
3529.34 C -41927.32 238809.19 122.46
232 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.082 2
58.20 T -23761.80 119982.32 122.46
233 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.124 2
8280.44 C 12226.25 -303407.34 122.46
234 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.168 2
562.62 C -43125.79 -305293.03 0.00
235 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.179 3
1534.22 T 44980.83 320915.78 122.46
244 TAP ERED (AISC SECTIONS)
PASS AISC- H1-1 0.646 3
58322.78 C 29856.73 170153.69 0.00
245 TAP ERED (AISC SECTIONS)
PASS AISC- H1-1 0.610 3
66537.23 C 5793.40 107200.00 150.00
246 TAP ERED (AISC SECTIONS)
PASS AISC- H1-1 0.559 3
52960.44 C 17970.47 161530.50 150.00
247 TAP ERED (AISC SECTIONS)
PASS AISC- H1-2 0.476 3
32916.84 C 38181.66 -200914.34 0.00
248 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.416 2
28952.17 T 32355.38 180351.44 0.00
249 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.350 2
37284.43 T 6757.12 100527.44 150.00
250 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.340 2
23982.25 T 21866.71 178867.73 150.00
251 TAP ERED (AISC SECTIONS)
PASS AISC- H1-2 0.409 3
25665.57 C 37585.88 -178853.25 0.00
276 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.194 2
518.07 C -32159.79 -552759.88 0.00
277 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.114 3

ANALISIS ESTRUCTURAL-PROYECTO DE READECUACION DE SATAND PIPE-MARZO 9 PUEBLA,PUE.

16

INGENIERO CIVIL
C. PRF. 1 734 741

VICTOR ALFONSO LOPEZ ORTEGA

ARQUITECTO
DRO. No. 301

2012

8672.53 T -5918.35 331824.97 0.00


C:\Documents and Settings\Juan\Escritorio\Stand pipe\Tanque.anl Page 11 of 45

Friday, March 09, 2012, 03:47 AM


STAAD SPACE -- PAGE NO. 12
ALL UNITS ARE - KG CM (UNLESS OTHERWISE NOTED)
MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/
FX MY MZ LOCATION
=======================================================================
278 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.102 3
2944.48 T 31462.63 82183.23 0.00
279 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.200 3
4797.70 T 51000.18 -296787.12 0.00
280 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.172 3
1875.10 T 39193.38 344984.38 0.00
281 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.137 2
6743.31 C 11141.93 -402940.66 0.00
282 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.123 2
842.69 C -27952.93 256551.67 0.00
291 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.190 3
2478.63 T 47072.91 332329.06 122.46
292 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.119 3
8672.53 T 29868.32 81743.97 122.46
293 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.076 3
2944.48 T 1596.34 -296679.75 122.46
294 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.174 3
4797.70 T -35700.04 344744.84 122.46
295 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.188 2
1121.61 C -42047.53 -403493.78 122.46
296 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.145 2
6743.31 C -27463.72 256954.28 122.46
297 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.090 3
2154.02 T -13127.53 246680.39 0.00
298 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.174 2
3459.08 C -46752.77 236992.67 0.00
299 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.225 2
3459.08 C 40720.20 -552481.75 122.46
308 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.342 2
19855.83 T -26633.39 189734.88 0.00
C:\Documents and Settings\Juan\Escritorio\Stand pipe\Tanque.anl Page 12 of 45

Friday, March 09, 2012, 03:47 AM


STAAD SPACE -- PAGE NO. 13
ALL UNITS ARE - KG CM (UNLESS OTHERWISE NOTED)
MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/
FX MY MZ LOCATION
=======================================================================
309 TAP ERED (AISC SECTIONS)
PASS AISC- H1-1 0.289 1
24791.97 C 499.05 6812.51 400.00
310 TAP ERED (AISC SECTIONS)
PASS AISC- H1-1 0.289 1
24791.97 C -499.04 6812.45 400.00

ANALISIS ESTRUCTURAL-PROYECTO DE READECUACION DE SATAND PIPE-MARZO 9 PUEBLA,PUE.

17

INGENIERO CIVIL
C. PRF. 1 734 741

VICTOR ALFONSO LOPEZ ORTEGA

311 TAP ERED (AISC SECTIONS)


PASS AISC- H1-1 0.456 3
23417.79 C 34077.85 128238.52 0.00
312 TAP ERED (AISC SECTIONS)
PASS AISC- H1-1 0.718 3
44329.88 C -25916.77 178199.80 0.00
313 TAP ERED (AISC SECTIONS)
PASS AISC- H1-1 0.667 3
51586.81 C 3084.65 127528.34 0.00
314 TAP ERED (AISC SECTIONS)
PASS AISC- H1-1 0.606 3
42733.26 C -18040.92 61239.65 400.00
315 TAP ERED (AISC SECTIONS)
PASS AISC- H1-1 0.490 3
25981.59 C 34014.50 129724.63 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD
316 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H2-1 0.415 2
17515.13 T -2474.89 2135.46 234.51
***NOTE: DESIGN IN ACCORDANCE WITH ASD
317 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H2-1 0.429 2
17497.26 T 3496.77 -3237.99 234.51
***NOTE: DESIGN IN ACCORDANCE WITH ASD
318 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.580 3
18947.46 C -2735.05 1103.25 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD
319 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.591 3
19060.82 C -4271.23 -822.19 234.51
***NOTE: DESIGN IN ACCORDANCE WITH ASD
320 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.188 1
6087.78 C 29.86 1845.05 234.51
***NOTE: DESIGN IN ACCORDANCE WITH ASD
321 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.227 3
5721.84 C -3818.51 5518.82 234.51
***NOTE: DESIGN IN ACCORDANCE WITH ASD

ARQUITECTO
DRO. No. 301

2012

18
PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

C:\Documents and Settings\Juan\Escritorio\Stand pipe\Tanque.anl Page 13 of 45

Friday, March 09, 2012, 03:47 AM


STAAD SPACE -- PAGE NO. 14
ALL UNITS ARE - KG CM (UNLESS OTHERWISE NOTED)
MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/
FX MY MZ LOCATION
=======================================================================
322 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.547 3
17620.74 C -2868.83 1691.75 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR TUBES***
323 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.561 3
17693.03 C 1509.63 4364.14 234.51
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR TUBES***
324 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.725 3
23084.29 C 3998.30 2334.19 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR TUBES***
325 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.721 3
23147.82 C -2315.31 -3244.97 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR TUBES***
326 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H2-1 0.302 2
12395.18 T 2380.48 -1875.04 0.00

ANALISIS ESTRUCTURAL-PROYECTO DE READECUACION DE SATAND PIPE-MARZO 9 PUEBLA,PUE.

INGENIERO CIVIL
C. PRF. 1 734 741

VICTOR ALFONSO LOPEZ ORTEGA

***NOTE: DESIGN IN ACCORDANCE WITH ASD


327 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H2-1 0.320 2
12428.35 T 4078.75 2718.81 234.51
***NOTE: DESIGN IN ACCORDANCE WITH ASD
328 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H2-1 0.301 2
12002.93 T 2792.95 -2705.51 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD
329 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H2-1 0.292 2
11993.80 T -1302.13 2864.49 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD
330 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.216 3
6976.74 C -688.17 -1564.35 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD
331 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.245 3
7087.26 C 4381.34 -1914.14 234.51
356 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.158 3
12660.92 T -28676.80 218943.56 0.00
357 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.111 3
14534.31 T 8304.77 -191464.75 0.00

ARQUITECTO
DRO. No. 301

2012

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

19
PROVISIONS FOR TUBES***

C:\Documents and Settings\Juan\Escritorio\Stand pipe\Tanque.anl Page 14 of 45

Friday, March 09, 2012, 03:47 AM


STAAD SPACE -- PAGE NO. 15
ALL UNITS ARE - KG CM (UNLESS OTHERWISE NOTED)
MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/
FX MY MZ LOCATION
=======================================================================
358 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.128 3
17604.87 T 23090.10 52960.73 0.00
359 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.149 3
11742.02 T 25771.63 222715.78 0.00
360 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.195 3
5780.01 T 40426.64 -375999.25 0.00
361 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.080 3
6271.03 T -7024.83 195608.17 122.46
362 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.132 2
8755.32 C -16782.91 279109.66 0.00
371 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.184 3
12660.92 T 42191.04 -190395.47 122.46
372 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.114 3
14534.31 T 21842.50 53560.72 122.46
373 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.123 3
17604.87 T -6104.90 220657.06 122.46
374 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.129 3
11742.02 T -3933.46 -377452.22 122.46
375 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.127 2
4542.99 C -36129.59 112502.43 122.46
376 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.104 2
4789.19 C -11379.93 278532.78 122.46

ANALISIS ESTRUCTURAL-PROYECTO DE READECUACION DE SATAND PIPE-MARZO 9 PUEBLA,PUE.

