Sei sulla pagina 1di 18

Jebel Aulia An innovative concept of renewable energy generation

www.hydromatrix.com
www.vatech-hydro.com
1

What is HYDROMATRIX
A solution for low head sites with existing dam and weir structures Many small units instead of conventional sized turbines Not a typical small hydro application A very feasible hydropower system, investment cost approx. 900 1,800 USD / kW Innovative application of proven technologies

www.vatech-hydro.com
2

HYDROMATRIX Benefits
Clean & environmentally friendly energy (KYOTO-protocol) Use of existing weir structures no civil construction no geological risk no additional land usage Standardized modular concept Compressed project schedule HYDROMATRIX modules removeable at flood conditions Keep existing river flow pattern High availability

www.vatech-hydro.com
3

HYDROMATRIX Application criteria


Available plant discharge from ~ 60 m/s Available head from 3 m up to 10 m Minimum submergence 1.5 m below tailwater Unit output from 200 kW up to ~ 700 kW Close grid connection Structure available & suitable for HYDROMATRIX

www.vatech-hydro.com
4

HYDROMATRIX Application range

Head Head 3 10 m 3 --10 m Submergence Submergence > 1.5 m > 1.5 m Flow Flow > 60 m/s > 60 m/s

www.vatech-hydro.com
5

HYDROMATRIX Potential Applications

Navigation dams

Irrigation dams

Intake towers

Shiplocks

www.vatech-hydro.com
6

HYDROMATRIX Experience Irrigation Dams - Jebel Aulia, Sudan


Client: National Electricity Corp. D = 1,120 mm n = 375 rpm H = 5.5 m Ptu = 380 kW 80 units in 40 modules Ptotal = 30.4 MW Existing barrage on the White Nile Contract award: 2000 Commissioning: 2004

www.vatech-hydro.com
7

HYDROMATRIX Experience Irrigation Dams - Jebel Aulia, Sudan


Client: National Electricity Corp. D = 1,120 mm n = 375 rpm H = 5.5 m Ptu = 380 kW 80 units in 40 modules Ptotal = 30.4 MW Existing barrage on the White Nile Contract award: 2000 Commissioning: 2004

www.vatech-hydro.com
8

HYDROMATRIX Experience Irrigation Dams - Jebel Aulia, Sudan


Client: National Electricity Corp. D = 1,120 mm n = 375 rpm H = 5.5 m Ptu = 380 kW 80 units in 40 modules Ptotal = 30.4 MW Existing barrage on the White Nile Contract award: 2000 Commissioning: 2004
www.vatech-hydro.com
9

HYDROMATRIX Experience Jebel Aulia, Sudan

Status: October 2003

www.vatech-hydro.com
10

HYDROMATRIX Experience

Jebel Aulia, Sudan

Status November 2003


www.vatech-hydro.com
11

HYDROMATRIX Experience

Jebel Aulia, Sudan

www.vatech-hydro.com
12

HYDROMATRIX Experience

Jebel Aulia, Sudan

www.vatech-hydro.com
13

HYDROMATRIX Experience

Jebel Aulia, Sudan

www.vatech-hydro.com
14

HYDROMATRIX Experience

Jebel Aulia, Sudan

www.vatech-hydro.com
15

HYDROMATRIX Experience

Jebel Aulia, Sudan

www.vatech-hydro.com
16

HYDROMATRIX Experience

Jebel Aulia, Sudan

www.vatech-hydro.com
17

HYDROMATRIX Contact worldwide http://www.hydromatrix.com


For more information about HYDROMATRIX please contact:

Harald SCHMID
HYDROMATRIX Coordination
VA TECH HYDRO A - 4031 Linz, Austria Lunzerstrasse 78 Phone: Fax: E-mail: +43 (732) 6987 3343 +43 (732) 6980 2554 harald.schmid@vatech-hydro.at

Websites: http://www.hydromatrix.com http://www.vatech-hydro.com

www.vatech-hydro.com
18

Potrebbero piacerti anche