Post-Fukushima

Where is Nuclear Plant Expenditure Headed?


Susan Landahl
Senior Vice President and Chief Operating Officer

Exelon Nuclear
March 29, 2012

Exelon's ten stations - with 17 reactors 12 BWRs/5 PWRs represent approximately 20 percent of the U.S. nuclear industry's power capacity.

The Merged Company

Fukushima Lessons Learned

Spent fuel cooling and makeup Extended loss of AC power External events - earthquake, tsunami, flooding, etc. Hydrogen control Emergency response Aggressive actions taken by US utilities; united approach led by NEI; alignment with INPO

Fukushima Actions

Exelon Action Plan


Exelon Independent Expert Team

NEI

NRC

INPO
SECY-11-0137
FINAL
Recommended Actions to be Taken Without Delay from the Near-term Task Force Report Dated 9/9/11

Task Force
Near-term Task Force Review of the Insights from the Fukushima Daiichi Accident

SECY-11-0124
INITIAL
Recommended Actions to be Taken Without Delay from the Near-term Task Force Report Dated 9/9/11

IER L1-11-1 B.5.b and External Events


(4/15/11)

IER L1-11-2 Spent Fuel Pool Cooling


(9/23/11)

IER L1-11-4 Extended Loss of AC


(11/28/11) (1/27/12)

North Anna (Seismic)

IER L1-11-1 Supplement 1


B.5.b/SAMG Programmatic Controls, PM Program, Training and Qualification Due Date: 3/1/12

Exelon Fukushima Organization Vice President Sponsor Severe Accident Management Director Engineers
Electrical Structural Mechanical Seismic Flooding PRA

Project Management Procedure Writers EOP/SAM-G Emergency Planning Regulatory Affairs

IER 11-1 IER 11-1, Provide near-term assurance of high state of readiness to respond to both design basis and beyond design basis events
Verify existing capability to mitigate design events Verify existing capability to mitigate SBO Verify capability to mitigate internal/external flooding Walk downs/inspections of equipment needed to mitigate fire and flood events for potential that function could be lost during seismic events

IER 11-1, Supplement 1


Conduct drills/exercises to periodically exercise elements of B.5.b, SBO, and SAMGs Conduct periodic walk downs/inspections mitigating equipment Periodically verify contract/agreements Include SAMGs in configuration change processes Program controls for qualification to SAMGs

IER 11-2 IER 11-2, Spent Fuel Pool Loss of Cooling and Makeup
Increase the sensitivity to spent fuel storage event response
1. Verify shutdown safety provisions applied to SFP during outage 2. Apply increased protection for SFP during operating modes while heat load remains high 3. Provide time to saturation conditions to control room and emergency response staff 4. Abnormal operating procedures address loss of cooling and makeup 5. Emergency procedures contain precaution for monitoring SFP level and temperature

IER 11-4 IER 11-4, Extended Loss of AC Power Exelon Assessments


BWRs
Extend IC/RCIC operation until temporary equipment is installed for RPV makeup and DC power Reduce RCP seal leakage, AFW SG makeup, install temp EDG to maintain DC power Temporary Equipment
o o o o Temp diesel pumps, generators Modify plant to install electrical and mechanical quick connects Refuel temp equip capability Reasonable protection storage Off-site Satellite phones with antenna to control room Additional batteries and charging station On-site Station radios Additional batteries and charging station

PWRs

Common Actions

Communications
o

NRC RFI/Orders 2.1 Seismic/External Flooding Hazard Re-evaluation - RFI response 6/12 2.3 Seismic/External Flooding Walk downs - RFI 6/12 Complete walkdowns 9/12 4.2 Mitigating Strategies - Order response 2/13 5.1 Containment Vents - Order response 2/13 7.1 SFP Instrumentation - Order response 2/13 9.3 EP Staffing and Communications Staffing - RFI Response 6/12 Communications - RFI 5/12 Site Communications Assessment 9/12

10

In Summary

11

Fukushima has clearly changed the world Our task is to make it a change for the better Industry alignment and cooperation with INPO, NEI will continue to be critical Fleets clearly have an advantage since the issues can be very complex Specific cost estimates are still to be determined challenging but manageable