Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Read the questions carefully and write the required information on the spaces provided or otherwise check () the appropriate boxes or parenthesis ( ). Use additional sheets if necessary and indicate this in the appropriate space. Misleading or erroneous answers are basis for legal actions and/or denial of ECC issuance.
Project Site Location: Project Status: Nature of Project: Production Rate: Total Project Area: Project Components: Manpower Requirement: Project Cost: Project Proponent: Office Address:
________________________________________________________________
_________________________________________________________
PROCESS DOCUMENTATION
EIA Team: Specialist Areas of Expertise Module
EIA Study Area: Direct Impact Areas: (Complete Barangay, and Municipality/City) ____________________________________________________________________ ____________________________________________________________________ ____________________________________________________________________ Indirect Impact Areas: (Complete Barangay, and Municipality/City) ____________________________________________________________________ ____________________________________________________________________ ____________________________________________________________________
EIA Methodology:
EIA Study Module METHODOLOGY Type of Data (please Source of Data/Remarks check) (e.g. LGU) Primary* Secondary
Land (Vicinity of Project Area) Land Use Classification Terrestrial Biology Water Oceanography Water Quality Freshwater or Marine Ecology Air (Vicinity of Project Area) Meteorology/Climatology Air Quality and Noise People * Section or page number where the primary data can be found
I. PROJECT DESCRIPTION
1.1 PROJECT LOCATION AND AREA: Street Name, Barangay, and Municipality/City (Vicinity Map showing sitio, barangay, municipality, province and region boundaries and total project area to be covered. Attach location and vicinity maps and photographs of the project site as ANNEX 1.) ____________________________________________________________________ ____________________________________________________________________ ____________________________________________________________________ Geographic coordinates of project area: Longitude : ___________________ Latitude : ___________________ 1.2 PROJECT RATIONALE: Cite and focus on the need for the project based on national and local economic development and in terms of contribution to sustainable development agenda and current development thrusts of the Philippines. ____________________________________________________________________ ____________________________________________________________________ ____________________________________________________________________ _________
2 IEE Checklist Report for Fishery/Aquaculture Project
1.3 PROJECT ALTERNATIVES: Reasons for selection of preferred option (please check): Technology Facility Siting Development Design Process/Technology Selection Resource Utilization Others Commercial Environmental Others
1.4 PROJECT COMPONENTS No. of Units / Size Equipment/Support Facility Feeders Weighing Scales Aerators Pumps Harvest Equipment Personnel Complement/s Vehicles Supply Gates/Canals Drainage Gates/Canals (Use additional sheet, if necessary.) Support Facilities: No. of Units Pollution Control Device Facilities Being Served Specification/Details
(Use additional sheet, if necessary.) 1.5 PROCESS/ TECHNOLOGY OPTIONS Culture Species: Type of Aquaculture: Level of Culture: PRODUCTION PROCESS 1. Hatchery ______________________________ Pond Extensive Cage Pen Intensive
Semi-intensive DETAILS
2. Nursery
3. Rearing Operation
Water Supply Community Water Demand : [ ] dry season ____ m /sec [ ] rainy season ______ m /sec [ ] annual _____ 3 m /sec Water Source [ ] surface water S/W Type : [ ] river (Name: _____________) [ ] rainwater collector [ ] ___________ [ ] ground water G/W Type: [ ] well [ ] spring [ ] others: ____________________________ Location of water source ____________________________________________________________________________ (Sitio/Zone, Barangay, Municipality/City, Province, Region) Water source flow: a) dry season flow: _______ m 3/sec b) rainy season: _______ m 3/sec Percent & Flow of water source to be tapped: a) dry season: ___ % (_____ m3/sec) b) rainy season: ___% (___ m 3/sec) c) annual: ___% (___ 3 m /sec) Location of communal water box/faucet area: ____________________________________________________________ (If water box/faucet area is to be provided) (Lot Number, Street, Sitio/Zone, Barangay, Municipality/City, Province, Region) Communal box/faucet surface area: _____ m 2 ______ m Pipe length from source to water box: _____ m Volume :_______ m3 Distance of box from source:
3 3
Overflow of Concrete Water Box: ____ m (height) Target overflow: dry season____ m 3/sec; rainy season ____m3/sec
Power Supply
Sources of Power Supply Local Electric Utility Generator Others, please specify
Yes
No
Type of Source of Waste Waste Liquid2 Air Dust Noise Solid2 (Use additional sheet, if necessary.) 1.6 PROJECT SIZE Total Land Area to be occupied: Is the area owned or leased: If leased, period covered:
Expected production volume per growing season: _______________ Harvest Size: ___________________ Harvest Weight: _________________
DEVELOPMENT PLAN, DESCRIPTION OF PROJECT PHASES AND CORRESPONDING TIMEFRAMES Pre-Operation/ Construction phase3 Construction Schedule ACTIVITY Plans/Design Permits/ Clearances Site Preparation Civil Works Finishing Site Clearance Installation Commissioning & Start-up Operation
(Use additional sheet if necessary. Include civil works undertaken as part of the project, e.g., Construction of office for operation, administration, canteen, and other amenities.) Operation Phase Provide brief discussion on the project operation: __________________________________________________________________________ __________________________________________________________________________ __________________________________________________________________________ __________________________________________________________________________ __________________________________________________________________________
Abandonment Phase and schedule Decommissioning Activities Waste Generated Mode of Disposal Restoration Plan
Removal wastes
EMB authorized
recyclers
Dismantling of
structures and equipment
EMB authorized
recyclers
(Use additional sheet, if necessary.) 1.8 MANPOWER Manpower Requirement Expertise/Skills No. of Women No. of Men Total
I.