INGENIERO CIVIL
C. PRF. 1 734 741

VICTOR ALFONSO LOPEZ ORTEGA

ARQUITECTO
DRO. No. 301

2012

377 TAP ERED (AISC SECTIONS)


PASS AISC- H1-3 0.133 2
8755.32 C 13734.55 -318245.62 122.46
378 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.113 2
3031.44 C -14505.38 -318793.62 0.00
379 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.115 3
8028.78 T 16912.34 220870.83 122.46
388 TAP ERED (AISC SECTIONS)
PASS AISC- H1-1 0.299 1
24472.53 C 380.81 -38066.55 400.00
C:\Documents and Settings\Juan\Escritorio\Stand pipe\Tanque.anl Page 15 of 45

Friday, March 09, 2012, 03:47 AM


STAAD SPACE -- PAGE NO. 16
ALL UNITS ARE - KG CM (UNLESS OTHERWISE NOTED)
MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/
FX MY MZ LOCATION
=======================================================================
389 TAP ERED (AISC SECTIONS)
PASS AISC- H1-1 0.299 1
24472.53 C -380.81 -38066.62 400.00
390 TAP ERED (AISC SECTIONS)
PASS AISC- H1-1 0.331 3
15968.75 C -22637.61 -153982.77 400.00
391 TAP ERED (AISC SECTIONS)
PASS AISC- H1-1 0.358 3
18547.67 C 30387.29 -79569.61 0.00
392 TAP ERED (AISC SECTIONS)
PASS AISC- H1-1 0.593 3
41194.10 C -21071.07 -43620.75 0.00
393 TAP ERED (AISC SECTIONS)
PASS AISC- H1-1 0.532 3
42913.68 C 3165.90 -53956.54 400.00
394 TAP ERED (AISC SECTIONS)
PASS AISC- H1-1 0.520 3
33691.71 C -23071.10 -76787.87 400.00
395 TAP ERED (AISC SECTIONS)
PASS AISC- H1-1 0.513 3
30080.21 C 30661.24 -93154.44 0.00
396 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.207 3
3599.72 T 1040.95 918940.62 160.00
397 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.203 1
418.79 T 109.65 967044.94 160.00
398 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.203 1
418.79 T -109.67 967045.44 160.00
399 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.205 3
3299.02 T -1453.93 911898.06 160.00
400 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.244 3
2078.09 C 6094.38 1061844.25 160.00
401 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.249 3
8013.74 C -1850.38 1017739.94 160.00
402 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.211 3
786.57 T -3560.82 959785.00 160.00
403 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.215 3
135.69 C -1034.97 1016551.06 160.00
C:\Documents and Settings\Juan\Escritorio\Stand pipe\Tanque.anl Page 16 of 45

Friday, March 09, 2012, 03:47 AM

ANALISIS ESTRUCTURAL-PROYECTO DE READECUACION DE SATAND PIPE-MARZO 9 PUEBLA,PUE.

20

INGENIERO CIVIL
C. PRF. 1 734 741

VICTOR ALFONSO LOPEZ ORTEGA

ARQUITECTO
DRO. No. 301

2012

STAAD SPACE -- PAGE NO. 17


ALL UNITS ARE - KG CM (UNLESS OTHERWISE NOTED)
MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/
FX MY MZ LOCATION
=======================================================================
404 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.210 3
3468.35 T 109.12 946888.50 0.00
405 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.210 1
671.58 T -622.77 987818.25 0.00
406 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.210 1
671.57 T 622.80 987816.50 0.00
407 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.210 1
671.57 T -622.83 987818.25 0.00
408 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.249 3
1702.93 C -7741.79 1075005.12 0.00
409 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.261 3
7538.15 C 3493.49 1064668.25 0.00
410 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.221 3
1191.44 T 2729.62 1008624.25 0.00
411 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.215 3
333.36 C 766.95 1017359.38 0.00
412 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.087 3
14.62 T -6582.45 341130.91 61.23
413 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.076 3
34.51 C -2689.78 335536.66 61.23
414 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.077 1
409.40 T -1638.34 341401.84 61.23
415 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.082 3
29.43 C -5966.64 324389.12 61.23
416 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.077 1
409.40 T -1638.43 341408.66 61.23
417 TAP ERED (AISC SECTIONS)
PASS SHEAR -Y 0.079 3
50.60 T 3762.32 399.21 0.00
418 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.100 3
126.31 T 8694.09 376907.25 61.23
C:\Documents and Settings\Juan\Escritorio\Stand pipe\Tanque.anl Page 17 of 45

Friday, March 09, 2012, 03:47 AM


STAAD SPACE -- PAGE NO. 18
ALL UNITS ARE - KG CM (UNLESS OTHERWISE NOTED)
MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/
FX MY MZ LOCATION
=======================================================================
419 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.098 3
343.50 T 9890.38 353553.16 61.23
420 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.441 1
1554.10 T -183719.50 979.10 122.46
421 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.442 3
211.62 T -184648.14 15235.94 122.46

ANALISIS ESTRUCTURAL-PROYECTO DE READECUACION DE SATAND PIPE-MARZO 9 PUEBLA,PUE.

21

INGENIERO CIVIL
C. PRF. 1 734 741

VICTOR ALFONSO LOPEZ ORTEGA

ARQUITECTO
DRO. No. 301

2012

422 TAP ERED (AISC SECTIONS)


PASS AISC- H2-1 0.442 1
1554.10 T -183720.56 979.34 122.46
423 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.442 3
473.13 C -184214.53 13038.61 122.46
424 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.454 3
1457.53 T 186230.61 32081.89 0.00
425 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.446 3
1956.43 C -184233.27 -5815.24 122.46
426 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.445 3
2501.71 T -183235.31 -7710.94 122.46
427 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.077 3
45.12 C -2388.61 341147.03 0.00
428 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.082 3
0.92 T -5265.83 335515.56 0.00
429 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.077 1
409.40 T -1638.35 341401.84 0.00
430 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.079 3
44.72 C -4856.09 324395.12 0.00
431 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.077 1
409.40 T -1638.41 341408.66 0.00
432 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.074 1
428.17 T -606.26 341406.88 0.00
433 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.083 3
226.28 T 1570.39 376900.44 0.00
C:\Documents and Settings\Juan\Escritorio\Stand pipe\Tanque.anl Page 18 of 45

Friday, March 09, 2012, 03:47 AM


STAAD SPACE -- PAGE NO. 19
ALL UNITS ARE - KG CM (UNLESS OTHERWISE NOTED)
MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/
FX MY MZ LOCATION
=======================================================================
434 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.109 3
279.25 T 14435.86 353535.78 0.00
435 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.441 1
1554.10 T -183719.50 979.08 0.00
436 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.442 3
225.83 T -184646.86 16318.00 0.00
437 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.442 1
1554.10 T -183720.56 979.35 0.00
438 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.441 3
512.77 C -184222.83 10012.93 0.00
439 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.443 3
1478.97 T -183618.22 -9879.80 0.00
440 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.448 3
2056.41 C -184240.06 -13470.17 0.00
441 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.444 3

ANALISIS ESTRUCTURAL-PROYECTO DE READECUACION DE SATAND PIPE-MARZO 9 PUEBLA,PUE.

22

INGENIERO CIVIL
C. PRF. 1 734 741

VICTOR ALFONSO LOPEZ ORTEGA

ARQUITECTO
DRO. No. 301

2012

2565.95 T -183252.70 -2759.53 0.00


442 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.445 3
1423.70 C -184029.20 -13554.33 122.46
443 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.444 3
1363.96 C -184013.06 -8916.58 0.00
444 TAP ERED (AISC SECTIONS)
PASS SHEAR -Y 0.056 1
102.13 T 0.01 -493.17 0.00
445 TAP ERED (AISC SECTIONS)
PASS SHEAR -Y 0.056 1
44.50 T 0.01 -479.05 0.00
446 TAP ERED (AISC SECTIONS)
PASS SHEAR -Y 0.056 1
102.14 T 0.01 -480.61 0.00
447 TAP ERED (AISC SECTIONS)
PASS SHEAR -Y 0.056 1
44.50 T 0.00 -470.78 0.00
448 TAP ERED (AISC SECTIONS)
PASS SHEAR -Y 0.056 1
44.49 T 0.00 -481.15 0.00
C:\Documents and Settings\Juan\Escritorio\Stand pipe\Tanque.anl Page 19 of 45

Friday, March 09, 2012, 03:47 AM


STAAD SPACE -- PAGE NO. 20
ALL UNITS ARE - KG CM (UNLESS OTHERWISE NOTED)
MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/
FX MY MZ LOCATION
=======================================================================
449 TAP ERED (AISC SECTIONS)
PASS SHEAR -Y 0.056 1
102.13 T 0.00 -490.97 0.00
450 TAP ERED (AISC SECTIONS)
PASS SHEAR -Y 0.056 1
44.49 T -0.01 -483.34 0.00
451 TAP ERED (AISC SECTIONS)
PASS SHEAR -Y 0.056 1
102.14 T -0.02 -488.88 0.00
452 TAP ERED (AISC SECTIONS)
PASS AISC- H1-1 0.317 1
18464.46 C 195.89 235218.45 400.00
453 TAP ERED (AISC SECTIONS)
PASS AISC- H1-1 0.317 1
18464.46 C -195.83 235218.72 400.00
454 TAP ERED (AISC SECTIONS)
PASS AISC- H1-1 0.317 1
18464.46 C 195.81 235218.48 400.00
455 TAP ERED (AISC SECTIONS)
PASS AISC- H1-1 0.343 3
20890.22 C -5968.68 182609.77 400.00
456 TAP ERED (AISC SECTIONS)
PASS AISC- H1-1 0.385 3
22197.07 C 3721.16 -262542.50 400.00
457 TAP ERED (AISC SECTIONS)
PASS AISC- H1-1 0.420 3
26585.38 C 527.99 -253914.66 400.00
458 TAP ERED (AISC SECTIONS)
PASS AISC- H1-1 0.418 3
26460.00 C -5195.10 -210558.06 400.00
459 TAP ERED (AISC SECTIONS)
PASS AISC- H1-1 0.317 1
18464.45 C 195.96 -235218.77 400.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR TUBES***
460 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H2-1 0.159 2
6049.10 T 1836.53 -1786.90 0.00

ANALISIS ESTRUCTURAL-PROYECTO DE READECUACION DE SATAND PIPE-MARZO 9 PUEBLA,PUE.

