Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Specification:
Latitude:
24 north
Time:
13 00 Hrs
Month:
May
35 C
24 C
6C
7.5 L
Floor dimension
22 m (22+ 6.5) m
Total height
5.18 m
4.57 5.18 m2
3.93 4.84 m2
3.51 4.29 m2
2.4 4.29 m2
Number of people
700
Electrical equipments:
Roof :
Floor :
Walls :
Windows:
Door :
SHGF
CLF
SC
Glass window
Area, A
SHGF
CLF
SC
Qr (W)
East Wall
47.3452
688
0.37
0.64
7713.404
West Wall
10.296
688
0.2
0.64
906.7069
North Wall
15.429
136
0.8
0.64
1074.352
South Wall
19.0212
145
0.65
0.64
1147.359
Due to certain resistance assume 30% heat can transfer through the window to
the wall.
Qr
= 0.3 10841.82 W
= 3252.547 W
: C type
Type of roof
To
= 35 - (DR/2)
= 35 - (6/2)
= 35 3
= 32 C
U value Calculation:
Roof:
Components
Resistance (R)
Condition
0.044
(wood), Ro
0.16
Still:
air
horizontal
position
downward
directional flow.
Asphalt Shingles, R1
0.077
For thickness
Concrete, R2
0.60
Cement mortar
Suspended fibre, R3
0.23
Fibre board
Air space, R4
0.14
Ur = 1/ Rt
Walls:
Components
Resistance (R)
Condition
Outside air, Ro
0.044
Inside air, Ri
0.12
Vertical &
position.
1.39
Common brick
Plaster, R2
1.39
Cement plaster,
aggregated
Uw = 1/ Rt
horizontal
sand,
= 1/ (Ro + R1 + R2 + Ri )
=1/ (0.044 +1.390.2286 +1.390.02542 + 0.12)
=1.810393833
Floor:
Components
Resistance (R)
Condition
Air inside, Ri
0.11
Horizontal
position
upward directional flow.
0.16
Still: air
10 mm tiles, R1
1.25
Acoustical
86 mm plaster, R2
1.39
Cement plaster,
aggregated
150mm concrete, R3
0.6
Cement mortar
25 mm plaster, R4
1.39
Cement plaster,
aggregated
Uf = 1/ Rt
sand,
sand,
Sliding door:
Ud = 5.9 W/m2s
Exposure
CLTD
LM
25-Ti
To(DR/2
)
CLTD
C
Qt
Roof
18
0.5
32
51.5
634.7
1.35
44112.09
South Wall
-3.3
32
35.7
94.78
1.81
6125.732
East Wal
14
32
47
102.1
1.81
8687.538
North Wall
0.5
32
38.5
98.94
1.81
6896.135
Glass
Windows
32
40
91.72
5.9
21645.99
= (44112.09+6125.732+8687.538+6896.135+21645.99) W
= 87467.48484 W
(To-Ti)
Qt
Lobby Wall
125.3
1.81
11
2494.524
Floor
623.6
3.546
11
24324.83
Doors
14.59
5.9
11
947.0208
People:
Qp = Qs + Qd
Qs = No. of people HG SHF CLF
Qd = No. of people HG (1-SHF)
Here,
SHF=60%
HG= 100 W per person for auditorium.
CLF=0.71
Qs
= 5001000.60.71
=21300 W
Qd
=500100 (1-.06)
=20000 W
Therefore,
Qp
=Qs + Qd
=29820 + 28000 =57820 W
Tube light
=7920 W
=3000 W
Spot light
=900 W
Sound system
=2000 W
Projectors
=160 W
Computer
=380 W
Therefore,
Qt
= (7920+3000+900+2000+160+380) W
=14360 W
=Qsv + Qlv
Qsv
Qlv
= (71032.5+220500) W
=208237.5 W
So, Total Cooling Load for the Hall is around 126.6491ton of refrigeration.