ntil about ten years ago, testing the insulation on medium- and highvoltage power cable was straightforward. DC high potential tests were the industry norm. DC high potential testing was developed in the days of oil-paper insulation, and because of the simple and easy-to-use equipment, continued to be used when extruded cables arrived. However, as extruded cables became widespread, it was noticed that although some cable systems passed the dc high potential test, they failed shortly after being put in service. Suspicions arose, particularly with aged polyethylene insulation, that the dc high potential test was somehow damaging the insulation. These suspicions were confirmed by an EPRI study published in the early 1990s. Many testing agencies and utilities stopped performing routine dc high potential tests on aged extruded cables. NETA, in its testing specifications, reflects the concern by limiting the dc overpotential maximum test voltage for cables less than five years after installation and by not recommending dc high potential testing for those over five years in service. In response to the changes in cable test requirements and increasing age of the cable systems in North America and Europe, manufacturers and service organizations are developing many new forms of cable testing. So many techniques have come on the market, that electrical testers are overwhelmed and often confused. In this article, I will discuss the cable field-testing standards developed or under development by the IEEE Insulated Conductors Committee. I will summarize where I see cable field testing is now and were it is heading.
WG C-15 has completed balloting and the IEEE Standards Association issued IEEE 400, IEEE Guide for Field Testing and Evaluation of the Insulation of Shielded Power Cable Systems. This guide is an omnibus document covering cable insulation field testing in general. The overview of this guide defines two types of field tests: Type 1 field tests, or withstand tests, are intended to detect defective parts and allow for replacement or repair. These tests are usually achieved by application of a moderately increased voltage across the insulation for a prescribed duration. These are pass/fail tests performed after installation or repair. Type 2 field tests, also called diagnostic tests or condition assessments, determine the health of cable system insulation or locate discrete defects that may become failures in the future. These tests are usually performed by means of moderately increased voltages applied for relatively short duration or by means of low voltages. While Type 2 insulation tests are conducted, other parts of the system such as jackets, shields, and connectors may also be diagnosed. Fall 2006 NETA WORLD
www.netaworld.org
IEEE 400 provides a summary of the various insulation test methods, gives the advantages and disadvantages of each, and sets the stage for a series of more detailed guides covering each insulation test method. At this time three additional working groups of the ICC are meeting and covering dc, very low frequency (VLF), and partial discharge (PD) testing in detail.
Loss current harmonics Leakage current PD measurement When this guide was published research was still continuing on the VLF withstand levels and durations and on the interpretation of the various diagnostic methods. The conclusions of the guide state, VLF testing techniques, along with other test techniques, are continuing to improve and develop. Meaningful interpretation of the test results will require development of a database to better define acceptance criteria. With this in mind, the WG C-18 continues to meet at the ICC meetings with the objective of reviewing research and examining data from ongoing VLF test programs. The working groups purpose is to improve the VLF guide.
As covered in this guide, VLF can be used in both Type 1 or Type 2. VLF test voltage withstand levels are provided in tables in the guide for installation, acceptance, and maintenance withstand tests. The recommended testing time varies between 15 to 60 minutes. There are a number of diagnostic tools that are used with VLF testing as detailed in IEEE 400.2. The methods as used with each waveform along with the advantages and disadvantages are given. The diagnostic methods for VLF include: Dissipation-factor (tan delta) measurement Differential dissipation-factor measurement Dielectric spectroscopy
Figure 1 Corroded taped shield leading to failure
www.netaworld.org
improvements may occur as more data are collected, test and analysis procedures are standardized, and if measurements on particular cable circuits are repeated on a periodic basis, i.e., trending.
5. A partial discharge test of some type. Many of the off-line or on-line PD tests discussed in the IEEE guide 400.3 soon to be published are designed to detect and locate low-level PD along the cable and in accessories. There are handheld ultrasonic and RF, PD detectors that can find more serious PD in exposed accessories and accessible parts of the cable. Some utilities and service organizations are using these devises to locate serious levels of PD. See Figure 2.
I see no single, silver bullet diagnostic test in the future. Cable systems are complex with many parts which require multiple tests to analyze completely. However as more data is gathered and published, particularly with the insulation quality and PD tests (Items 4 and 5 above), we will more reliably locate possible failure sites and provide a better estimate of remaining cable life.
2. Metallic shield continuity or resistance measurement. These can be followed by TDR or surface potential measurement to determine the extent and location of shield corrosion or breaks. 3. A jacket insulation resistance test between shield and ground to determine if there are jacket breaks. 4. An overall insulation quality test using a form of lower voltage, short duration dc test, or a VLF diagnostic like stepped dissipation factor or leakage current. These types of tests can determine the extent of insulation damage including water treeing, especially if tests are made periodically and trending is noted. www.netaworld.org
Vern Buchholz has over 25 years experience in the electrical industry. He came to Powertech Labs in 1984 from the Transmission Engineering Group at BC Hydro. He was the Director of the Electrical Technologies Business Unit at Powertech Labs from 1994 until his retirement in 2006. Verns projects include work on medium and high voltage cables and accessories, grounding apparatus, electrical connectors, commercial electrical equipment and high impedance fault detection. He is a Professional Engineer registered in the Province of British Columbia, Canada. He is a Senior Member of the IEEE and very active in the Insulated Conductors Committee of the PES. He presently works as an electrical engineering consultant.