23

INGENIERO CIVIL
C. PRF. 1 734 741

VICTOR ALFONSO LOPEZ ORTEGA

ARQUITECTO
DRO. No. 301

2012

***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR TUBES***


461 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-3 0.163 1
4340.08 C -2247.44 -3123.53 234.51
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR TUBES***
462 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.302 3
9457.88 C -2160.60 -2029.29 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR TUBES***
C:\Documents and Settings\Juan\Escritorio\Stand pipe\Tanque.anl Page 20 of 45

Friday, March 09, 2012, 03:47 AM


STAAD SPACE -- PAGE NO. 21
ALL UNITS ARE - KG CM (UNLESS OTHERWISE NOTED)
MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/
FX MY MZ LOCATION
=======================================================================
463 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.306 3
9577.16 C -1470.15 2792.31 234.51
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR TUBES***
464 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-3 0.163 1
4340.09 C 2247.39 -3123.55 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR TUBES***
465 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-3 0.148 1
4427.73 C -625.55 2093.68 234.51
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR TUBES***
466 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.269 3
7995.92 C -2681.72 -2881.03 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR TUBES***
467 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.263 3
8094.94 C -335.99 3824.69 234.51
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR TUBES***
468 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.337 3
10632.12 C 2216.20 -2089.78 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR TUBES***
469 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.349 3
10752.85 C 1590.72 3794.27 234.51
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR TUBES***
470 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-3 0.163 1
4340.09 C -2247.35 -3123.66 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR TUBES***
471 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-3 0.120 1
4393.67 C -963.14 -1133.59 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR TUBES***
472 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-3 0.163 1
4340.09 C -2247.42 -3123.55 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR TUBES***
473 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-3 0.148 1
4427.73 C 625.52 2093.68 234.51
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR TUBES***
474 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-3 0.181 3
5092.97 C 2388.36 -2431.71 0.00
C:\Documents and Settings\Juan\Escritorio\Stand pipe\Tanque.anl Page 21 of 45

Friday, March 09, 2012, 03:47 AM


STAAD SPACE -- PAGE NO. 22

ANALISIS ESTRUCTURAL-PROYECTO DE READECUACION DE SATAND PIPE-MARZO 9 PUEBLA,PUE.

24

INGENIERO CIVIL
C. PRF. 1 734 741

VICTOR ALFONSO LOPEZ ORTEGA

***NOTE: DESIGN IN ACCORDANCE WITH ASD


475 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-3 0.160 3
5194.78 C -7.39 1553.72 234.51
***NOTE: DESIGN IN ACCORDANCE WITH ASD
476 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.271 3
8274.39 C 3599.19 -1376.62 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD
477 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.253 3
8149.51 C -2601.32 213.34 234.51
***NOTE: DESIGN IN ACCORDANCE WITH ASD
478 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H2-1 0.209 2
8417.14 T 210.14 -3301.73 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD
479 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H2-1 0.220 2
8405.67 T 2471.20 -2908.12 234.51
***NOTE: DESIGN IN ACCORDANCE WITH ASD
480 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H2-1 0.302 2
12095.41 T 3883.79 1261.63 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD
481 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H2-1 0.297 2
12028.13 T 960.20 -3723.92 234.51
***NOTE: DESIGN IN ACCORDANCE WITH ASD
482 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.642 3
20425.49 C -1854.13 -3965.87 234.51
***NOTE: DESIGN IN ACCORDANCE WITH ASD
483 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.643 3
20325.34 C 2545.22 4049.08 234.51
***NOTE: DESIGN IN ACCORDANCE WITH ASD
484 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.181 1
5882.19 C 79.42 1592.77 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD
485 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.180 1
5835.65 C -108.28 1793.94 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD
486 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.465 3
14731.70 C 366.87 4597.80 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD
487 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.456 3
14642.86 C -2570.96 2109.01 234.51
***NOTE: DESIGN IN ACCORDANCE WITH ASD
488 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H2-1 0.353 2
14500.39 T 2034.20 3181.51 234.51

ARQUITECTO
DRO. No. 301

2012

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

25
PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

C:\Documents and Settings\Juan\Escritorio\Stand pipe\Tanque.anl Page 22 of 45

Friday, March 09, 2012, 03:47 AM


STAAD SPACE -- PAGE NO. 23
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR TUBES***
489 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H2-1 0.367 2
14442.35 T -2309.45 -4719.34 234.51
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR TUBES***
490 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.550 3

ANALISIS ESTRUCTURAL-PROYECTO DE READECUACION DE SATAND PIPE-MARZO 9 PUEBLA,PUE.

INGENIERO CIVIL
C. PRF. 1 734 741

VICTOR ALFONSO LOPEZ ORTEGA

17652.09 C -4363.81 489.94 0.00


***NOTE: DESIGN IN ACCORDANCE WITH ASD
491 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.536 3
17501.10 C -584.70 3467.27 234.51
***NOTE: DESIGN IN ACCORDANCE WITH ASD
492 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H2-1 0.191 2
7201.70 T -1560.15 -3048.94 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD
493 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-3 0.156 3
4035.40 C -1833.38 1666.87 287.20
***NOTE: DESIGN IN ACCORDANCE WITH ASD
494 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H2-1 0.212 2
8681.80 T -313.85 2692.41 287.20
***NOTE: DESIGN IN ACCORDANCE WITH ASD
495 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.500 3
13587.34 C 1027.93 5687.42 287.20
***NOTE: DESIGN IN ACCORDANCE WITH ASD
496 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-3 0.096 1
2505.11 C -17.28 2259.01 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD
497 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.358 3
9392.13 C -1630.15 5150.16 287.20
***NOTE: DESIGN IN ACCORDANCE WITH ASD
498 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H2-1 0.279 2
11359.01 T -655.68 -3511.14 287.20
***NOTE: DESIGN IN ACCORDANCE WITH ASD
499 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.412 3
11555.33 C 317.63 4274.76 287.20
***NOTE: DESIGN IN ACCORDANCE WITH ASD
500 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.310 3
8818.35 C -453.17 4454.35 268.49
***NOTE: DESIGN IN ACCORDANCE WITH ASD
501 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H2-1 0.230 2
8856.51 T 780.50 4218.14 268.49
***NOTE: DESIGN IN ACCORDANCE WITH ASD
502 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H2-1 0.152 2
5430.57 T -1529.58 -2948.44 268.49

ARQUITECTO
DRO. No. 301

2012

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

C:\Documents and Settings\Juan\Escritorio\Stand pipe\Tanque.anl Page 23 of 45

Friday, March 09, 2012, 03:47 AM


STAAD SPACE -- PAGE NO. 24
***NOTE: DESIGN IN ACCORDANCE WITH ASD
503 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-3 0.117 3
2986.40 C -1505.36 1803.36 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD
504 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-3 0.063 1
1574.83 C -16.00 2100.25 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD
505 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.255 3
6743.90 C -1524.65 4883.65 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD
506 ST HSST4X4X0.25 (AISC SECTIONS)

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

ANALISIS ESTRUCTURAL-PROYECTO DE READECUACION DE SATAND PIPE-MARZO 9 PUEBLA,PUE.

