Sei sulla pagina 1di 17

Name of Work

W.O No
Client
Contractor
Bill No.
Bill Period
Bill Date

:
:
:
:
:
:
:

Construction of Firestation, Medical Unit, Parking Area, Main Gate House


LOI No - : GIL/EPC/C & C/KTPP/NPB - 02/ 11- 12, Dated - 23. 05 .2011.
GMR Infrastructure Ltd-EPC division
M/s. Unique Construction
R.A.1

Unique Construction

BOQ
Item No
1.00
1.01
1.01.1
1.01.2
1.01.3
1.01.4
1.01.5
1.02

STRUCTURAL WORKS
EXCAVATION
Contractor shall take all required permissions from the appropriate authorities for
General Excavation by mechanical means in all types of soil including dense soil,
up to 1.50m depth
up to 3.00m depth
3.00m to 6.00m depth
6.00m to 9.00m depth
Beyond 9.00m depth
Same as item No - 1.01 but for general excavation in Hard rock/ boulders (more than 1/2
Cum in size -Un-poclainable) by chiselling/ wedging to the required level & depth

Unit

Cum
Cum
Cum
Cum
Cum

Same as Item (1.02) but for excavation in Hard rock / boulders (more than 1/2 Cum in
size -Un poclainable) by chiseling/ wedging to required level for footings, trenches, rafts,

Cum

Excavation in hard rock / boulders (more than 1/2Cum in size) by Controlled blasting
1.05
using explosives and trimming to required level for foundation, trenches, rafts, plinths,

Cum

Carting away surplus earth/excavated material/debris and like materials outside the plot
not covered under items 1.01, 1.02,1.03 & 1.04 and disposing off the same to the

Cum

1.06

1.07

1.07.1
1.07.2
1.07.3
1.07.4
1.07.5
1.07.6
1.08

Supply and filling in foundations and the area whereever specified with approved good
quality filling materials in plinths, area development etc. wherever specified in layers of
not exceeding 150 mm thick including breaking clods,storing,transportation ,double
handling, watering, compacting each layer with vibratory compactor and at unaccessible
places with wooden/steel rammers to achieve 90 to 95% proctor density at optimum
moisture content, all leads and lifts, bailing/ pumping out of water to keep site dry while
backfilling; cost shall include conveyance of all materials, labour, machinery etc.
Cum
With excavated earth available at site
Cum
With approved quality earth brought from outside
Cum
With approved quality sand gravel mix in proportion of 1:1 brought from outside.
Cum
Approved quality river sand brought from outside
Cum
With approved quality manufactured sand brought from outside
Cum
With approved quality quarrydust brought from outside
Providing and laying in position 150mm thick soling with sand cushion of 50mm thick
including the cost of sandcushion, Base preparation by Mechanical compaction, using

Rate

Amount

This Bill Qty

Amount

61.412

Previous Qty

Amount

Cumulative Qty

Amount

8290.620

61.412

8290.620

Remarks

110

2800.00
1500.00

135

378000

150

225000

3900.00

75

292500

111.064

8329.781

111.064

8329.781

4400.00

55

242000

1184.605

65153.262

1184.605

65153.262

150.00

350

52500

184.565

64597.776

184.565

64597.776

1030.00

50

Cum

Excavation in all types of soil including dense soil, disintegrated/ weathered/ soft rock
(Poclainable) for Footings of columns, Retaining walls, Core walls, catch pits, Lift pits,
1.03 trenches for drains, etc., up to a depth of 1.5 m by mechanical means including
manual excavation for leveling, dressing the edges, with all leads and lifts including
Cum
back filling in layers of 150mm with watering and compaction. Removal of slurry
1.04

BOQ Qty

Sqm

1.09 Over and above Item 1.01,1.02,1.03,1.04 and 1.05 for installing open well dewatering
Nos
1.09.1 Cost of Sinking the well
Pumping with adequate capacity pumps and pipe networkincluding the hire charges of HP/Hr
1.09.2
pump, installation charges, pipe network, necessary fuel charges etc., complate
Providing and laying 1000 micron guage polythene paper/Polythene sheet below Grade
slab/Raft slab etc., to the required levels, including supply, loading and

Sqm

1.11 ANTI-TERMITE TREATMENT WORKS


Providing Anti termite treatment in accordance with stipulations laid down by IS 6313 1.11.1
part II by approved agency with min of 10 years of guarantee including the cost of

Sqm

1.10

A SUB TOTAL FOR EARTHWORKS

51500
1241500

146371.440

146371.440

For M/s.Unique Constructions


For GMR Infrastructure Ltd-EPC
Authorised Signature

page1age

Authorised Signature

Unique Construction

BOQ
Item No STRUCTURAL WORKS

This Bill Qty

Amount

Cumulative Qty

Amount

253125

17.340

39015.338

17.340

39015.338

2500

342500

31.826

79565.938

31.826

79565.938

152.50

2500

381250

200.00

2500

500000

33.204

83009.531

33.204

83009.531

24.638

61595.313

24.638

61595.313

BOQ Qty

Rate

Amount

112.50

2250

Providing and laying P.C.C. 1:2:4 of specified thickness wherever specified using river Cum
sand, 20mm and downsize aggregate including cleaning,subgrade preparation,
READY MIX CONCRETE / CONTROLLED CONCRETE
2.05
NOTE: CONCRETE SHALL BE PROCURED FROM SITE BATCHING PLANT HOWEVER, IN CASE
Cum
2.05.1 Columns M25 Grade of Concrete

