Sei sulla pagina 1di 8

S.P.SINGLA CONSTRUCTIONS PVT. LTD.

PROJECT: Construction of 4-Lane Flyover on Rialto-Airport Road at Kitchlu Chowk, Amritsar.


CLIENT:

Amritsar Improvement Trust.

Consultant : RITES Ltd.


CONTRACTOR: S.P.Singla Constructions Pvt. Ltd.
BAR BENDING SCHEDULE
Drawing No.
BSEC/1109/SD-04 R3

Structure

Location
S.No
Bar Mark
.

1.1

Dia of
Spacing in
Bar
mm
(mm)

16

Shape of the Bar

11.82

Cut Length
in Mtr.

No (S)

Length
8mm

10mm

12mm

16mm

12.00

60.00

10.00

50.00

0.20

1.2

16

1.1

16

8.79

8.789

43.945

1.2

16

10.82

10.821

54.105

10

9.78

0.20

1A

140

12
3

16

274.85
7.67

10

100

274.85

7.67

76.72

19.31

19.308

2.23

20.070

0.598

stirups

16

Total Length in Mtr.


Unit Weight Kg/m
Total Weight Kg

0.4

274.850

76.720

247.428

0.62

0.89

1.58

169.58

68.28

390.94

Grand Total

Contractor's Engineer

AIT Representative

628.80

Length
20mm

25mm

2.47

Remarks

3.86

S.P.SINGLA CONSTRUCTIONS PVT. LTD.


PROJECT: Construction of 4-Lane Flyover on Rialto-Airport Road at Kitchlu Chowk, Amritsar.
CLIENT:

Amritsar Improvement Trust.

Consultant : RITES Ltd.


CONTRACTOR: S.P.Singla Constructions Pvt. Ltd.
BAR BENDING SCHEDULE
Drawing No.
BSEC/1109/SD-04 R3

Structure

Location
S.No
Bar Mark
.

1.1

Dia of
Spacing in
Bar
mm
(mm)

20

Shape of the Bar

11.82

Cut Length
in Mtr.

No (S)

12.00

10.00

Length
8mm

10mm

12mm

16mm

0.20

1.2

20

1.1

20

9.21

9.205

1.2

20

11.21

11.205

10

9.82

0.20

1A

150

20
3

16

260.66
7.84

10

100

260.66

7.84
19.31

19.308

2.15

19.377

0.574

stirups

16

Total Length in Mtr.


Unit Weight Kg/m
Total Weight Kg

0.4

260.660

0.000

38.685

0.62

0.89

1.58

160.83

0.00

61.12

Grand Total

Contractor's Engineer

AIT Representative

939.361

Length
20mm

25mm

60.00

50.00

46.03
56.03

78.40

290.450
2.47
717.41
Kg

Remarks

Potrebbero piacerti anche