26

INGENIERO CIVIL
C. PRF. 1 734 741

VICTOR ALFONSO LOPEZ ORTEGA

PASS AISC- H1-1 0.386 3


10916.30 C 1578.01 2965.24 282.11
***NOTE: DESIGN IN ACCORDANCE WITH ASD
507 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H2-1 0.141 2
5694.78 T 306.31 1994.72 282.11
***NOTE: DESIGN IN ACCORDANCE WITH ASD
508 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-3 0.094 1
2444.13 C -76.98 2344.13 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD
509 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H2-1 0.167 2
6324.59 T -2498.19 -1369.55 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD
510 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H2-1 0.216 2
8521.92 T -1201.09 2797.71 282.11
***NOTE: DESIGN IN ACCORDANCE WITH ASD
511 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.284 3
8214.19 C 438.61 -2463.99 47.02
***NOTE: DESIGN IN ACCORDANCE WITH ASD
512 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.325 3
8670.58 C -2512.02 3702.13 282.11
***NOTE: DESIGN IN ACCORDANCE WITH ASD
513 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-3 0.131 3
2848.36 C -2061.80 3647.86 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD
514 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.368 3
10241.03 C -824.76 5673.39 268.49
***NOTE: DESIGN IN ACCORDANCE WITH ASD
515 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H2-1 0.179 2
6986.33 T 296.65 3335.63 268.49
540 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.045 2
111.18 C -15174.25 39459.57 0.00

ARQUITECTO
DRO. No. 301

2012

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

C:\Documents and Settings\Juan\Escritorio\Stand pipe\Tanque.anl Page 24 of 45

Friday, March 09, 2012, 03:47 AM


STAAD SPACE -- PAGE NO. 25
ALL UNITS ARE - KG CM (UNLESS OTHERWISE NOTED)
MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/
FX MY MZ LOCATION
=======================================================================
541 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.036 3
1541.40 C 5528.63 -82320.33 0.00
542 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.066 3
550.76 T 16821.59 117218.91 0.00
543 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.099 3
2137.55 C 23725.69 163791.00 0.00
544 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.146 3
3795.78 C 26644.03 -327613.69 0.00
545 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.064 3
2500.05 C -5420.80 199592.88 122.46
546 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.140 2
3954.25 C -14432.56 436157.78 0.00

ANALISIS ESTRUCTURAL-PROYECTO DE READECUACION DE SATAND PIPE-MARZO 9 PUEBLA,PUE.

27

INGENIERO CIVIL
C. PRF. 1 734 741

VICTOR ALFONSO LOPEZ ORTEGA

ARQUITECTO
DRO. No. 301

2012

555 TAP ERED (AISC SECTIONS)


PASS AISC- H1-3 0.082 3
1135.20 C 25296.85 -82763.16 122.46
556 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.072 3
1541.40 C 17631.85 117865.07 122.46
557 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.048 3
550.76 T 4996.06 163093.17 122.46
558 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.100 2
1158.60 C -11401.92 -327407.78 122.46
559 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.070 2
2771.77 C -21662.67 -36785.79 122.46
560 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.119 2
1521.10 C -9321.25 436050.94 122.46
561 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.122 3
4978.26 C 16211.80 -309829.50 122.46
562 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.101 2
2025.12 C -12235.33 -309437.22 0.00
563 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.062 3
3004.07 C 17868.92 39601.12 122.46
C:\Documents and Settings\Juan\Escritorio\Stand pipe\Tanque.anl Page 25 of 45

Friday, March 09, 2012, 03:47 AM


STAAD SPACE -- PAGE NO. 26
ALL UNITS ARE - KG CM (UNLESS OTHERWISE NOTED)
MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/
FX MY MZ LOCATION
=======================================================================
572 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.057 3
1371.06 T -21189.91 9673.01 26.67
573 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.060 3
1147.33 C -22030.32 15366.60 0.00
574 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.065 3
1664.67 C -24435.07 -1716.24 0.00
575 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.060 3
448.97 C -23457.93 -13447.06 0.00
576 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.060 3
596.22 T -23392.21 -10421.72 0.00
577 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.074 3
3947.03 C -24579.37 1028.53 0.00
578 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.058 3
1090.47 T -21871.59 8509.49 0.00
579 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.054 1
0.20 T -22733.48 -1.28 0.00
580 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.127 3
1044.31 T 50204.39 -22135.99 160.00
581 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.134 3
1222.94 C 52540.38 -20393.10 160.00
582 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.161 3

ANALISIS ESTRUCTURAL-PROYECTO DE READECUACION DE SATAND PIPE-MARZO 9 PUEBLA,PUE.

28

INGENIERO CIVIL
C. PRF. 1 734 741

VICTOR ALFONSO LOPEZ ORTEGA

ARQUITECTO
DRO. No. 301

2012

1287.97 C 65278.11 5022.52 160.00


583 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.153 3
239.33 C 63021.09 14360.03 160.00
584 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.122 1
0.29 T 51575.82 223.38 160.00
585 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.154 3
5544.25 C 55221.62 -4249.76 160.00
586 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.122 1
0.29 T 51575.83 223.39 160.00
C:\Documents and Settings\Juan\Escritorio\Stand pipe\Tanque.anl Page 26 of 45

Friday, March 09, 2012, 03:47 AM


STAAD SPACE -- PAGE NO. 27
ALL UNITS ARE - KG CM (UNLESS OTHERWISE NOTED)
MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/
FX MY MZ LOCATION
=======================================================================
587 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.122 1
0.29 T 51575.74 -223.38 160.00
588 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.054 3
1322.76 C -20709.17 -2418.46 61.23
589 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.053 3
481.98 C -20332.56 15764.43 61.23
590 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.049 3
557.57 T -19407.42 5464.84 61.23
591 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.048 1
2.81 T -20038.21 -65.01 61.23
592 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.051 3
90.74 C -20244.22 -11587.36 61.23
593 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.060 3
997.60 C -22131.71 -19244.79 61.23
594 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.058 3
1237.70 C -19617.06 32334.54 61.23
595 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.052 3
557.07 C -20274.78 8977.72 61.23
596 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.023 3
597.39 T -7686.21 13005.03 122.46
597 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.028 3
2286.71 T -7024.27 -15558.87 122.46
598 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.032 3
1273.89 T 10351.82 14028.12 0.00
599 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.049 3
414.05 T 19576.10 4837.78 0.00
600 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.030 3
1263.87 C -10187.90 -6435.43 122.46
601 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.035 3
3290.03 C -7532.93 23271.78 122.46
C:\Documents and Settings\Juan\Escritorio\Stand pipe\Tanque.anl Page 27 of 45

ANALISIS ESTRUCTURAL-PROYECTO DE READECUACION DE SATAND PIPE-MARZO 9 PUEBLA,PUE.

29

INGENIERO CIVIL
C. PRF. 1 734 741

VICTOR ALFONSO LOPEZ ORTEGA

ARQUITECTO
DRO. No. 301

2012

Friday, March 09, 2012, 03:47 AM


STAAD SPACE -- PAGE NO. 28
ALL UNITS ARE - KG CM (UNLESS OTHERWISE NOTED)
MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/
FX MY MZ LOCATION
=======================================================================
602 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.040 3
2850.10 C 4894.78 82385.01 0.00
603 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.057 3
1198.83 C -20707.73 -15012.09 0.00
604 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.052 3
23.06 C -20360.56 -19608.14 0.00
605 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.049 3
659.75 T -19410.60 -3901.21 0.00
606 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.048 1
2.81 T -20038.21 -65.02 0.00
607 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.051 3
327.72 C -20238.61 10387.13 0.00
608 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.058 3
1314.18 C -22126.36 4659.25 0.00
609 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.050 3
687.15 C -19338.91 7609.64 5.10
610 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.059 3
1035.50 C -20266.43 33126.55 0.00
611 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.026 3
138.45 T 8470.76 25587.45 122.46
612 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.040 3
2184.54 T 13037.71 8856.22 122.46
613 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.025 3
1477.14 T 7447.84 -8963.46 122.46
614 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.039 2
701.69 T -14980.97 -3862.28 122.46
615 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.031 3
947.29 C -10193.26 16458.75 0.00
616 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.046 3
3840.60 C 5427.11 86902.45 122.46
C:\Documents and Settings\Juan\Escritorio\Stand pipe\Tanque.anl Page 28 of 45

Friday, March 09, 2012, 03:47 AM


STAAD SPACE -- PAGE NO. 29
ALL UNITS ARE - KG CM (UNLESS OTHERWISE NOTED)
MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/
FX MY MZ LOCATION
=======================================================================
617 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.033 3
2371.66 C -8795.81 14202.76 0.00
618 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.031 2
1562.99 C -8847.95 -17859.06 0.00
619 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.038 3

ANALISIS ESTRUCTURAL-PROYECTO DE READECUACION DE SATAND PIPE-MARZO 9 PUEBLA,PUE.

30

INGENIERO CIVIL
C. PRF. 1 734 741

VICTOR ALFONSO LOPEZ ORTEGA

ARQUITECTO
DRO. No. 301

2012

1737.59 C 12497.14 -5732.43 122.46


620 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.009 3
331.94 T -2760.47 4959.86 61.59
621 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.009 3
37.26 C -2128.36 18412.62 36.96
622 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.008 3
417.76 C -2564.48 3072.78 61.59
623 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.008 3
242.03 C -2349.66 -5566.41 49.27
624 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.013 3
581.80 C 377.31 46574.55 147.82
625 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.014 3
429.89 C 398.24 -53074.30 147.82
626 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.009 3
241.58 T -2585.43 -8304.63 49.27
627 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.008 3
83.08 C -2489.58 -10297.51 49.27
628 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.161 3
1324.63 T -12660.09 -216730.16 0.00
629 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.159 2
4288.90 T -2871.43 238044.23 0.00
630 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.149 1
1331.13 C 376.55 -272755.16 0.00
631 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.261 3
2559.13 C 15692.06 -363920.28 0.00
C:\Documents and Settings\Juan\Escritorio\Stand pipe\Tanque.anl Page 29 of 45

Friday, March 09, 2012, 03:47 AM


STAAD SPACE -- PAGE NO. 30
ALL UNITS ARE - KG CM (UNLESS OTHERWISE NOTED)
MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/
FX MY MZ LOCATION
=======================================================================
632 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.233 3
2909.13 C -8630.44 351185.97 0.00
633 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.247 3
5623.88 C -256.98 382388.84 0.00
634 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.290 3
5730.45 C 9470.08 402165.41 0.00
635 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.192 3
29.10 T 15000.25 283253.38 0.00
636 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.058 3
1720.43 C 5504.76 40824.95 350.00
637 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.075 2
1291.06 T -1031.72 -126745.19 0.00
638 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.061 2
3249.02 T 3666.60 -48501.85 0.00
639 TAP ERED (AISC SECTIONS)

ANALISIS ESTRUCTURAL-PROYECTO DE READECUACION DE SATAND PIPE-MARZO 9 PUEBLA,PUE.