137.00

2.05.3 Slab M25 Grade of Concrete

Cum

2.05.4 Beams M25 Grade of Concrete

Cum

2.00 CONCRETE
2.01 Providing and laying Plum concrete1: 5: 10. wherever specified using river sand, 40mm
Providing and laying P.C.C. 1:4:8 of specified th. wherever specified using river sand,
2.02 40mm and down size metal including sub grade preparation,leveling, all leads and
lifts,rough finishing at the top surface,curing and shuttering if necessary etc.,
2.03 Providing and laying P.C.C. 1:3:6 of specified thick wherever specified using river sand,

Unit

Previous Qty

Amount

Remarks

Cum

Cum
Cum

2.04

2.06
2.07
2.08
2.09
2.10
2.11
2.12

Footings / Raft slab for columns,Core walls,Retaining walls


Grade slab
Retaining walls
Ramp Beam
Ramp slab
RCC Parapet at all levels of specified thickness
Swimming Pool concreting at Lobby Level

Cum
Cum
Cum
Cum
Cum
Cum
Cum

184.50
91.00

2500

461250

2500

227500

35.00

2600

91000

2.16
2.17
2.18
2.19
2.20

Staircase at all floors & heights


Lintels
Chejjas/Lofts
RCC Brackets/Fins/Ledges at all levels
DG, Chillers, Pump & Transfo Foundations

Cum
Cum
Cum
Cum
Cum

10.00
15.00
5.00

2550

25500

2550

38250

2550

12750

2.21 M15 GRADE CONCRETE


Providing and laying R.C.C. 1:2:4 of specified thick wherever specified using river sand,
20mm and downsize metal
preperation,Compaction,levelling,
leads and
Precasting,curing,fixing
in including
position base
the Pergola
beams with M25 grade of all
concrete
of
2.21.2
specified size using necessary moulds prepared out of MS sheets to get form finish,using
2.21.1

Cum
Cum

B SUB TOTAL FOR CONCRETING

2333125

FORM WORK
Providing, fabricating and erecting form work at all levels and places and profiles
wherever needed/specified as per drawing including striking with 12mm Plastic coated,
3.00 marine resistant waterproof ply/Smooth finished MS plates with adjustable steel props
of acceptable Staging system and with sufficient bracing as approved by consultant. Cost
to include designing of proper form work and staging system to suit the requirements,
Submission of design calculations and shop drawings for approval, sealing the joints with
3.01 Columns

Sqm

1290.00

250

322500

3.03 Slab

Sqm

945.00

270

255150

3.04 Beams

Sqm

1985.00

270

535950

3.05
3.06
3.07
3.08
3.09
3.10
3.11

Footings / Raft slab for columns,Core walls,Retaining walls


Grade slab
Retaining walls
Ramp Beam
Ramp slab
RCC Parapet at all levels of specified thickness
Swimming Pool at Lobby Level

Sqm
Sqm
Sqm
Sqm
Sqm
Sqm

345.00
20.00

200

69000

250

5000

694.00

300

208200

3.15
3.16
3.17
3.18
3.19

Staircase at all floors & heights.


Lintels
Chejjas/Lofts
RCC Brackets/Fins/Ledges at all levels
DG, Chillers, Pump & Transfo Foundations

Sqm
Sqm
Sqm
Sqm
Sqm

38.00
60.00
40.00

280

10640

200

12000

250

10000

C SUB TOTAL FOR FORMWORKS

1428440

263186.119

263186.119

324.440

81110.000

324.440

81110.000

266.546

71967.285

266.546

71967.285

153077.285

153077.285

For M/s.Unique Constructions


For GMR Infrastructure Ltd-EPC
Authorised Signature

page2age

Authorised Signature

Unique Construction

BOQ
Item No STRUCTURAL WORKS
4.00 REINFORCEMENT STEEL
Fabricating & fixing in position reinforcement for RCC work with high yield strength
ribbed cold twisted tor steel (HSD) bar of various diameters and grade of steel as
specified below conforming to IS specification including cutting, providing, supplying &
bending, hoisting, fabricating and placing in position according to drawings and binding
4.01
the reinforcement with galvanised annealed binding wire of double fold of 18 gauge and
providing PVC cover blocks for placing the reinforcements in position and for
maintaining the cover specified and/or according to relevant IS.
Note : Unless noted otherwise the measurements in accordance with IS 1200. However
4.01.2 Fe 500
4.02 Same as Item 4.01 but for Providing and fixing in position high strength weld mesh
4.03

Providing, fabricating and erecting Structural steel members in position at all levels and
at all heights as specified in the drawings made out of standard MS sections conforming

Structural steel works made up of TATA Closed Structural tubes (RHS/SHS)or equivalent
conforming to IS 800 providing lacing with same sections with necessary Gusset Plates,
Providing, Fabricating and erecting in position structural steel conforming to IS 800 as
4.05a
corner angles(50x50x6MM)
for columns,
Edge to
angle
for Catch
pitsarea
andcolumns
wherever
specified
Providing
and fixing of Rubber
corner bead
protect
parking
made
out of
4.05b
rubber of size 50 MM X 50 MM and length 1.00 mts thinkness 6 MM and base material
4.04

4.06 Same as Item 4.03 & 4.04 for Insert plates and anchor bolts

Unit

BOQ Qty

Rate

Amount

MT

79.00

4500

355500

MT

21.50

80000

1720000

MT

22.10

75000

1657500

3.90

75000

292500

12.322

55447.164

Previous Qty

Amount

Cumulative Qty

Amount

12.322

55447.164

Remarks

MT
Nos
MT

Nos
Nos

4.08
4.08.1
4.08.2
4.08.3

Nos
Nos
Nos

D SUB TOTAL FOR REINFORCEMENT STEEL


Grand Total In Rs.