Environmental Impact Management Plan Project Phase / Possible Baseline Data Activities Environmental/ Parameter Social Impacts
Pre-construction phase Site Selection and Ecological problems Current water use: Planning/ resulting from Commercial/ Institutional Design clearing for Industrial conversion of coastal wetlands to fishponds Agricultural/ Recreational Protected Ares Construction Phase Installation of Equipment / Construction
Cost of Mitigation/ Monitoring (Assumed to be integrated in project cost per project phase)
Prohibition of ponds
in areas of ecological significance
Limitation of area
converted to fishponds
Pond construction
during dry season
Presence of slope
protection in erosionprone areas
Stabilization of
embankment with grasses or other soil cover
Presence of new
eroded areas near the site
Designate a Spoils
Storage Area, with topsoil set aside for later use and allow maximum re-use of spoils
Noise generation
from heavy equipment & generator
Undertake proper
maintenance of equipment and use mufflers
Tolerable noise levels No cost for scheduling; in residential areas Mufflers/silencers integral Presence of schedule component of equipment
of equipment movement and purchase/maintenance
Schedule equipment
movement during construction activities 81-85 dB non-peak hours of # public complaints 86-90 dB daytime vehicular received by traffic 91-95 dB Proponent/ Contractor Minimize night-time 96-107 dB construction Others, specify________ activities Frequency : ___________ Provide housing for
Construction Cost:
Provide
Release of drain
water into receiving waters after prior treatment or adequate dilution; more frequent water change and flushing
TSS: _________ g/NCM Oil and grease BOD: _________ g/NCM DO: _________
Reduction of water
supplies for competing uses such as irrigation or domestic use.
Streamflow
measurement/ mean monthly data
Water resource
use/balance _____________________ _______
ponds to avoid disruption of traditional water uses; careful planning and design
Water resource
use/balance
Restriction of water
circulation, obstruction to navigation by fishpens/cages, reduction of stream capacity from siltation
Baseline data of
freshwater / marine environment
Spread of disease
and parasites from exotic cultured species or from escape of pond fish to the wild
10
Increased public
health risks due to the increased incidence or introduction of waterborne or water related diseases.
Vector eradication
program; public health and information program; disease prophylaxis and treatment
Flooding/Drought
Streamflow
measurement/mean monthly data ____________________
Improve efficiency of
water supply/irrigation systems
Physico-chemical characteristics of springs and wells Bacteriological characteristics of wells and springs Identify sources of threat/hazards
Protect water
recharge areas to preserve quality and quantity
Increase, when
practical, storage capacities of water supply structures for resilience to greater variations and extremes
In critical areas,
develop flood plan maps, including climate change projections, and zoning measures to limit/restrict development activities
11
Generation of solid
waste from the project activities/ operations
Implementation of
the Ecological Solid Waste Management Plan (ESWMP);
Presence of
waste/recycling bins for segregation
Implementation cost of
ESWMP:
Re-use and
recycling
Absence of mixed
garbage in the facility Frequency :
Adaptation Measures
Cost of Adaptation/ Monitoring (Assumed to be integrated in project cost per project phase)
Occurrence of
flooding
Historical data on flooding Protect water recharge areas to preserve quality Maximum height of flood and quantity recorded _______ cm. (last five years, indicate years) Increase, when practical,
storage capacities of water supply structures for resilience to greater variations and extremes
Review monitoring systems for water levels, flows and water quality rainfall
control facilities to take into account climate change to date and projections; Others, specify___________ ________________ ________________ ___
Construction of flood
12 IEE Checklist Report for Fishery/Aquaculture Project
Others,
Drought
Historical data on drought Highest temperature recorded _____ 0C (last five years, indicate years )
Water conservation techniques e.g. catchment basins/rain water harvesting system Tree planting to alleviate temperature increases Improving water use efficiency, planning for alternative water sources (such as treated wastewater or desalinated seawater), and making changes to water allocation Implementation of drain water system and other water conservation techniques e.g. catchment basins Others, specify______________ ____________________ Heat wave action plan Information program for employees Weather advisories to alert the public about dangerous heat
Effectiveness of water conservation techniques Percent survival of trees planted Improvement on water use efficiency Regular inspection of water harvesting system facilities to ensure sustained availability of water Others, specify___________ ________________ ________________ ___
13 IEE Checklist Report for Fishery/Aquaculture Project
Review and monitor changes in weather pattern Effectiveness of heat wave action plan Ambient