31

INGENIERO CIVIL
C. PRF. 1 734 741

VICTOR ALFONSO LOPEZ ORTEGA

ARQUITECTO
DRO. No. 301

2012

PASS AISC- H1-3 0.131 3


3833.36 C 9837.74 113902.12 0.00
640 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.074 3
600.87 T 9601.05 -73035.21 350.00
641 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.069 3
2425.34 C -2185.09 -74039.02 350.00
642 TAP ERED (AISC SECTIONS)
PASS AISC- H1-3 0.116 3
4343.34 C 7482.13 -89972.05 0.00
643 TAP ERED (AISC SECTIONS)
PASS AISC- H2-1 0.078 3
2525.41 T 7785.00 -64687.53 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR TUBES***
644 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-3 0.095 3
2503.61 C 133.97 -3303.69 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR TUBES***
645 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-3 0.081 3
2411.19 C -1678.83 401.65 213.59
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR TUBES***
C:\Documents and Settings\Juan\Escritorio\Stand pipe\Tanque.anl Page 30 of 45

Friday, March 09, 2012, 03:47 AM


STAAD SPACE -- PAGE NO. 31
ALL UNITS ARE - KG CM (UNLESS OTHERWISE NOTED)
MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/
FX MY MZ LOCATION
=======================================================================
646 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H2-1 0.100 2
3753.16 T -2354.58 308.17 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR TUBES***
647 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H2-1 0.105 2
3760.12 T 1605.24 -1826.67 213.59
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR TUBES***
648 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H2-1 0.147 3
5031.54 T 4174.47 -1178.56 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR TUBES***
649 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H2-1 0.127 2
5400.79 T -877.94 -392.26 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR TUBES***
650 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.213 3
6399.67 C -3161.97 2291.25 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR TUBES***
651 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.220 3
6475.48 C 3031.41 -3421.99 213.59
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR TUBES***
652 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-3 0.143 3
3568.83 C 3634.06 -2623.91 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR TUBES***
653 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-3 0.126 3
3492.42 C -2060.95 2083.84 213.59
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR TUBES***
654 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H2-1 0.059 3
836.45 T -4125.39 -1793.12 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR TUBES***

ANALISIS ESTRUCTURAL-PROYECTO DE READECUACION DE SATAND PIPE-MARZO 9 PUEBLA,PUE.

32

INGENIERO CIVIL
C. PRF. 1 734 741

VICTOR ALFONSO LOPEZ ORTEGA

ARQUITECTO
DRO. No. 301

2012

655 ST HSST4X4X0.25 (AISC SECTIONS)


PASS AISC- H2-1 0.038 3
918.15 T 792.91 1769.97 213.59
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR TUBES***
656 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.215 3
6468.56 C 1903.32 -3833.43 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR TUBES***
657 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.205 3
6385.08 C -2188.48 2027.95 213.59
C:\Documents and Settings\Juan\Escritorio\Stand pipe\Tanque.anl Page 31 of 45

Friday, March 09, 2012, 03:47 AM


STAAD SPACE -- PAGE NO. 32
***NOTE: DESIGN IN ACCORDANCE WITH ASD
658 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H2-1 0.169 3
6501.90 T -2783.02 -1159.44 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD
659 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H2-1 0.164 2
6872.53 T -888.15 -1174.72 213.59
***NOTE: DESIGN IN ACCORDANCE WITH ASD
660 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H2-1 0.100 2
3830.57 T 877.36 -1349.81 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD
661 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H2-1 0.102 2
3809.46 T 629.82 -2158.81 213.59
***NOTE: DESIGN IN ACCORDANCE WITH ASD
662 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-3 0.119 3
4145.98 C 273.68 249.34 213.59
***NOTE: DESIGN IN ACCORDANCE WITH ASD
663 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-3 0.144 3
4223.96 C -2593.23 1442.83 213.59
***NOTE: DESIGN IN ACCORDANCE WITH ASD
664 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H2-1 0.054 3
1674.56 T 519.31 2066.49 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD
665 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H2-1 0.046 2
1908.91 T -266.66 444.43 213.59
***NOTE: DESIGN IN ACCORDANCE WITH ASD
666 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-3 0.074 3
2098.07 C 132.58 2164.11 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD
667 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-3 0.074 3
2024.90 C 1437.75 1203.92 213.59
***NOTE: DESIGN IN ACCORDANCE WITH ASD
668 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-3 0.149 3
4525.71 C -1597.23 1840.33 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD
669 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-3 0.136 3
4430.28 C -1033.62 952.55 213.59
***NOTE: DESIGN IN ACCORDANCE WITH ASD
670 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H2-1 0.101 2
4284.86 T 453.26 622.12 213.59

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

ANALISIS ESTRUCTURAL-PROYECTO DE READECUACION DE SATAND PIPE-MARZO 9 PUEBLA,PUE.

33

INGENIERO CIVIL
C. PRF. 1 734 741

VICTOR ALFONSO LOPEZ ORTEGA

ARQUITECTO
DRO. No. 301

2012

***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR TUBES***


671 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H2-1 0.108 2
4260.79 T -645.31 -1409.77 213.59
C:\Documents and Settings\Juan\Escritorio\Stand pipe\Tanque.anl Page 32 of 45

Friday, March 09, 2012, 03:47 AM


STAAD SPACE -- PAGE NO. 33
***NOTE: DESIGN IN ACCORDANCE WITH ASD
672 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H2-1 0.058 2
1364.43 T -2342.50 -1678.82 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD
673 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H2-1 0.042 3
1176.87 T 809.25 -1416.53 213.59
***NOTE: DESIGN IN ACCORDANCE WITH ASD
674 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-3 0.068 3
1905.34 C -1391.48 762.75 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD
675 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-3 0.058 3
1838.85 C 653.04 418.47 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD
676 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.285 1
8570.49 C 176.20 3764.33 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD
677 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.285 1
8570.49 C -176.21 3764.34 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD
678 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.285 1
8570.49 C 176.18 3764.35 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD
679 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.439 3
12866.56 C 2214.06 4456.96 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD
680 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.501 3
15021.83 C -58.63 6169.11 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD
681 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.444 3
12555.68 C -2267.64 6422.65 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD
682 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.285 1
8570.49 C -176.19 3764.34 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD
683 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-3 0.125 1
4427.74 C 624.74 2095.09 117.26
***NOTE: DESIGN IN ACCORDANCE WITH ASD
684 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.262 1
8482.88 C -6.28 -994.34 128.06
***NOTE: DESIGN IN ACCORDANCE WITH ASD
685 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.262 1
8482.88 C 6.27 -994.34 128.06

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

34
PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

C:\Documents and Settings\Juan\Escritorio\Stand pipe\Tanque.anl Page 33 of 45

Friday, March 09, 2012, 03:47 AM


STAAD SPACE -- PAGE NO. 34

ANALISIS ESTRUCTURAL-PROYECTO DE READECUACION DE SATAND PIPE-MARZO 9 PUEBLA,PUE.