Amount

MT

Providing and fixing Mechanical Splicing using threaded coupler to the reinforcement bars
4.07
of specified dia and grade using high yield strength standard couplers of specially
4.07.1 Y32
4.07.2 Y25
Providing and anchoring in position high strength anchor bolts of grade 5.8 and specified
20mm dia (heavy duty)
16mm dia (heavy duty)
12mm dia

This Bill Qty

4025500

18,057,130

55447.164

55447.164

618082.007

618082.007

For M/s.Unique Constructions


For GMR Infrastructure Ltd-EPC
Authorised Signature

page3age

Authorised Signature

Name of Work
W.O. No
Client
Contractor
R .A.Bill No.

Constructon of Firestation, Medical Unit, Parking Area, Main Gate House

:
:
:
:
:

GMR Infrastructure Ltd-EPC division


Unique Construction
1

MEASUREMENT SHEET
BOQ Item. 1.01,General Excavation by mechanical means in all types of soil including dense soil, disintegrated/ weathered/ soft rock including
necessary manual excavation for dressing the edges & leveling, all leads and lifts, back filling in layers of 150mm with watering and compaction.
Rate to include disposing the excess earth and spreading in layers to the required levels within the site wherever specified and carting away out
side the site to the designated areas identified by the local authorities, removal of slurry generated while excavation and keeping the area free of
water with necessary shoring, struting, required for keeping earth in position etc,. excavating loose pockets and compacting the same. Note:PCC
area shall be considered for measurement (Working space & provision of slopes if required for execution shall not be paid separately).
BOQ Item 1.01.1, up to 1.50m depth
S.No.

Description

Units

No's

Depth of
General
soil

Quantity

NGL

Excavation
Level

Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
29

1.450
1.500
1.500
1.850
1.300
1.300
1.300
1.300
1.450
1.700
1.500
1.700
1.700
1.850
1.850
1.850
1.850
1.700
1.500
1.300
1.850
1.700
1.700
1.450
1.850
1.300
1.300
1.300
1.100

1.450
1.650
1.650
2.000
1.300
1.300
1.300
1.300
1.450
1.850
1.650
1.850
1.850
2.000
1.700
1.700
1.700
1.850
1.650
1.300
2.000
1.850
1.850
1.450
2.000
1.300
1.300
1.300
1.100

1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500

3.154
3.713
3.713
5.550
2.535
2.535
2.535
2.535
3.154
4.718
3.713
4.718
4.718
5.550
4.718
4.718
4.718
4.718
3.713
2.535
5.550
4.718
4.718
3.154
5.550
2.535
2.535
2.535
1.815

64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700

62.300
62.300
62.300
62.300
62.300
62.200
62.200
62.200
62.300
62.300
62.300
62.300
62.700
62.200
62.200
62.200
62.200
62.300
62.200
62.200
62.700
62.700
62.200
62.200
62.700
62.700
62.700
62.700
62.700

Remarks

Firestation
Excavtion for Footings
Excavation upto 1.50m
Depth
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

F5(1250X1250X400)
F2(1300X1450X400)
F2(1300X1450X400)
F3(1650X1800X450)
F4(1100X1100X350)
F4(1100X1100X350)
F4(1100X1100X350)
F4(1100X1100X350)
F5(1250X1250X400)
F1(1500X1650X450)
F2(1300X1450X400)
F1(1500X1650X450)
F1(1500X1650X450)
F3(1650X1800X450)
F3(1650X1800X450)
F3(1650X1800X450)
F3(1650X1800X450)
F1(1500X1650X450)
F2(1300X1450X400)
F4(1100X1100X350)
F3(1650X1800X450)
F1(1500X1650X450)
F1(1500X1650X450)
F5(1250X1250X400)
F3(1650X1800X450)
F4(1100X1100X350)
F4(1100X1100X350)
F4(1100X1100X350)
F6(900x900x300)

Total

Grid A2
Grid A3
Grid A/4-5
Grid A/5-6
Grid 7A
Grid 8A
Grid 9A
Grid 10A
Grid B1
Grid B2
Grid B3
Grid B/4-5
Grid B/5-6
Grid B7
Grid B8
Grid B9
Grid B10
Grid C/2-3
Grid C5
Grid C6
Grid D1
Grid D2-3
Grid D4
Grid D5
Grid C-D/7
Grid C-D/8
Grid C-D/9
Grid C-D/10
Grid D6

111.064

For M/s.Unique Constructions


For GMR Infrastructure Ltd-EPC
Authorised Signature

page4age

Authorised Signature

Name of Work
W.O. No
Client
Contractor
R .A.Bill No.

:
:
:
:
:

Constructon of Firestation, Medical Unit, Parking Area, Main Gate House


W.O.date 15.11.2010
GMR Infrastructure Ltd-EPC division
Unique Construction
1

MEASUREMENT SHEET
BOQ Item. 1.01,General Excavation by mechanical means in all types of soil including dense soil, disintegrated/ weathered/ soft rock including
necessary manual excavation for dressing the edges & leveling, all leads and lifts, back filling in layers of 150mm with watering and compaction.
Rate to include disposing the excess earth and spreading in layers to the required levels within the site wherever specified and carting away out
side the site to the designated areas identified by the local authorities, removal of slurry generated while excavation and keeping the area free of
water with necessary shoring, struting, required for keeping earth in position etc,. excavating loose pockets and compacting the same. Note:PCC
area shall be considered for measurement (Working space & provision of slopes if required for execution shall not be paid separately).
BOQ Item 1.01.2, up to 3.00m depth

S.No.