conditions Adequate financial and human public health resources, including training, surveillance and emergency response, and prevention and control programs Installation of green roof Others, specify_________ Establishment of adequate barriers/buffer zone Development of emergency response and disaster preparedness plan Lightning arresters installation Others, specify ____________________ ____________________
Storm surge/Typhoon
Historical record of cyclone occurrences Number of occurrence _______( indicate years) Highest Wave height recorded _____ (indicate year) Average number/year of typhoons entered in the area (5 year data, indicate years)_____________ _________________ _________________ Historical record of tsunami occurrence ____________________
Constant communication with concerned agency Regular monitoring of early warning device and preparedness system to ensure effectiveness Others, specify ________________ ________________
Tsunami
Constant communication with concerned agency Regular monitoring of early warning device and preparedness system to ensure effectiveness Others, specify ________________ ________________
14
Attach map showing specifically identified of air and water sampling points
(Use Additional Sheets if applicable) III. INSTITUTIONAL PLAN FOR EMP IMPLEMENTATION Organization Chart:
15
Attach drawing/plan of air pollution source and control installations (with dimensions and descriptions)
16
This is t o certif y that all the inf ormation and commitments in thi s Initial Environmental Examination (IEE) Checklist for the (state name of project)______________ PROJECT are accurate and complete to the best of our knowledge, and that an objective and thorough assessment of the Project was undertaken in accordance with the dictates of professional and reasonable judgment. Should I/we learn of any information which would make this IEE Checklist inaccurate, I shall immediately bring the said information to the attention of DENR-EMB Region _____. I hereby certify that no DENR-EMB personnel was directly involved in the preparation of this IEE Checklist other than to provide procedural and technical advice consistent with the guidelines in the DAO 2003-30 Revised Procedural Manual. I hereby bind myself to answer any penalty that may be imposed arising from any misrepresentation or failure to state material information in this IEE Checklist. In witness whereof, I hereby set my hand this ____ day of __________ ______________________. ____________________ NAME OF PROPONENT HEAD (Position) (Company Name) at
SUBSCRIBED AND SWORN TO before me this _____ day of ____________ 201__, affiant exhibiting his/her Community Tax Certificate No. ___________________ issued at ______________________ on __________________________.
17
T h i s i s t o ce r t if y t hat a l l the inf o r ma ti on a nd c o mm i t men ts in th i s Initial Environmental Examination (IEE) Checklist for the (state name of project)______________ PROJECT are accurate and complete to the best of our knowledge, and that an objective and thorough assessment of the Project was undertaken in accordance with the dictates of professional and reasonable judgment. Should I/we learn of any information which would make this IEE Checklist inaccurate, I shall immediately bring the said information to the attention of DENR-EMB Region _____. I hereby certify that no DENR-EMB personnel was directly involved in the preparation of this IEE Checklist other than to provide procedural and technical advice consistent with the guidelines in the DAO 2003-30 Revised Procedural Manual. I hereby bind myself to answer any penalty that may be imposed arising from any misrepresentation or failure to state material information in this IEE Checklist. In witness whereof, I hereby set my hand this ____ day of __________ ______________________. ____________________ NAME OF PROPONENT HEAD (Position) (Company Name) at
SUBSCRIBED AND SWORN TO before me this _____ day of ____________ 201__, affiant exhibiting his/her Community Tax Certificate No. ___________________ issued at ______________________ on __________________________.
18
This is to certify that all information in Initial Environmental Examination Checklist REPORT for the (state name of project) PROJECT are accurate and complete to the best of our knowledge, and that an objective and thorough assessment of the Project was undertaken in accordance with the dictates of professional and reasonable judgment. Should we learn of any information which would make IEE Checklist REPORT inaccurate, we shall immediately bring the said information to the attention of the DENREMB Region ___. We hereby certify that no DENR personnel was directly involved in the preparation of this IEE Checklist REPORT other than to provide procedural and technical advice consistent with the guidelines in the DAO 03-30 Revised Procedural Manual. We hereby bind ourselves jointly and solidarily to answer any penalty that may be imposed arising from any misrepresentation or failure to state material information in this IEE Checklist REPORT. In witness whereof, I hereby set my hand this ____ day of __________ at ______________________. Name 1. 2. 3. Field of Expertise Signature
SUBSCRIBED AND SWORN TO before me this _____ day of ____________ 2006, affiants exhibiting their Community Tax Certificate information, as follows: Name 1. 2. 3. Community Tax Certificate Information CTC No. Place of Issue Date of Issue
19