MECHANICAL COMMISSIONING STANDARD CHECKLIST STATION : NTPC - RSTPS 1 X 500 MW PLANT ITEM: LONG RETRACTABLE SOOT BLOWERS PLANT

NOMENCLATURE : SYSTEM: ITEM ACTIVITY SHEET 01 OF 03

Ref No : UNIT NO : 7 STATUS REMARKS YES/NO

1 2 3

Access to the plant item is adequate. Illumination in the plant area is adequate. Any other requisite safety provision is adequate for the immediate commissioning activity. Plant item is in cleaned condition. All necessary locks and keys for padlocks , interlocks etc. are available. Hot surfaces lagged or screened sufficiently to provide protection for personnel.

4 5

MECHANICAL COMMISSIONING STANDARD CHECKLIST SHEET 02 OF 03 PLANT ITEM: LONG RETRACTABLE SOOT BLOWERS PLANT NOMENCLATURE : Ref No : SYSTEM: UNIT NO : 7 ITEM ACTIVITY STATUS REMARK YES/NO
1 General conditions satisfy the site standing Instructions listed in the "Plant Item Commissioning Essential Pre-requisites"

(SCL MS - I/1).
2 The name plate legend agrees with the approved NTPC Plant Nomenclature and is clearly visible, securely fixed, durable and correlates with remote labels. The installation is complete and correct in accordance with the latest drawings. Access for adjustments, maintenance and repairs is satisfactory. Check the blower number with reference to the location drawing to ensure the installation of correct blower in correct location. The rotary and traverse powerpacks are flushed and then filled with the recommended lubricant. Check that the lubrication of travelling parts is carried out (servogom HTXX) Check that there is no rusting on chains and sprocket and the lubrication is carried out. Check for the accessibility of the hand crank for manual operation. Check for proper tensioning of chains. Check whether stop pin is present on the cam bracket. Check the position of valve opening cam. Check the terminal box is properly covered to prevent any ingress of water.

4 5

9 10 11 12 13

MECHANICAL COMMISSIONING STANDARD CHECKLIST PLANT ITEM: LONG RETRACTABLE SOOT BLOWERS PLANT NOMENCLATURE : SYSTEM: ITEM ACTIVITY
14 Check the proper slope consideration is given, as per drawing, for horizontal and vertical expension of the boiler when the unit is working (valves to be supplied by the erection staff). Check the refractory filling in the seal box is done.

SHEET

03 OF 03

Ref No : UNIT NO : 7 STATUS REMARK YES/NO

15

Agency NTPC Erec. Elec. Mech. C&I Elect. Mech. C&I Erec. Commg.

Name

Signature

Date

BHE NTPC L Comg.

MECHANICAL COMMISSIONING STANDARD CHECKLIST SHEET 01 OF 02 STATION : NTPC - RSTPS 1 X 500 MW PLANT ITEM: WATER WALL SOOT BLOWERS PLANT NOMENCLATURE : Ref No : SCL MS-1/1 SYSTEM: UNIT NO : ITEM ACTIVITY STATUS REMARKS YES/NO
1 2 3 Access to the plant item is adequate. Illumination in the plant area is adequate. Any other requisite safety provision is adequate for the immediate commissioning activity. Plant item is in cleaned condition. All necessary locks and keys for padlocks , interlocks etc. are available. Hot surfaces lagged or screened sufficiently to provide protection for personnel.

4 5

MECHANICAL COMMISSIONING STANDARD CHECKLIST SHEET 02 OF 02 STATION : NTPC - RSTPS 1 X 500 MW PLANT ITEM: WATER WALL SOOT BLOWERS PLANT NOMENCLATURE : Ref No : SYSTEM: UNIT NO : 7 ITEM ACTIVITY STATUS REMARK YES/NO 1 General conditions satisfy the site standing Instructions listed
in the "Plant Item Commissioning Essential Pre-requisites"

(SCL MS - I/1).
2 The name plate legend agrees with the approved NTPC Plant Nomenclature and is clearly visible, securely fixed, durable and correlates with remote labels. The installation is complete and correct in accordance with the latest drawings. Access for adjustments, maintenance and repairs is satisfactory. Check the blower number with reference to the location drawing to ensure the installation of correct blower in correct location. 5 Check the perpendicularity of wall sleeve and swivel tube(90 + 30) (Certificate from erection personnel to be obtained) Check the accessibility for hand crank and the switch box assembly Check that the soot blower piping adjacent to the blower is supported on boiler steel and is not likely to foul with structural steel when the boiler expansion will take place. The rotary and traverse gear boxes are thoroughly flushed and filled with the recommended lubricant. 9 10 12 Check that the lubrication of the linkages is properly carried out. Check that the stop nuts are in place on the guide rods. Check that the drain holes in the motor frames point downwards and are open The SBV head valve is serviced for proper opening and closing. Check that the blower, before starting or at the end of its operation is in the correct parking position. Check that a minimum clearance of 1 mm is maintained between the drive screw and SBV head valve stem (to ensure tight valve seating).

3 4

7 8

13

14 15

NTPC Erec.

16 Check the refractory filling in the seal box is done. Name Agency Elec. Mech. C&I Elect. Mech. C&I Erec. Commg. BHE NTPC L Comg.

Signature

Date

MECHANICAL COMMISSIONING STANDARD CHECKLIST STATION : NTPC - RSTPS 1 X 500 MW PLANT ITEM: PLANT NOMENCLATURE ACTUATOR : SYSTEM: MANUFACTURER : LOCATION: ACTUATOR SETTING Details of actuator MAKE : TYPE : RATING : SL.NO. : S.NO.
1 2 3 4 5

SHEET

01 OF 01

UNIT NO : 7

Details of Servomotor STROKE LENGTH : TRAVEL TIME IN SEC : FULL OPEN TO FULL CLOSE : FULL CLOSE TO FULL OPEN :

STROKE LENGTH OF 'POSITION INDICATOR IN % SERVOMOTOR LOCAL AT FULL CLOSE 0 17 mm 34 mm 51 mm 68 mm(FULL OPEN) 25 50 75 100

AT U C B

SET VALUES TRAVEL TIME IN SECONDS FULL OPEN TO FULL CLOSE : FULL CLOSE TO FULL OPEN :
Agency NTPC Erec. Elec. Mech. C&I Elect. Mech. C&I Erec. Commg. Name Signature Date

BHE NTPC L Comg.