Description

Units

No's

Depth of
General
soil

Quantity

NGL

Excavation
Bottom
Level

Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1.450
1.500
1.500
1.850
1.300
1.300
1.300
1.300
1.450
1.700
1.500
1.700
1.700
1.850
1.850
1.850
1.850
1.700
1.500
1.300
1.850
1.700
1.700
1.450
1.850
1.300
1.300
1.300
1.100

1.450
1.650
1.650
2.000
1.300
1.300
1.300
1.300
1.450
1.850
1.650
1.850
1.850
2.000
1.700
1.700
1.700
1.850
1.650
1.300
2.000
1.850
1.850
1.450
2.000
1.300
1.300
1.300
1.100

0.900
0.900
0.900
0.900
0.900
1.000
1.000
1.000
0.900
0.900
0.900
0.900
0.500
1.000
1.000
1.000
1.000
0.900
1.000
1.000
0.500
0.500
1.000
1.000
0.500
0.500
0.500
0.500
0.500

1.892
2.228
2.228
3.330
1.521
1.690
1.690
1.690
1.892
2.831
2.228
2.831
1.573
3.700
3.145
3.145
3.145
2.831
2.475
1.690
1.850
1.573
3.145
2.103
1.850
0.845
0.845
0.845
0.605

64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700

62.300
62.300
62.300
62.300
62.300
62.200
62.200
62.200
62.300
62.300
62.300
62.300
62.700
62.200
62.200
62.200
62.200
62.300
62.200
62.200
62.700
62.700
62.200
62.200
62.700
62.700
62.700
62.700
62.700

Total

61.412

Remarks

Firestation
Excavtion for Footings
Excavation upto 1.50m to
3m Depth
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

F5(1250X1250X400)
F2(1300X1450X400)
F2(1300X1450X400)
F3(1650X1800X450)
F4(1100X1100X350)
F4(1100X1100X350)
F4(1100X1100X350)
F4(1100X1100X350)
F5(1250X1250X400)
F1(1500X1650X450)
F2(1300X1450X400)
F1(1500X1650X450)
F1(1500X1650X450)
F3(1650X1800X450)
F3(1650X1800X450)
F3(1650X1800X450)
F3(1650X1800X450)
F1(1500X1650X450)
F2(1300X1450X400)
F4(1100X1100X350)
F3(1650X1800X450)
F1(1500X1650X450)
F1(1500X1650X450)
F5(1250X1250X400)
F3(1650X1800X450)
F4(1100X1100X350)
F4(1100X1100X350)
F4(1100X1100X350)
F6(900x900x300)

29

Grid A2
Grid A3
Grid A/4-5
Grid A/5-6
Grid 7A
Grid 8A
Grid 9A
Grid 10A
Grid B1
Grid B2
Grid B3
Grid B/4-5
Grid B/5-6
Grid B7
Grid B8
Grid B9
Grid B10
Grid C/2-3
Grid C5
Grid C6
Grid D1
Grid D2-3
Grid D4
Grid D5
Grid C-D/7
Grid C-D/8
Grid C-D/9
Grid C-D/10
Grid D6

For M/s.Unique Constructions


For GMR Infrastructure Ltd-EPC
Authorised Signature

page5age

Authorised Signature

Name of Work
W.O. No
Client
Contractor
R .A.Bill No.

Constructon of Firestation, Medical Unit, Parking Area, Main Gate House

:
:
:
:
:

GMR Infrastructure Ltd-EPC division


Unique Construction
1

MEASUREMENT SHEET
BOQ Item. 2.02, Providing and laying P.C.C. 1:4:8 of specified th. wherever specified using river sand, 40mm and down size metal including
sub grade preparation,leveling, all leads and lifts,rough finishing at the top surface,curing and shuttering if necessary etc.,

S.No.

Description

Units

No's

Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
29

Quantity

NGL

Excavation/
PCC
Bottom
Level

0.210
0.248
0.248
0.370
0.169
0.169
0.169
0.169
0.210
0.315
0.248
0.315
0.315
0.370
0.315
0.315
0.315
0.315
0.248
0.169
0.370
0.315
0.315
0.210
0.370
0.169
0.169
0.169
0.121
7.404

64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700

62.300
62.300
62.300
62.300
62.300
62.200
62.200
62.200
62.300
62.300
62.300
62.300
62.700
62.200
62.200
62.200
62.200
62.300
62.200
62.200
62.700
62.700
62.200
62.200
62.700
62.700
62.700
62.700
62.700

Remarks

Firestation
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

PCC for Footings


F5(1250X1250X400)
F2(1300X1450X400)
F2(1300X1450X400)
F3(1650X1800X450)
F4(1100X1100X350)
F4(1100X1100X350)
F4(1100X1100X350)
F4(1100X1100X350)
F5(1250X1250X400)
F1(1500X1650X450)
F2(1300X1450X400)
F1(1500X1650X450)
F1(1500X1650X450)
F3(1650X1800X450)
F3(1650X1800X450)
F3(1650X1800X450)
F3(1650X1800X450)
F1(1500X1650X450)
F2(1300X1450X400)
F4(1100X1100X350)
F3(1650X1800X450)
F1(1500X1650X450)
F1(1500X1650X450)
F5(1250X1250X400)
F3(1650X1800X450)
F4(1100X1100X350)
F4(1100X1100X350)
F4(1100X1100X350)
F6(900x900x300)

1.450
1.450
0.100
1.500
1.650
0.100
1.500
1.650
0.100
1.850
2.000
0.100
1.300
1.300
0.100
1.300
1.300
0.100
1.300
1.300
0.100
1.300
1.300
0.100
1.450
1.450
0.100
1.700
1.850
0.100
1.500
1.650
0.100
1.700
1.850
0.100
1.700
1.850
0.100
1.850
2.000
0.100
1.850
1.700
0.100
1.850
1.700
0.100
1.850
1.700
0.100
1.700
1.850
0.100
1.500
1.650
0.100
1.300
1.300
0.100
1.850
2.000
0.100
1.700
1.850
0.100
1.700
1.850
0.100
1.450
1.450
0.100
1.850
2.000
0.100
1.300
1.300
0.100
1.300
1.300
0.100
1.300
1.300
0.100
1.100
1.100
0.100
Total Footings PCC