INGENIERO CIVIL
C. PRF. 1 734 741

VICTOR ALFONSO LOPEZ ORTEGA

***NOTE: DESIGN IN ACCORDANCE WITH ASD


686 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.262 1
8482.88 C -6.28 -994.34 128.06
***NOTE: DESIGN IN ACCORDANCE WITH ASD
687 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.402 3
12763.97 C 1773.25 -380.88 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD
688 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.459 3
14912.72 C -55.93 -1165.47 42.69
***NOTE: DESIGN IN ACCORDANCE WITH ASD
689 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.396 3
12477.70 C -1698.97 -825.22 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD
690 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.262 1
8482.88 C 6.28 -994.34 128.06
***NOTE: DESIGN IN ACCORDANCE WITH ASD
691 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.285 1
8570.49 C 176.25 3764.34 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD
692 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-1 0.262 1
8482.88 C -6.27 -994.34 128.06
***NOTE: DESIGN IN ACCORDANCE WITH ASD
693 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-3 0.033 3
59.70 C 1763.70 -2944.25 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD
694 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-3 0.032 3
37.57 C 1377.13 -3269.58 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD
695 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-3 0.023 3
15.58 C 1399.32 -2008.20 0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD
696 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-3 0.016 3
11.31 C 353.14 -1947.68 122.46
***NOTE: DESIGN IN ACCORDANCE WITH ASD
697 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-3 0.045 3
38.31 C 2946.14 -3573.01 122.46
***NOTE: DESIGN IN ACCORDANCE WITH ASD
698 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-3 0.024 3
63.55 C 654.94 -2693.29 122.46
***NOTE: DESIGN IN ACCORDANCE WITH ASD
699 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-3 0.016 3
57.34 C -850.17 -1336.01 81.64

ARQUITECTO
DRO. No. 301

2012

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

35
PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

PROVISIONS FOR TUBES***

C:\Documents and Settings\Juan\Escritorio\Stand pipe\Tanque.anl Page 34 of 45

Friday, March 09, 2012, 03:47 AM


STAAD SPACE -- PAGE NO. 35
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR TUBES***
700 ST HSST4X4X0.25 (AISC SECTIONS)
PASS AISC- H1-3 0.014 3
63.28 C -1231.37 -637.52 0.00
189. STEEL MEMBER TAKE OFF ALL
C:\Documents and Settings\Juan\Escritorio\Stand pipe\Tanque.anl Page 35 of 45

Friday, March 09, 2012, 03:47 AM

ANALISIS ESTRUCTURAL-PROYECTO DE READECUACION DE SATAND PIPE-MARZO 9 PUEBLA,PUE.

INGENIERO CIVIL
C. PRF. 1 734 741

VICTOR ALFONSO LOPEZ ORTEGA

ARQUITECTO
DRO. No. 301

2012

STAAD SPACE -- PAGE NO. 36


STEEL TAKE-OFF
-------------PROFILE LENGTH(CM ) WEIGHT(KG )
TAPERED 84 25119.18 26411.137
TAPERED 116 18400.01 9106.549
ST HSST4X4X0.25 29871.54 5087.514
PRISMATIC STEEL 0.00 0.000
---------------TOTAL = 40605.203
MEMBER PROFILE LENGTH WEIGHT
(CM ) (KG )
84 TAP ERED 122.46 128.757
85 TAP ERED 122.46 128.757
86 TAP ERED 122.46 128.757
87 TAP ERED 122.46 128.757
88 TAP ERED 122.46 128.757
89 TAP ERED 122.46 128.757
90 TAP ERED 122.46 128.757
99 TAP ERED 122.46 128.757
100 TAP ERED 122.46 128.757
101 TAP ERED 122.46 128.757
102 TAP ERED 122.46 128.757
103 TAP ERED 122.46 128.757
104 TAP ERED 122.46 128.757
105 TAP ERED 122.46 128.757
106 TAP ERED 122.46 128.757
107 TAP ERED 122.46 128.757
116 TAP ERED 140.00 69.289
117 TAP ERED 140.00 69.289
118 TAP ERED 140.00 69.289
119 TAP ERED 140.00 69.289
120 TAP ERED 140.00 69.289
121 TAP ERED 140.00 69.289
122 TAP ERED 140.00 69.289
123 TAP ERED 140.00 69.289
148 TAP ERED 122.46 128.757
149 TAP ERED 122.46 128.757
150 TAP ERED 122.46 128.757
151 TAP ERED 122.46 128.757
152 TAP ERED 122.46 128.757
153 TAP ERED 122.46 128.757
154 TAP ERED 122.46 128.757
163 TAP ERED 122.46 128.757
164 TAP ERED 122.46 128.757
165 TAP ERED 122.46 128.757
166 TAP ERED 122.46 128.757
167 TAP ERED 122.46 128.757
168 TAP ERED 122.46 128.757
C:\Documents and Settings\Juan\Escritorio\Stand pipe\Tanque.anl Page 36 of 45

Friday, March 09, 2012, 03:47 AM


STAAD SPACE -- PAGE
169 TAP ERED 122.46
170 TAP ERED 122.46
171 TAP ERED 122.46
180 TAP ERED 110.00
181 TAP ERED 110.00
182 TAP ERED 110.00
183 TAP ERED 110.00
184 TAP ERED 110.00
185 TAP ERED 110.00
186 TAP ERED 110.00
187 TAP ERED 110.00
212 TAP ERED 122.46
213 TAP ERED 122.46
214 TAP ERED 122.46

NO. 37
128.757
128.757
128.757
54.441
54.441
54.441
54.441
54.441
54.441
54.441
54.441
128.757
128.757
128.757

ANALISIS ESTRUCTURAL-PROYECTO DE READECUACION DE SATAND PIPE-MARZO 9 PUEBLA,PUE.

36

INGENIERO CIVIL
C. PRF. 1 734 741

215
216
217
218
227
228
229
230
231
232
233
234
235
244
245
246
247
248
249
250
251
276
277
278
279
280
281
282
291
292
293
294
295
296
297
298
299
308
309
310
311
312

TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP

ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED

122.46
122.46
122.46
122.46
122.46
122.46
122.46
122.46
122.46
122.46
122.46
122.46
122.46
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
122.46
122.46
122.46
122.46
122.46
122.46
122.46
122.46
122.46
122.46
122.46
122.46
122.46
122.46
122.46
122.46
400.00
400.00
400.00
400.00
400.00

VICTOR ALFONSO LOPEZ ORTEGA

ARQUITECTO
DRO. No. 301

2012

128.757
128.757
128.757
128.757
128.757
128.757
128.757
128.757
128.757
128.757
128.757
128.757
128.757
74.238
74.238
74.238
74.238
74.238
74.238
74.238
74.238
128.757
128.757
128.757
128.757
128.757
128.757
128.757
128.757
128.757
128.757
128.757
128.757
128.757
128.757
128.757
128.757
197.968
197.968
197.968
197.968
197.968

C:\Documents and Settings\Juan\Escritorio\Stand pipe\Tanque.anl Page 37 of 45

Friday, March 09, 2012, 03:47 AM


STAAD SPACE -- PAGE
313 TAP ERED 400.00
314 TAP ERED 400.00
315 TAP ERED 400.00
316 ST HSST4X4X0.25
317 ST HSST4X4X0.25
318 ST HSST4X4X0.25
319 ST HSST4X4X0.25
320 ST HSST4X4X0.25
321 ST HSST4X4X0.25
322 ST HSST4X4X0.25
323 ST HSST4X4X0.25
324 ST HSST4X4X0.25
325 ST HSST4X4X0.25
326 ST HSST4X4X0.25
327 ST HSST4X4X0.25
328 ST HSST4X4X0.25
329 ST HSST4X4X0.25
330 ST HSST4X4X0.25
331 ST HSST4X4X0.25
356 TAP ERED 122.46
357 TAP ERED 122.46

NO. 38
197.968
197.968
197.968
234.51 39.941
234.51 39.941
234.51 39.941
234.51 39.941
234.51 39.941
234.51 39.941
234.51 39.941
234.51 39.941
234.51 39.941
234.51 39.941
234.51 39.941
234.51 39.941
234.51 39.941
234.51 39.941
234.51 39.941
234.51 39.941
128.757
128.757

ANALISIS ESTRUCTURAL-PROYECTO DE READECUACION DE SATAND PIPE-MARZO 9 PUEBLA,PUE.

37

INGENIERO CIVIL
C. PRF. 1 734 741

358
359
360
361
362
371
372
373
374
375
376
377
378
379
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408

TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP

ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED

122.46
122.46
122.46
122.46
122.46
122.46
122.46
122.46
122.46
122.46
122.46
122.46
122.46
122.46
400.00
400.00
400.00
400.00
400.00
400.00
400.00
400.00
160.00
160.00
160.00
160.00
160.00
160.00
160.00
160.00
160.00
160.00
160.00
160.00
160.00

VICTOR ALFONSO LOPEZ ORTEGA

ARQUITECTO
DRO. No. 301

2012

128.757
128.757
128.757
128.757
128.757
128.757
128.757
128.757
128.757
128.757
128.757
128.757
128.757
128.757
197.968
197.968
197.968
197.968
197.968
197.968
197.968
197.968
168.229
168.229
168.229
168.229
168.229
168.229
168.229
168.229
168.229
168.229
168.229
168.229
168.229

C:\Documents and Settings\Juan\Escritorio\Stand pipe\Tanque.anl Page 38 of 45

Friday, March 09, 2012, 03:47 AM


STAAD SPACE -- PAGE NO. 39
409 TAP ERED 160.00 168.229
410 TAP ERED 160.00 168.229
411 TAP ERED 160.00 168.229
412 TAP ERED 61.23 64.379
413 TAP ERED 61.23 64.379
414 TAP ERED 61.23 64.379
415 TAP ERED 61.23 64.378
416 TAP ERED 61.23 64.378
417 TAP ERED 61.23 64.378
418 TAP ERED 61.23 64.378
419 TAP ERED 61.23 64.379
420 TAP ERED 122.46 128.757
421 TAP ERED 122.46 128.757
422 TAP ERED 122.46 128.757
423 TAP ERED 122.46 128.757
424 TAP ERED 122.46 128.757
425 TAP ERED 122.46 128.757
426 TAP ERED 122.46 128.757
427 TAP ERED 61.23 64.378
428 TAP ERED 61.23 64.378
429 TAP ERED 61.23 64.378
430 TAP ERED 61.23 64.379
431 TAP ERED 61.23 64.379
432 TAP ERED 61.23 64.379
433 TAP ERED 61.23 64.379
434 TAP ERED 61.23 64.378
435 TAP ERED 122.46 128.757
436 TAP ERED 122.46 128.757

ANALISIS ESTRUCTURAL-PROYECTO DE READECUACION DE SATAND PIPE-MARZO 9 PUEBLA,PUE.

