WARNING
1. PUT OIL IN THE NEW VACUUM PUMP.
NOTE
1) Following parts of the internal unit assembly are hard chrome plated. i) Front plate ii) Center, plate -1No.} iii) End plate -1 No.} -1 No.} Hard chrome of 25 micron both side faces. -Do - Do -25 micron in I.D.
2) The solenoid valve suitable for single phase, 220V supply of "AVCON" make is fitted. The input connection is through step down transformer, which takes care of 415 to 440 Volts, 3 input Supply.Thus no separate connections are to be made for starting the solenoid valve. Only 3 supply of RYB connection as input connections should be done at motor inlet connectors. 3) Apart from the solenoid valve, a mechanical not return valve is also fitted in the suction in line. 4) The oil SAE 40 grade or equivalent suitable vacuum oil will be supplied in 3 Containers of 1 liter each for every vacuum pump. These containers are punt in a separate corrugated Box. This new containers shall be supplied along with the pump. For lifting purpose two eyebolts are provided on the frame of the vacuum pump. As shown in the drawing.
PUMP DETAILS
MODEL SERIAL NO. TYPE VACUUM DISPLACEMENT H.P. REOD.
R.P.M.
: SSP-70D
: ROTARY VANE TYPE : 0.2 TORR : 70 LY.M.MIN. : 1/2 : 1440 : 2.5 LTRS. APPROX.
OIL REOD.
MOTOR DETAILS
MAKE TYPE SERIAL NO. H.P. PHASE R.P.M. VOLTAGE MAX. LOAD ACCESSORIES : 1/2 : 3 : 1380 : 415 : 1.12 AMP. : BHARA T BIJLEE LIMITED : TEFC FLANGE MOUNTED
-1-
TECHNICAL DATA
1. 2. 3. 4. 5. 6. MATERIAL OF CONSTRUCTION INLET CONNECTION EXHAUST CONNECTION COUPLING SIZE OIL QUANTITY OIL SEAL USED : ALU.LM-4, S.S.304, CAST IRON : KF - 16 NOZZEL : KF -16 NOZZEL : L - 095 : 2.5 LITERS : 16 X 35 X 7 THK.
OPTIONAL ACCESSORIES
1.
: 1 : TEFLON
2.
RECOMMENDED SPARES
1. 2. 3.
4.
OIL SEAL NO. EXHAUST V/\LVE / VALVE PLATE SPRING + PIN FOR VANES - 1 'SET GASKET - 1 SET.
: 16 X 35 X 7 THK.
. RD - 4016
-2-
PUMP ARRANGEMENT: A 'ROTOR 'having two spring tensioned 'VANES 'rotates eccentrically in the 'STATER'. The stator is provided with 'SUCTIO'N PORT' and specially designed 'EXHAUST VALVE '. It is enclosed on one side with a 'BLIND END COVER 'and other side is provided with a direct drive coupling. The complete pump assembly is immersed in an oil filled' CHEMBER'.
ACCESSORIES'
SOLENOID VALVE: The Solenoid valve electrically operated is provided at the
suction of the vacuum pump, which remains closed normally but when motor gets switched off, it opens and allows atmosphere air to enter, there by it nullifies the pressure difference, so backflow of oil from pump to the system will not occur, thus the sudden power failure is not a problem. Also it acts as the non return valve for the system. The motor can be switched off whenever it is desired.
manufactured out of S.S.304 is provided to prevent enter of oil mist or dust particles in to the vacuum pump. Glass window is provided to observe the level of oil and dust inside the tank. When oil window shows the presence of oil it has to be drain out from the drain plug provided at the bottom of the tank.
-3-
provided after the pump and connected to the exhaust of S.S.304 is provided after the pump and connected to the exhaust of the pump. The oil which is thrown out from the pump is collected inside the tank and baffle out to prevent of oil gas mixture to be exhausted to the atmosphere. The glass window is provided to observe oil level inside the tank. The oil, which is above the oil level, will be recirculated inside the pump. The float valve is provided for this purpose. This mechanical float valve gets opened when oil reaches certain level as connected through piping to inlet of pump. Further the drain plug is provided to empty the tank manually.
CONNECTIONS: -
assures leak proof joint and assembly and disassembly becomes possible.
-4-
'ACMEVAC' rotary high vacuum pumps '0'hen supplied as complete. unit are complete with a motor, Love Joy Coupling N.R.V. etc. mounted on a sturdy base frame Gas ballast is a standard feature of all models.