Grid A2
Grid A3
Grid A/4-5
Grid A/5-6
Grid 7A
Grid 8A
Grid 9A
Grid 10A
Grid B1
Grid B2
Grid B3
Grid B/4-5
Grid B/5-6
Grid B7
Grid B8
Grid B9
Grid B10
Grid C/2-3
Grid C5
Grid C6
Grid D1
Grid D2-3
Grid D4
Grid D5
Grid C-D/7
Grid C-D/8
Grid C-D/9
Grid C-D/10
Grid D6

For M/s.Unique Constructions


For GMR Infrastructure Ltd-EPC
Authorised Signature

page6age

Authorised Signature

Firestation
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32

PCC For Plinth Beams


PB1(250x600)
PB2(250X600)
PB3(250X450)
PB4(250X600)
PB4(250X450)
PB5(250X600)
PB6(250X600)
PB7(250X600)
PB8(250X600)
PB9(250X600)
PB10(250X750)
PB11(250X600)
PB12(250X600)
PB13(250X600)
PB14(250X750)
PB14(250X600)
PB15(250X600)
PB16(250X600)
PB17A(250X600)
PB17(250X600)
PB18(250X600)
PB19(250X600)
PB20(250x600)
PB21(250X600)
PB22(250X600)
PB23(250X600)
PB2A(125x300)
PB2B(125X300)
PB12A(125X300)
PB12A(125X300)
PB1A(125X300)
PB1B(125X300)

Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m

No's
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
1
2
2
1
1
1
1

L
H
D
12.695
0.450
0.100
19.700
0.450
0.100
2.500
0.450
0.100
22.600
0.450
0.100
2.450
0.450
0.100
12.695
0.450
0.100
12.650
0.450
0.100
4.500
0.450
0.100
8.400
0.450
0.100
12.695
0.450
0.100
8.000
0.450
0.100
6.950
0.450
0.100
5.450
0.450
0.100
4.800
0.450
0.100
4.955
0.450
0.100
2.000
0.450
0.100
5.100
0.450
0.100
7.405
0.450
0.100
5.200
0.450
0.100
4.950
0.450
0.100
5.350
0.450
0.100
4.800
0.450
0.100
2.700
0.450
0.100
10.050
0.450
0.100
10.000
0.450
0.100
10.000
0.450
0.100
0.325
0.325
0.100
0.325
0.325
0.100
0.600
0.325
0.100
0.500
0.325
0.100
0.325
0.325
0.100
0.325
0.325
0.100
Total Plinth Beam PCC Qty.
Total Plinth Beams + Footing PCC

Quantity
0.571
0.887
0.113
1.017
0.110
0.571
0.569
0.203
0.378
0.571
0.360
0.313
0.245
0.216
0.223
0.090
0.230
0.333
0.234
0.223
0.241
0.216
0.122
0.452
0.900
0.450
0.021
0.021
0.020
0.016
0.011
0.011
9.936
17.340

Remarks

For M/s.Unique Constructions


For GMR Infrastructure Ltd-EPC
Authorised Signature

page7age

Authorised Signature

Name of Work
W.O. No
Client
Contractor
R .A.Bill No.

Constructon of Firestation, Medical Unit, Parking Area, Main Gate House

:
:
:
:
:

GMR Infrastructure Ltd-EPC division


Unique Construction
1

MEASUREMENT SHEET
BOQ Item 2.05, Item READY MIX CONCRETE / CONTROLLED CONCRETE
NOTE: CONCRETE SHALL BE PROCURED FROM SITE BATCHING PLANT HOWEVER, IN CASE OF READY MIX CONCRETE
PROCURED FROM RMC PLANT THE PROBABLE
(Design mix shall be as approved by the Structural Consultant / Employers representative. Micro silica to be used for the Concrete of higher
grde than M45 Grade
Providing, batching, mixing, transporting through transit mixers, pumping and laying Reinforced Cement Concrete of specified grade at all
levels and heights specified below using ordinary Portland cement of grade 53 from approved manufacturer, river sand, 20mm and down size
coarse aggregates, necessary admixtures approved by Consultants (Conplast SP 430SRV from Fosroc or equivalent), including all leads and lifts,
pumping using line pump or boom placer, vibrating/ compaction, scaffolding wherever necessary, curing as directed, excluding cost of
shuttering and centering.
BOQ Item 2.06, Footings / Raft slab for columns,Core walls,Retaining walls
S.No.

Description

Units

No's

Quantity

NGL

Footing
Bottom/PCC
Top lvl

Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
29

1.250
1.300
1.300
1.650
1.100
1.100
1.100
1.100
1.250
1.500
1.300
1.500
1.500
1.650
1.650
1.650
1.650
1.500
1.300
1.100
1.650
1.500
1.500
1.250
1.650
1.100
1.100
1.100
0.900

1.250
1.450
1.450
1.800
1.100
1.100
1.100
1.100
1.250
1.650
1.450
1.650
1.650
1.800
1.800
1.800
1.800
1.650
1.450
1.100
1.800
1.650
1.650
1.250
1.800
1.100
1.100
1.100
0.900

0.400
0.400
0.400
0.450
0.350
0.350
0.350
0.350
0.400
0.450
0.400
0.450
0.450
0.450
0.450
0.450
0.450
0.450
0.400
0.350
0.450
0.450
0.450
0.450
0.450
0.350
0.350
0.350
0.300

