Western LRT Capital Cost Estimations

(11 June 2012)


The attached cost estimates provide a basis for comparing the capital costs of the 15 alternative corridors. Please note the following:

The costs were based on the level of information available for all 15 corridors. Further refnements to the costs will be done to the
shortlisted four corridors. Although the fnal total costs are not expected to increase and the ranking of corridors based upon them to
remain the same, how these costs breakdown is likely to change.
The cost for the section between Lincoln Field and Baseline Stations has been considered to be the same for all alternatives. This cost
was based on the assumption that there will be LRT connection between Baseline and Lincoln Fields and BRT connection between
Baseline and Pinecrest. The Pinecrest BRT, including the Connaught tunnel is not part of the WLRT project.
Costs were based on unit costs used for costing the OLRT project, escalated to refect 2011 conditions.
Rolling stock and operating expenses are not included in the estimates.

The cost breakdown is presented in Figure 1 and . The breakdown includes the following elements:
Capital Cost (guideway and track elements, site work & other improvements, stations, drainage and utilities, LRT systems elements);
Property/Infrastructures impacts;
Common Elements (south of LF, landscaping, public art); and,
Engineering.
A further breakdown is provided in Table 2. Please note that although the numbers are presented with a precision to the single dollar value, this is
due to the method of calculation and should not be interpreted as refective of that level of accuracy.

Figure 1: Cost breakdown for individual corridors

Table 1: Cost Breakdown for individual corridors


O1 - Ottawa River
Pkwy

C1 - CarlingVia O- C2 - CarlingVia
Train
Kirkwood

C3 - CarlingVia
Churchill

R1 - ChurchillVia
Richmond

R2 - ChurchillVia
Richmond
(Underground)

R8 - Rochester Field
R4 - ChurchillVia
R6 - Rochester Field R7 - Rochester Field Via
R3 - ChurchillVia Carling/Woodroffe R5 - Rochester Field Via Richmond
Via
Carling/Woodroffe R9 - Cleary ORP
Carling/Woodroffe (Underground)
Via Richmond
(Underground)
Carling/Woodroffe (Underground)
Richmond

R10 - Cleary ORP Richmod R11 - Cleary/ORPVia


(Underground)
Carling/Woodroffe

Capital Work

379,200,000 $ 1,749,200,000 $ 1,749,300,000 $ 1,534,800,000 $

862,300,000 $ 1,612,300,000 $ 1,325,600,000 $ 1,941,400,000 $

621,400,000 $ 1,189,900,000 $ 1,093,300,000 $ 1,488,300,000 $

736,800,000 $

1,022,800,000 $ 1,245,500,000

Property/Infrastructure Impacts

35,300,000 $

66,500,000 $

70,000,000 $

39,800,000 $

18,500,000 $

18,700,000 $

19,400,000 $

19,500,000 $

20,300,000 $

20,500,000 $

21,700,000 $

26,200,000 $

24,300,000 $

24,300,000 $

29,700,000

Common Elements (south of LF/bus loops/ped access)

62,000,000 $

61,800,000 $

61,800,000 $

61,800,000 $

61,800,000 $

61,800,000 $

61,800,000 $

61,800,000 $

61,800,000 $

61,800,000 $

61,800,000 $

61,800,000 $

61,800,000 $

61,800,000 $

61,800,000

Engineering

86,000,000 $

338,900,000 $

339,600,000 $

295,400,000 $

176,500,000 $

305,600,000 $

263,500,000 $

365,100,000 $

131,800,000 $

229,600,000 $

220,400,000 $

284,500,000 $

154,100,000 $

200,200,000 $

250,400,000

TOTAL

562,500,000 $ 2,216,400,000 $ 2,220,700,000 $ 1,931,800,000 $ 1,119,100,000 $ 1,998,400,000 $ 1,670,300,000 $ 2,387,800,000 $

835,300,000 $ 1,501,800,000 $ 1,397,200,000 $ 1,860,800,000 $

977,000,000 $

1,309,100,000 $ 1,587,400,000

Table 2: Detailed cost breakdown for individual corridors


O1 - Ottawa River
Pkwy

C1 - CarlingVia OTrain

A GUIDEWAY &TRACK ELEMENTS

B SITEWORK & OTHER IMPROVEMENTS

1,285,200 $

C STATIONS

D DRAINAGE & UTILITIES

C2 - CarlingVia
Kirkwood

153,414,215 $ 1,047,491,099 $

C3 - CarlingVia
Churchill

R1 - ChurchillVia
Richmond

R2 - ChurchillVia
Richmond
(Underground)

R8 - Rochester Field
R4 - ChurchillVia
R6 - Rochester Field R7 - Rochester Field Via
R3 - ChurchillVia Carling/Woodroffe R5 - Rochester Field Via Richmond
Via
Carling/Woodroffe R9 - Cleary ORP
Carling/Woodroffe (Underground)
Via Richmond
(Underground)
Carling/Woodroffe (Underground)
Richmond

