Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
IPPs
ZPC
ZETCO
ZEDC
ZESA Enterprises
PowerTel
Hydro
750 MW
750 MW
Thermal
270 MW 1 940 MW
170 MW 1 700 MW
MOZAMBIQUE
HARARE
Bindura
HWANGE 920 MW
MUNYATI
Orange Grove
BULAWAYO
Insukamini Marvel Tokwe
Plumtree
Triangle
Beitbridge
BOTSWANA RSA
JUSTIFICATION
Demand and Energy Forecast for Zimbabwe (2005 2011)
16000 14000 12000 10000 3100 2600 2100 1600 1100 600 100 -400 2002 2003 2004 2005 2006 Year 2007 2008 2009 2010 2011
Gwh
MW
MOZAMBIQUE
HWANGE EXPANSION
3I5 km
Empress
LUPANE CBM
183 km 182 km
Tokwe
40km
Triangle
Beitbridge
BOTSWANA RSA
MOZAMBIQUE
Alaska
200 km
255 km 3I5 km
Empress
Ngezi I50 km
Osborne Mini Hydro
LUPANE
182 km
Sherwood Haven
183 km 310km
CONDO
60 km
Tokwe
Siya Mini Hydro
Plumtree
40km
280 km
Triangle
Beitbridge
BOTSWANA RSA
- Increase in Demand Against Limited Growth in Supply - New Imports Contracts Required Annually in Constrained Supply Situation (2005-2007)
Gabon
Kenya Nairobi
Brazzaville
H
Tanzania
H H
Luanda
H
Angola
Malawi Zambia
SAPP GRID
Lilongwe
H H H H H T
Mozambique
Lusaka
H H H T H H H
Harare
Zimbabwe
ETET ET ET ET ETET ET ET ET ET
H T
Lesotho
H
Hydro station Pumped storage scheme Thermal Station Eskom thermal station
Cape Town
N P
GENERATION EXPANSION PROJECTS JUSTIFICATION To meet growing requirements of the economy (EREP, EEUID, New Mines, ) Replace ageing power plants Alternative to hydro generators prone to drought (Hydrological Risk) in the SAPP (SADC) Region
GENERATION EXPANSION PROJECTS JUSTIFICATION The least-cost generation option for commissioning in three years Largest IPP in SADC (SAPP) when completed Premium power exports to SAPP post 2007 Large coal deposits (30 billion tonnes reserves)
COALFIELDS IN ZIMBABWE
PRODUCTION HISTORY
COAL PRODUCTION TRENDS
7000000 6000000 5000000 4000000 3000000 2000000 1000000 0
1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004
HPS
HCC
TOTAL COAL
3.9m thickness for underground mining 2.4m thickness for open cast mining Ash Content below 13%
THANK YOU
Dema
HWANGE
Munyati P/S
Orange Grove
Tokwe
BOTSWANA
KEY EXISTING POWER STATION EXISTING PRIMARY TRANSMISSION SYSTEM Triangle
RSA
SITE LOCATION
Fuel Supplier
Fuel
FSA
Project Company Service Money s $ Plant Supplier O & M Contractor
Money $
Power Purchaser
Revenue $
Power GWh
(IPP)
PPA
Capital
Plant
PPC
O&M
THANK YOU
GOVERNMENT INCENTIVES
1. Independent Energy/Price Regulation 2. Tax Holidays for new investment 3. Dividend and Profit Repatriation 4. Other investment incentives