CHOCKFAST RED
AFTER PLACEMENT
Clean spillage of grout on base plate and foundation with water, while it is wet. Clean mixers, tools with water after completing the job. After the grout is fully cured, remove the shading, formwork & leveling screws (Refer to Bulletin 617).
Use a hand-held pneumatic chipping hammer with a chisel bit to remove laitance
A good surface profile will expose a high percentage of the course aggregate Strongest part of the foundation Best link for the grout
MIN. 50mm
Install 450 chamfer strips at all corners and along all sides of formwork at a minimum elevation of 15mm above the bottom of the base plate, or as advised by the Machinery OEM (to ensure grout makes good contact with bottom of base plate).
15mm above bottom of base
Install expansion joints every 1.5 to 2M (5 to 7 ft.) along the exposed portion of grout between the forms and base plate; install head boxes between these joints for placement.
Waxing form work & head box between exp. joints for easy removal
In hot weather ( >350C ambient temp.), erect a shade over the foundation 48 hours before grouting.
Keep Chockfast Red components and mixing equipment under the shade
Pour the Hardener into the Resin can and mix for 3 to 4 minutes with a slow-speed drill at 200 - 250 rpm with Jiffy Mixer attachment.
Mix liquids using a low-speed drill & Jiffy mixer for 3 to 4 minutes
the mixed liquids into a small concrete mixer as shown here. Add 4 bags of aggregate one at a time until all the aggregate is wetted out. Use only 3 bags for the first unit when starting up, as some of the liquids are used for wetting out the drum of the mixer.
Fill all Anchor Bolt pockets and let the grout cure before starting the skid or base grouting
Section A - A
Construct wooden forms around perimeter of the foundation. Support as required. Apply 3 coats of paste wax to inside. Install Styrofoam Expansion Joints as shown. After grout cures, remove " of foam and fill with Expansion Joint Compound.
1.5 to 2 M (5 to 7 ft.)
1.5 to 2 M (5 to 7 ft.)
Not To Scale
Head Box
Not To Scale
Pour until the grout reaches the level of the chamfer strip
Grout has almost reached the final elevation of the chamfer strips
Clean spillage of grout on base plate & foundation with water, while it is wet. Clean mixers, tools with water after completing the job