0.625
0.754
0.754
1.337
0.424
0.424
0.424
0.424
0.625
1.114
0.754
1.114
1.114
1.337
1.337
1.337
1.337
1.114
0.754
0.424
1.337
1.114
1.114
0.703
1.337
0.424
0.424
0.424
0.243

64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700

62.300
62.300
62.300
62.300
62.300
62.200
62.200
62.200
62.300
62.300
62.300
62.300
62.700
62.200
62.200
62.200
62.200
62.300
62.200
62.200
62.700
62.700
62.200
62.200
62.700
62.700
62.700
62.700
62.700

Total

24.638

Remarks

Firestation
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

M25 For Footings


F5(1250X1250X400)
F2(1300X1450X400)
F2(1300X1450X400)
F3(1650X1800X450)
F4(1100X1100X350)
F4(1100X1100X350)
F4(1100X1100X350)
F4(1100X1100X350)
F5(1250X1250X400)
F1(1500X1650X450)
F2(1300X1450X400)
F1(1500X1650X450)
F1(1500X1650X450)
F3(1650X1800X450)
F3(1650X1800X450)
F3(1650X1800X450)
F3(1650X1800X450)
F1(1500X1650X450)
F2(1300X1450X400)
F4(1100X1100X350)
F3(1650X1800X450)
F1(1500X1650X450)
F1(1500X1650X450)
F5(1250X1250X400)
F3(1650X1800X450)
F4(1100X1100X350)
F4(1100X1100X350)
F4(1100X1100X350)
F6(900x900x300)

Grid A2
Grid A3
Grid A/4-5
Grid A/5-6
Grid 7A
Grid 8A
Grid 9A
Grid 10A
Grid B1
Grid B2
Grid B3
Grid B/4-5
Grid B/5-6
Grid B7
Grid B8
Grid B9
Grid B10
Grid C/2-3
Grid C5
Grid C6
Grid D1
Grid D2-3
Grid D4
Grid D5
Grid C-D/7
Grid C-D/8
Grid C-D/9
Grid C-D/10
Grid D6

For M/s.Unique Constructions


For GMR Infrastructure Ltd-EPC
Authorised Signature

page8age

Authorised Signature

Name of Work
W.O. No
Client
Contractor
R .A.Bill No.

Constructon of Firestation, Medical Unit, Parking Area, Main Gate House

:
:
:
:
:

GMR Infrastructure Ltd-EPC division


Unique Construction
1

MEASUREMENT SHEET
BOQ Item 2.05.4, Footings / Raft slab for columns,Core walls,Retaining walls
S.No.
Description
Units
No's
L
B

Quantity

Remarks

Firestation
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32

M25 For Plinth Beams


PB1(250x600)
PB2(250X600)
PB3(250X450)
PB4(250X600)
PB4(250X450)
PB5(250X600)
PB6(250X600)
PB7(250X600)
PB8(250X600)
PB9(250X600)
PB10(250X750)
PB11(250X600)
PB12(250X600)
PB13(250X600)
PB14(250X750)
PB14(250X600)
PB15(250X600)
PB16(250X600)
PB17A(250X600)
PB17(250X600)
PB18(250X600)
PB19(250X600)
PB20(250x600)
PB21(250X600)
PB22(250X600)
PB23(250X600)
PB2A(125x300)
PB2B(125X300)
PB12A(125X300)
PB12A(125X300)
PB1A(125X300)
PB1B(125X300)

Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
1
2
2
1
1
1
1

12.695
0.250
0.600
19.700
0.250
0.600
2.500
0.250
0.450
22.600
0.250
0.600
2.450
0.250
0.450
12.695
0.250
0.600
12.650
0.250
0.600
4.500
0.250
0.600
8.400
0.250
0.600
12.695
0.250
0.600
8.000
0.250
0.750
6.950
0.250
0.600
5.450
0.250
0.600
4.800
0.250
0.600
4.955
0.250
0.750
2.000
0.250
0.600
5.100
0.250
0.600
7.405
0.250
0.600
5.200
0.250
0.600
4.950
0.250
0.600
5.350
0.250
0.600
4.800
0.250
0.600
2.700
0.250
0.600
10.050
0.250
0.600
10.000
0.250
0.600
10.000
0.250
0.600
0.325
0.125
0.300
0.325
0.125
0.300
0.600
0.125
0.300
0.500
0.125
0.300
0.325
0.125
0.300
0.325
0.125
0.300
Total Plinth Beam Quantity

1.904
2.955
0.281
3.390
0.276
1.904
1.898
0.675
1.260
1.904
1.500
1.043
0.818
0.720
0.929
0.300
0.765
1.111
0.780
0.743
0.803
0.720
0.405
1.508
3.000
1.500
0.024
0.024
0.023
0.019
0.012
0.012
33.204

For M/s.Unique Constructions


For GMR Infrastructure Ltd-EPC
Authorised Signature

page9age

Authorised Signature

Name of Work
W.O. No
Client
Contractor
R .A.Bill No.

Constructon of Firestation, Medical Unit, Parking Area, Main Gate House

:
:
:
:
:

GMR Infrastructure Ltd-EPC division


Unique Construction
1

MEASUREMENT SHEET
BOQ Item. Extra Item- M30 Grade for Columns
S.No.