R10 - Cleary ORP


Richmod
(Underground)

R11 - Cleary/ORP Via


Carling/Woodroffe

819,372,285 $

675,323,025 $

383,433,443 $

613,362,696 $

608,450,109 $

836,817,952 $

330,798,285 $

448,588,265 $

541,496,729 $

652,117,243 $

286,096,351 $

334,795,830 $

521,729,749

7,099,400 $

5,364,800 $

4,208,400 $

1,244,600 $

1,244,600 $

739,200 $

739,200 $

1,244,600 $

1,244,600 $

739,200 $

739,200 $

1,244,600 $

1,244,600 $

739,200

48,941,788 $

44,785,216 $

267,929,508 $

273,239,344 $

169,631,952 $

411,012,280 $

278,549,180 $

399,239,344 $

48,941,788 $

290,322,116 $

157,859,016 $

278,549,180 $

169,631,952 $

290,322,116 $

278,549,180

72,352,650 $

89,871,615 $

80,840,644 $

27,591,267 $

72,260,903 $

38,564,635 $

96,030,158 $

21,115,896 $

53,365,561 $

52,173,184 $

74,013,127 $

31,436,667 $

46,238,631 $

65,125,181

E SYSTEMS ELEMENTS

53,886,727 $

69,823,962 $

58,522,033 $

57,625,920 $

52,765,880 $

52,765,880 $

55,324,055 $

55,324,055 $

51,915,858 $

51,915,857 $

54,999,032 $

54,474,033 $

51,486,793 $

51,486,792 $

54,044,968

F PROPERTIES / INFRASTRUCTURES IMPACTS

31,364,592 $

59,080,535 $

62,215,677 $

35,356,625 $

16,427,032 $

16,647,470 $

17,235,434 $

17,311,770 $

18,072,853 $

18,194,934 $

19,290,265 $

23,292,650 $

21,563,266 $

21,632,623 $

26,388,803

G COMMON ELEMENTS

55,100,654 $

54,965,654 $

54,958,154 $

54,958,154 $

54,958,154 $

54,958,154 $

54,958,154 $

54,958,154 $

54,958,154 $

54,958,154 $

54,958,154 $

54,958,154 $

54,958,154 $

54,958,154 $

54,958,154

Engineering

25%

85,998,294 $

338,899,629 $

339,558,518 $

295,388,028 $

176,513,082 $

305,562,996 $

263,455,192 $

365,105,158 $

131,761,859 $

229,647,372 $

220,378,895 $

284,535,897 $

154,104,446 $

200,169,687 $

250,383,809

Landscaping

10% to 20%

68,798,635 $

135,559,852 $

135,823,407 $

118,155,211 $

70,605,233 $

122,225,198 $

105,382,077 $

146,042,063 $

52,704,743 $

91,858,949 $

88,151,558 $

113,814,359 $

61,641,778 $

80,067,875 $

100,153,523

PUBLICART

1%

3,439,932 $

13,555,985 $

13,582,341 $

11,815,521 $

7,060,523 $

12,222,520 $

10,538,208 $

14,604,206 $

5,270,474 $

9,185,895 $

8,815,156 $

11,381,436 $

6,164,178 $

8,006,787 $

10,015,352

5% to 15%

17,199,659 $

203,339,777 $

203,735,111 $

177,232,817 $

70,605,233 $

183,337,797 $

105,382,077 $

219,063,095 $

52,704,743 $

137,788,423 $

88,151,558 $

170,721,538 $

61,641,778 $

120,101,812 $

100,153,523

Construction Complexity
ESTIMATEDTOTAL COST
Class D Additional allowance
TOTALCOST

$
12.5%

$
$

519,429,697 $ 2,046,953,759 $ 2,050,933,448 $ 1,784,143,689 $ 1,030,836,400 $ 1,845,600,494 $ 1,538,578,319 $ 2,205,235,157 $


42,999,147 $

169,449,815 $

169,779,259 $

147,694,014 $

88,256,541 $

152,781,498 $

131,727,596 $

182,552,579 $

562,428,844 $ 2,216,403,574 $ 2,220,712,707 $ 1,931,837,703 $ 1,119,092,941 $ 1,998,381,992 $ 1,670,305,914 $ 2,387,787,736 $

769,489,254 $ 1,387,070,127 $ 1,287,012,748 $ 1,718,596,817 $


65,880,929 $

114,823,686 $

110,189,448 $

142,267,948 $

835,370,183 $ 1,501,893,813 $ 1,397,202,196 $ 1,860,864,765 $

899,969,963 $ 1,209,024,908 $ 1,462,241,442


77,052,223 $

100,084,843 $

125,191,904

977,022,186 $ 1,309,109,751 $ 1,587,433,346