38

INGENIERO CIVIL
C. PRF. 1 734 741

437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464

TAP ERED 122.46


TAP ERED 122.46
TAP ERED 122.46
TAP ERED 122.46
TAP ERED 122.46
TAP ERED 122.46
TAP ERED 122.46
TAP ERED 147.82
TAP ERED 147.82
TAP ERED 147.82
TAP ERED 147.82
TAP ERED 147.82
TAP ERED 147.82
TAP ERED 147.82
TAP ERED 147.82
TAP ERED 400.00
TAP ERED 400.00
TAP ERED 400.00
TAP ERED 400.00
TAP ERED 400.00
TAP ERED 400.00
TAP ERED 400.00
TAP ERED 400.00
ST HSST4X4X0.25
ST HSST4X4X0.25
ST HSST4X4X0.25
ST HSST4X4X0.25
ST HSST4X4X0.25

VICTOR ALFONSO LOPEZ ORTEGA

ARQUITECTO
DRO. No. 301

2012

128.757
128.757
128.757
128.757
128.757
128.757
128.757
155.424
155.424
155.423
155.423
155.424
155.424
155.424
155.424
197.968
197.968
197.968
197.968
197.968
197.968
197.968
197.968
234.51 39.941
234.51 39.941
234.51 39.941
234.51 39.941
234.51 39.941

C:\Documents and Settings\Juan\Escritorio\Stand pipe\Tanque.anl Page 39 of 45

Friday, March 09, 2012, 03:47 AM


STAAD SPACE -- PAGE
465 ST HSST4X4X0.25
466 ST HSST4X4X0.25
467 ST HSST4X4X0.25
468 ST HSST4X4X0.25
469 ST HSST4X4X0.25
470 ST HSST4X4X0.25
471 ST HSST4X4X0.25
472 ST HSST4X4X0.25
473 ST HSST4X4X0.25
474 ST HSST4X4X0.25
475 ST HSST4X4X0.25
476 ST HSST4X4X0.25
477 ST HSST4X4X0.25
478 ST HSST4X4X0.25
479 ST HSST4X4X0.25
480 ST HSST4X4X0.25
481 ST HSST4X4X0.25
482 ST HSST4X4X0.25
483 ST HSST4X4X0.25
484 ST HSST4X4X0.25
485 ST HSST4X4X0.25
486 ST HSST4X4X0.25
487 ST HSST4X4X0.25
488 ST HSST4X4X0.25
489 ST HSST4X4X0.25
490 ST HSST4X4X0.25
491 ST HSST4X4X0.25
492 ST HSST4X4X0.25
493 ST HSST4X4X0.25
494 ST HSST4X4X0.25
495 ST HSST4X4X0.25
496 ST HSST4X4X0.25
497 ST HSST4X4X0.25
498 ST HSST4X4X0.25
499 ST HSST4X4X0.25

NO. 40
234.51
234.51
234.51
234.51
234.51
234.51
117.26
234.51
234.51
234.51
234.51
234.51
234.51
234.51
234.51
234.51
234.51
234.51
234.51
234.51
234.51
234.51
234.51
234.51
234.51
234.51
234.51
287.20
287.20
287.20
287.20
287.20
287.20
287.20
287.20

39.941
39.941
39.941
39.941
39.941
39.941
19.970
39.941
39.941
39.941
39.941
39.941
39.941
39.941
39.941
39.941
39.941
39.941
39.941
39.941
39.941
39.941
39.941
39.941
39.941
39.941
39.941
48.914
48.914
48.914
48.914
48.914
48.914
48.914
48.914

ANALISIS ESTRUCTURAL-PROYECTO DE READECUACION DE SATAND PIPE-MARZO 9 PUEBLA,PUE.

39

INGENIERO CIVIL
C. PRF. 1 734 741

500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
540
541
542
543
544

ST HSST4X4X0.25
ST HSST4X4X0.25
ST HSST4X4X0.25
ST HSST4X4X0.25
ST HSST4X4X0.25
ST HSST4X4X0.25
ST HSST4X4X0.25
ST HSST4X4X0.25
ST HSST4X4X0.25
ST HSST4X4X0.25
ST HSST4X4X0.25
ST HSST4X4X0.25
ST HSST4X4X0.25
ST HSST4X4X0.25
ST HSST4X4X0.25
ST HSST4X4X0.25
TAP ERED 122.46
TAP ERED 122.46
TAP ERED 122.46
TAP ERED 122.46
TAP ERED 122.46

VICTOR ALFONSO LOPEZ ORTEGA

ARQUITECTO
DRO. No. 301

2012

268.49 45.727
268.49 45.727
268.49 45.727
268.49 45.727
268.49 45.727
268.49 45.727
282.11 48.047
282.11 48.047
282.11 48.047
282.11 48.047
282.11 48.047
282.11 48.047
282.11 48.047
282.11 48.047
268.49 45.727
268.49 45.727
128.757
128.757
128.757
128.757
128.757

C:\Documents and Settings\Juan\Escritorio\Stand pipe\Tanque.anl Page 40 of 45

Friday, March 09, 2012, 03:47 AM


STAAD SPACE -- PAGE NO. 41
545 TAP ERED 122.46 128.757
546 TAP ERED 122.46 128.757
555 TAP ERED 122.46 128.757
556 TAP ERED 122.46 128.757
557 TAP ERED 122.46 128.757
558 TAP ERED 122.46 128.757
559 TAP ERED 122.46 128.757
560 TAP ERED 122.46 128.757
561 TAP ERED 122.46 128.757
562 TAP ERED 122.46 128.757
563 TAP ERED 122.46 128.757
572 TAP ERED 160.00 168.229
573 TAP ERED 160.00 168.229
574 TAP ERED 160.00 168.229
575 TAP ERED 160.00 168.229
576 TAP ERED 160.00 168.229
577 TAP ERED 160.00 168.229
578 TAP ERED 160.00 168.229
579 TAP ERED 160.00 168.229
580 TAP ERED 160.00 168.229
581 TAP ERED 160.00 168.229
582 TAP ERED 160.00 168.229
583 TAP ERED 160.00 168.229
584 TAP ERED 160.00 168.229
585 TAP ERED 160.00 168.229
586 TAP ERED 160.00 168.229
587 TAP ERED 160.00 168.229
588 TAP ERED 61.23 64.379
589 TAP ERED 61.23 64.379
590 TAP ERED 61.23 64.379
591 TAP ERED 61.23 64.378
592 TAP ERED 61.23 64.378
593 TAP ERED 61.23 64.378
594 TAP ERED 61.23 64.378
595 TAP ERED 61.23 64.379
596 TAP ERED 122.46 128.757
597 TAP ERED 122.46 128.757
598 TAP ERED 122.46 128.757
599 TAP ERED 122.46 128.757
600 TAP ERED 122.46 128.757
601 TAP ERED 122.46 128.757
602 TAP ERED 122.46 128.757

ANALISIS ESTRUCTURAL-PROYECTO DE READECUACION DE SATAND PIPE-MARZO 9 PUEBLA,PUE.

40

INGENIERO CIVIL
C. PRF. 1 734 741

603
604
605
606
607
608
609
610
611
612
613
614
615
616

TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP

ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED
ERED

VICTOR ALFONSO LOPEZ ORTEGA

ARQUITECTO
DRO. No. 301

2012

61.23 64.378
61.23 64.378
61.23 64.378
61.23 64.379
61.23 64.379
61.23 64.379
61.23 64.379
61.23 64.378
122.46 128.757
122.46 128.757
122.46 128.757
122.46 128.757
122.46 128.757
122.46 128.757