Description

Units

No's

Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
29

Quantity

Plinth
Bottom
Lvl

Footing Top
Lvl

66.300
66.300
66.300
66.300
66.050
66.050
66.050
66.050
66.300
66.300
66.300
66.300
66.300
66.050
66.050
66.050
66.050
66.150
66.300
66.300
66.150
66.150
66.300
66.300
66.050
66.050
66.050
66.050
66.900

62.800
62.800
62.800
62.850
62.750
62.650
62.650
62.650
62.800
62.850
62.800
62.850
63.250
62.750
62.750
62.750
62.750
62.850
62.700
62.650
63.250
63.250
62.750
62.750
63.250
63.150
63.150
63.150
63.100

Remarks

Firestation
M30 For Columns Below
Plinth Lvl
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

C2A(450X450)
C3A(450X450)
C3A(450X450)
C2(450X450)
C3(450X450)
C3(450X450)
C3(450X450)
C3(450X450)
C2A(450X450)
C2(450X450)
C3A(450X450)
C1(450X450)
C2(450X450)
C2(450X450)
C2(450X450)
C2(450X450)
C2A(450X450)
C2(450X450)
C3A(450X450)
C4(450X450)
C2(450X450)
C2A(450X450)
C1(450X450)
C2A(450X450)
C2A(450X450)
C5(450X450)
C5(450X450)
C5(450X450)
SC1(250X250)

0.450
0.450
3.500
0.450
0.450
3.500
0.450
0.450
3.500
0.450
0.450
3.450
0.450
0.450
3.300
0.450
0.450
3.400
0.450
0.450
3.400
0.450
0.450
3.400
0.450
0.450
3.500
0.450
0.450
3.450
0.450
0.450
3.500
0.450
0.450
3.450
0.450
0.450
3.050
0.450
0.450
3.300
0.450
0.450
3.300
0.450
0.450
3.300
0.450
0.450
3.300
0.450
0.450
3.300
0.450
0.450
3.600
0.450
0.450
3.650
0.450
0.450
2.900
0.450
0.450
2.900
0.450
0.450
3.550
0.450
0.450
3.550
0.450
0.450
2.800
0.450
0.450
2.900
0.450
0.450
2.900
0.450
0.450
2.900
0.250
0.250
3.800
Total Qty. Below Plinth Lvl

0.709
0.709
0.709
0.699
0.668
0.689
0.689
0.689
0.709
0.699
0.709
0.699
0.618
0.668
0.668
0.668
0.668
0.668
0.729
0.739
0.587
0.587
0.719
0.719
0.567
0.587
0.587
0.587
0.238
18.979

Grid A2
Grid A3
Grid A/4-5
Grid A/5-6
Grid 7A
Grid 8A
Grid 9A
Grid 10A
Grid B1
Grid B2
Grid B3
Grid B/4-5
Grid B/5-6
Grid B7
Grid B8
Grid B9
Grid B10
Grid C/2-3
Grid C5
Grid C6
Grid D1
Grid D2-3
Grid D4
Grid D5
Grid C-D/7
Grid C-D/8
Grid C-D/9
Grid C-D/10
Grid D6

For M/s.Unique Constructions


For GMR Infrastructure Ltd-EPC
Authorised Signature

page10age

Authorised Signature

S.No.

Description

Units

No's

Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
28

0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300

0.450
0.300
0.300
0.450
0.300
0.300
0.300
0.300
0.450
0.450
0.300
0.300
0.450
0.450
0.450
0.450
0.450
0.450
0.300
0.300
0.450
0.450
0.300
0.450
0.450
0.300
0.300
0.300

Quantity

Plinth
Bottom
Lvl

Footing Top
Lvl

69.550
69.550
69.550
69.550
71.300
71.300
71.300
71.300
69.550
69.550
69.550
69.550
69.550
71.300
71.300
71.300
71.300
69.400
69.550
69.550
69.400
69.400
69.550
69.550
71.300
71.300
71.300
71.300

66.300
66.300
66.300
66.300
66.050
66.050
66.050
66.050
66.300
66.300
66.300
66.300
66.300
66.050
66.050
66.050
66.050
66.150
66.300
66.300
66.150
66.150
66.300
66.300
66.050
66.050
66.050
66.050

Remarks

M30 For Columns


Plinth Lvl To Roof Lvl
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28

C2A(300x450)
C3A(300x300)
C3A(300x300)
C2(300X450)
C3(300x300)
C3(300x300)
C3(300x300)
C3(300x300)
C2A(300X450)
C2(300X450)
C3A(300x300)
C1(300X300)
C2(300X450)
C2(300X450)
C2(300X450)
C2(300X450)
C2A(300x450)
C2(300X450)
C3A(300x300)
C4(300X300)
C2(300X450)
C2A(300x450)
C1(300X300)
C2A(300x450)
C2A(300x450)
C5(300X300)
C5(300X300)
C5(300X300)

3.250
3.250
3.250
3.250
5.250
5.250
5.250
5.250
3.250
3.250
3.250
3.250
3.250
5.250
5.250
5.250
5.250
3.250
3.250
3.250
3.250
3.250
3.250
3.250
5.250
5.250
5.250
5.250
Total Qty.
Total Columns Qty.

0.439
0.293
0.293
0.439
0.473
0.473
0.473
0.473
0.439
0.439
0.293
0.293
0.439
0.709
0.709
0.709
0.709
0.439
0.293
0.293
0.439
0.439
0.293
0.439
0.709
0.473
0.473
0.473
12.848

Grid A2
Grid A3
Grid A/4-5
Grid A/5-6
Grid 7A
Grid 8A
Grid 9A
Grid 10A
Grid B1
Grid B2
Grid B3
Grid B/4-5
Grid B/5-6
Grid B7
Grid B8
Grid B9
Grid B10
Grid C/2-3
Grid C5
Grid C6
Grid D1
Grid D2-3
Grid D4
Grid D5
Grid C-D/7
Grid C-D/8
Grid C-D/9
Grid C-D/10

31.826

For M/s.Unique Constructions


For GMR Infrastructure Ltd-EPC
Authorised Signature

page11age

Authorised Signature

Name of Work
W.O. No
Client
Contractor
R .A.Bill No.