BEFORE STARTING:
1. The pump and the motor when supplied as a unit is complete and prealligned on a base frame. While installation it is recommended that the base frame be properly bolted down on a correctly alignment, R.C.C.foundation. 2. Ex. Factory all opening are blanked off. Remove all suck blank flanges, also
4. Fill up the oil in the pump oil level in the window provided. The window of the oil tank at least half covered with oil. 5. CHECK electrical connection of the motor. The direction of rotation should be as .. per the arrow marked on the pump or clock wise while facing the pump shaft. 6. CONNECT the suction nozzle to your plant by means of suitable large flexible (Verify) but rigid or non collapsible piping. 7. Fit proper Vapour / liquid traps between pump and system, to avoid damage to pump and large scale oil contamination.
-5-
Your 'ACMEVAC' rotary high vacuum pump is now ready to be Put into use in your system. During operation if condensable vapours are to be handled, make use of the gas ballast. Loosen the gas ballast knob and let the pump run for above ~ hr. so that all condensable Vapour are pumped out before they condense and contaminated the oil
TO STOP
DO NOT STOP THIS PUMP WHILE IT IS YET CONNECTED TO THE VACUUMISED SYSTEM SINCE IT WILL RESULT IN BACKFLOW OF OIL FROM PUMP TO SYSTEM. To avoid this either use a non return valve or isolate the system from the vacuum pump, bleed air into the vacuum pump, either by means of the gas ba1last or a relief valve.
Oil is being used for lubrication. Check oil level at interval of every 15 days.
-6-
1) CHECK for leakages through rotor shaft. Change oil seal if necessary. 2) CHECK for leakage through oil drainer. Tightens if necessary.
A SUDDEN DECREASES IN OIL LEVEL indicates back flow of oil from pump to the
vacuum system, due to switching off pump without isolation the pump from the vacuum system. A non return valve should be included between the pump and the vacuum system.
AN INCREASE IN OIL LEVEL Indicates of foreign liquid inside. The oil chamber.
Drain off oil from the chamber. Feed a mixture of oil and kerosene (1: 2) through the. suction nozzle and rotate the pump thought motor fan end shadfly hand to flush the pump. Repeat the procedure 2 - 3 times clean the oil chamber too and fill with fresh oil
Change the oil once it looses its original colour or its viscosity. Frequency of oil change will depend on specific application and its degree of contamination. High vacuum is measured on a MCLOID gauge, which uses mercury. The mercury should be clean and pure, or else vacuum shown will differ from specified vacuum
-7-
window. To rectify adjust the setting bolt and the valve plate (above 1 HP pumps)
While in the case of pumps less then 1 HP merely tighten the screws which hold the exhaust valve in place.
IN INSPLITE OF THE MENTIONED PRECAUTIONS AND MEASURE FULL VACUUM IS NOT ACHIEVED THEN THE PUMP WILL HAVE TO BE EXAMINADE. BY OUR MAINTENANCE / SERVICE DEPARTMENT.
-8-
NOISE
ACMEVAC rotary high vacuum pumps have got a unique exhaust valve design due to which they are operation under normal circumstances.
- CHECK for loose I missing locking bolt on coupling - CHECK dismantles the motor & checks the rubber spider. If found spoiled, replace it. - CHECK oil level. If oil is less, a gurgling sound is heard. . - CHECK for displaced valve plate. for procedure check under 'VACUUM '.
MAINTENANCE & PRECAUTIONS
If suitable Vapour / liquid traps have been incorporated in the system and the procedure given as to how to start an? Stop the pump are closely. followed then the Pumps will give trouble free performance even when continuously used.
CHECK
- CHECK oil is colour and change if necessary but not before cleaning the pump
as per the procedure on page no.
- CHECK all pump and motor fitting bolts and tighten necessary.
-9-
- CHECK leakage of oil through shaft seal, replace oil seal if necessary.
OVERHAULING
1. Drain the oil removing the drain plug at the bottom of the oil chamber. Rotary the pump coupling by hand so that the working parts are also drained off oil. 2. Clean the oil chamber. , Refit the pump assembly back in the oil chamber. DO NOT ATTEMPT TO OPEN THE PUMP ASSEMBLY TO EXPOSE THE WORKING PARTS SINCE REFITTING THE SAME REQUIRES CONSIDERABLE SKILL AND MISFITTING WILL MAKE THE PUMP IRREPAIRABLE.
5.
3.
4.
Change gasket (oil chamber & coupling housing) with suitable on of same thickness. Refit on base frame and couple to motor and restart for further use.