C:\Documents and Settings\Juan\Escritorio\Stand pipe\Tanque.anl Page 41 of 45

Friday, March 09, 2012, 03:47 AM


STAAD SPACE -- PAGE
617 TAP ERED 122.46
618 TAP ERED 122.46
619 TAP ERED 122.46
620 TAP ERED 147.82
621 TAP ERED 147.82
622 TAP ERED 147.82
623 TAP ERED 147.82
624 TAP ERED 147.82
625 TAP ERED 147.82
626 TAP ERED 147.82
627 TAP ERED 147.82
628 TAP ERED 350.00
629 TAP ERED 350.00
630 TAP ERED 350.00
631 TAP ERED 350.00
632 TAP ERED 350.00
633 TAP ERED 350.00
634 TAP ERED 350.00
635 TAP ERED 350.00
636 TAP ERED 350.00
637 TAP ERED 350.00
638 TAP ERED 350.00
639 TAP ERED 350.00
640 TAP ERED 350.00
641 TAP ERED 350.00
642 TAP ERED 350.00
643 TAP ERED 350.00
644 ST HSST4X4X0.25
645 ST HSST4X4X0.25
646 ST HSST4X4X0.25
647 ST HSST4X4X0.25
648 ST HSST4X4X0.25
649 ST HSST4X4X0.25
650 ST HSST4X4X0.25
651 ST HSST4X4X0.25
652 ST HSST4X4X0.25
653 ST HSST4X4X0.25
654 ST HSST4X4X0.25
655 ST HSST4X4X0.25
656 ST HSST4X4X0.25
657 ST HSST4X4X0.25
658 ST HSST4X4X0.25
659 ST HSST4X4X0.25
660 ST HSST4X4X0.25
661 ST HSST4X4X0.25
662 ST HSST4X4X0.25
663 ST HSST4X4X0.25
664 ST HSST4X4X0.25
665 ST HSST4X4X0.25

NO. 42
128.757
128.757
128.757
155.424
155.424
155.423
155.423
155.424
155.424
155.424
155.424
173.222
173.222
173.222
173.222
173.222
173.222
173.222
173.222
173.222
173.222
173.222
173.222
173.222
173.222
173.222
173.222
213.59 36.377
213.59 36.377
213.59 36.377
213.59 36.377
213.59 36.377
213.59 36.377
213.59 36.377
213.59 36.377
213.59 36.377
213.59 36.377
213.59 36.377
213.59 36.377
213.59 36.377
213.59 36.377
213.59 36.377
213.59 36.377
213.59 36.377
213.59 36.377
213.59 36.377
213.59 36.377
213.59 36.377
213.59 36.377

ANALISIS ESTRUCTURAL-PROYECTO DE READECUACION DE SATAND PIPE-MARZO 9 PUEBLA,PUE.

41

INGENIERO CIVIL
C. PRF. 1 734 741

666
667
668
669
670
671
672

ST
ST
ST
ST
ST
ST
ST

HSST4X4X0.25
HSST4X4X0.25
HSST4X4X0.25
HSST4X4X0.25
HSST4X4X0.25
HSST4X4X0.25
HSST4X4X0.25

VICTOR ALFONSO LOPEZ ORTEGA

213.59
213.59
213.59
213.59
213.59
213.59
213.59

ARQUITECTO
DRO. No. 301

2012

36.377
36.377
36.377
36.377
36.377
36.377
36.377

C:\Documents and Settings\Juan\Escritorio\Stand pipe\Tanque.anl Page 42 of 45

Friday, March 09, 2012, 03:47 AM


STAAD SPACE -- PAGE NO. 43
673 ST HSST4X4X0.25 213.59 36.377
674 ST HSST4X4X0.25 213.59 36.377
675 ST HSST4X4X0.25 213.59 36.377
676 ST HSST4X4X0.25 256.12 43.621
677 ST HSST4X4X0.25 256.12 43.621
678 ST HSST4X4X0.25 256.12 43.621
679 ST HSST4X4X0.25 256.12 43.621
680 ST HSST4X4X0.25 256.12 43.621
681 ST HSST4X4X0.25 256.12 43.621
682 ST HSST4X4X0.25 256.12 43.621
683 ST HSST4X4X0.25 117.26 19.970
684 ST HSST4X4X0.25 256.12 43.621
685 ST HSST4X4X0.25 256.12 43.621
686 ST HSST4X4X0.25 256.12 43.621
687 ST HSST4X4X0.25 256.12 43.621
688 ST HSST4X4X0.25 256.12 43.621
689 ST HSST4X4X0.25 256.12 43.621
690 ST HSST4X4X0.25 256.12 43.621
691 ST HSST4X4X0.25 256.12 43.621
692 ST HSST4X4X0.25 256.12 43.621
693 ST HSST4X4X0.25 122.46 20.856
694 ST HSST4X4X0.25 122.46 20.856
695 ST HSST4X4X0.25 122.46 20.856
696 ST HSST4X4X0.25 122.46 20.856
697 ST HSST4X4X0.25 122.46 20.856
698 ST HSST4X4X0.25 122.46 20.856
699 ST HSST4X4X0.25 122.46 20.856
700 ST HSST4X4X0.25 122.46 20.856
************ END OF DATA FROM INTERNAL STORAGE ************
190. FINISH
*********** END OF THE STAAD.Pro RUN ***********
**** DATE= MAR 9,2012 TIME= 3:46:50 ****
C:\Documents and Settings\Juan\Escritorio\Stand pipe\Tanque.anl Page 43 of 45

Friday, March 09, 2012, 03:47 AM


STAAD SPACE -- PAGE NO. 44
************************************************************
* For questions on STAAD.Pro, please contact *
* Research Engineers Offices at the following locations *
* *
* Telephone Email *
* USA: +1 (714)974-2500 support@reiusa.com *
* CANADA +1 (905)632-4771 detech@odandetech.com *
* CANADA +1 (604)629 6087 staad@dowco.com *
* UK +44(1454)207-000 support@reel.co.uk *
* FRANCE +33(0)1 64551084 support@reel.co.uk *
* GERMANY +49/931/40468-71 info@reig.de *
* NORWAY +47 67 57 21 30 staad@edr.no *
* SINGAPORE +65 6225-6015/16 support@reiasia.net *
* INDIA +91(033)2357-3575 support@calcutta.reiusa.com *
* JAPAN +81(03)5952-6500 eng-eye@crc.co.jp *
* CHINA +86(411)363-1983 support@reiasia.net *
* *
* North America support@reiusa.com *
* Europe support@reel.co.uk *
* Asia support@reiasia.net *
************************************************************

ANALISIS ESTRUCTURAL-PROYECTO DE READECUACION DE SATAND PIPE-MARZO 9 PUEBLA,PUE.

42

INGENIERO CIVIL
C. PRF. 1 734 741

VICTOR ALFONSO LOPEZ ORTEGA

ARQUITECTO
DRO. No. 301

2012

C:\Documents and Settings\Juan\Escritorio\Stand pipe\Tanque.anl Page 44 of 45

Friday, March 09, 2012, 03:47 AM


STAAD SPACE -- PAGE NO. 45
Information about the key files in the current distribution
Modfication Date CRC Size (Bytes) File Name
---------------------------------------------------------------------------------------07/12/2005 0xaf01 11636736 SProStaad.exe
12/17/2004 0xca81 04558848 SProStaadStl.exe
09/19/2003 0x2fc0 00081970 CMesh.dll
07/11/2005 0xc7c0 02396160 dbsectioninterface.dll
01/24/2001 0x9b40 00073728 LoadGen.dll
09/25/2003 0x6340 00704512 MeshEngine.dll
09/22/2003 0xce00 00069632 QuadPlateEngine.dll
04/16/2004 0x91c1 00139264 SurfMesh.dll
06/23/2005 0x4c01 00493568 aiscsections.mdb
01/05/2005 0x79c1 00319488 aiscsections_all_editions.mdb
01/05/2005 0x4b81 01810432 aiscsteeljoists.mdb
01/05/2005 0xcac1 03651584 aitctimbersections.mdb
01/27/2005 0xeb01 00552960 aluminumsections.mdb
01/05/2005 0xcd01 00163840 australiansections.mdb
01/05/2005 0x6a41 00229376 britishsections.mdb
07/08/2005 0x9d41 00434176 bscoldformedsections.mdb
06/28/2005 0x8201 00327680 butlercoldformedsections.mdb
01/05/2005 0xabc0 00262144 canadiansections.mdb
05/31/2005 0x9e81 00450560 canadiantimbersections.mdb
05/05/2005 0x7f80 00409600 chinesesections.mdb
01/05/2005 0xd6c0 00600064 dutchsections.mdb
01/05/2005 0x1a00 00354304 europeansections.mdb
01/05/2005 0xd301 00202752 frenchsections.mdb
01/05/2005 0x11c1 00233472 germansections.mdb
01/05/2005 0x3c40 00264192 indiansections.mdb
01/05/2005 0xd540 00180224 iscoldformedsections.mdb
02/03/2005 0x9c01 00202752 japanesesections.mdb
01/05/2005 0xb740 00174080 koreansections.mdb
02/03/2005 0xda00 00096256 lysaghtcoldformedsections.mdb
02/07/2005 0x9a00 00243712 mexicansteeltables.mdb
02/03/2005 0x9b40 00307200 russiansections.mdb
01/05/2005 0x9081 00206848 southafricansections.mdb
01/06/2005 0x9341 00194560 spanishsections.mdb
06/23/2005 0x2800 00204800 uscoldformedsections.mdb
01/05/2005 0xbac0 00149504 usersectionstemplate.mdb
01/05/2005 0x9d41 00141312 venezuelansections.mdb
---------------------------------------------------------------------------------------C:\Documents and Settings\Juan\Escritorio\Stand pipe\Tanque.anl Page 45 of 45

ANALISIS ESTRUCTURAL-PROYECTO DE READECUACION DE SATAND PIPE-MARZO 9 PUEBLA,PUE.

43

Potrebbero piacerti anche