Constructon of Firestation, Medical Unit, Parking Area, Main Gate House

:
:
:
:
:

GMR Infrastructure Ltd-EPC division


Unique Construction
1

MEASUREMENT SHEET
BOQ Item. 3.00,FORM WORK
Providing, fabricating and erecting form work at all levels and places and profiles wherever needed/specified as per drawing including
striking with 12mm Plastic coated, marine resistant waterproof ply/Smooth finished MS plates with adjustable steel props of acceptable
Staging system and with sufficient bracing as approved by consultant. Cost to include designing of proper form work and staging system to
suit the requirements, Submission of design calculations and shop drawings for approval, sealing the joints with heavy duty brown self
adhesive tape, aligning to line and levels including M.S. Ties, PVC Spacer, Providing openings/ cutouts/ pockets, applying deshuttering
chemical, Deshuttering as approved by the consultant etc., complete at all levels, double/tripple heights and profiles for,
1) plywood shuttering shall be considered for all vertical elements,beam soffit,corewalls,stairs,ramps,tanks,RCCpedestals Etc.,
2) M.S. plates shall be considered for foundation,slabs only.
3) Shuttering & deshuttering sequence shall be 100% ,80% & 40% from the slab to be cast respectively.
BOQ Item 3.05, Footings / Raft slab for columns,Core walls,Retaining walls
S.No.

Description

Units

No's

Quantity

NGL

Footing
Bottom/PCC
Top lvl

Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
29

1.250
1.300
1.300
1.650
1.100
1.100
1.100
1.100
1.250
1.500
1.300
1.500
1.500
1.650
1.650
1.650
1.650
1.500
1.300
1.100
1.650
1.500
1.500
1.250
1.650
1.100
1.100
1.100
0.900

1.250
1.450
1.450
1.800
1.100
1.100
1.100
1.100
1.250
1.650
1.450
1.650
1.650
1.800
1.800
1.800
1.800
1.650
1.450
1.100
1.800
1.650
1.650
1.250
1.800
1.100
1.100
1.100
0.900

0.400
0.400
0.400
0.450
0.350
0.350
0.350
0.350
0.400
0.450
0.400
0.450
0.450
0.450
0.450
0.450
0.450
0.450
0.400
0.350
0.450
0.450
0.450
0.450
0.450
0.350
0.350
0.350
0.300

2.000
2.200
2.200
3.105
1.540
1.540
1.540
1.540
2.000
2.835
2.200
2.835
2.835
3.105
3.105
3.105
3.105
2.835
2.200
1.540
3.105
2.835
2.835
2.250
3.105
1.540
1.540
1.540
1.080
67.195

64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700
64.700

62.700
62.700
62.700
62.700
62.700
62.700
62.700
62.700
62.700
62.700
62.700
62.700
62.700
62.700
62.700
62.700
62.700
62.700
62.700
62.700
62.700
62.700
62.700
62.700
62.700
62.700
62.700
62.700
62.700

Remarks

Firestation
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

FW-Footings
F5(1250X1250X400)
F2(1300X1450X400)
F2(1300X1450X400)
F3(1650X1800X450)
F4(1100X1100X350)
F4(1100X1100X350)
F4(1100X1100X350)
F4(1100X1100X350)
F5(1250X1250X400)
F1(1500X1650X450)
F2(1300X1450X400)
F1(1500X1650X450)
F1(1500X1650X450)
F3(1650X1800X450)
F3(1650X1800X450)
F3(1650X1800X450)
F3(1650X1800X450)
F1(1500X1650X450)
F2(1300X1450X400)
F4(1100X1100X350)
F3(1650X1800X450)
F1(1500X1650X450)
F1(1500X1650X450)
F5(1250X1250X400)
F3(1650X1800X450)
F4(1100X1100X350)
F4(1100X1100X350)
F4(1100X1100X350)
F6(900x900x300)

Total

Grid A2
Grid A3
Grid A/4-5
Grid A/5-6
Grid 7A
Grid 8A
Grid 9A
Grid 10A
Grid B1
Grid B2
Grid B3
Grid B/4-5
Grid B/5-6
Grid B7
Grid B8
Grid B9
Grid B10
Grid C/2-3
Grid C5
Grid C6
Grid D1
Grid D2-3
Grid D4
Grid D5
Grid C-D/7
Grid C-D/8
Grid C-D/9
Grid C-D/10
Grid D6

For M/s.Unique Constructions


For GMR Infrastructure Ltd-EPC
Authorised Signature

page12age

Authorised Signature

Name of Work
W.O. No
Client
Contractor
R .A.Bill No.

Constructon of Firestation, Medical Unit, Parking Area, Main Gate House

:
:
:
:
:

GMR Infrastructure Ltd-EPC division


Unique Construction
1

MEASUREMENT SHEET
BOQ Item 3.01, Columns
S.No.

Description

Units

No's

Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
29

Quantity

Plinth
Bottom
Lvl

Footing Top
Lvl

66.300
66.300
66.300
66.300
66.050
66.050
66.050
66.050
66.300
66.300
66.300
66.300
66.300
66.050
66.050
66.050
66.050
66.150
66.300
66.300
66.150
66.150
66.300
66.300
66.050
66.050
66.050
66.050
66.300

62.800
62.800
62.800
62.850
62.750
62.650
62.650
62.650
62.800
62.850
62.800
62.850
63.250
62.750
62.750
62.750
62.750
62.850
62.700
62.650
63.250
63.250
62.750
62.750
63.250
63.150
63.150
63.150
63.100

Remarks

Firestation
FW For Columns Below
Plinth Lvl
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

C2A(450X450)
C3A(450X450)
C3A(450X450)
C2(450X450)
C3(450X450)
C3(450X450)
C3(450X450)
C3(450X450)
C2A(450X450)
C2(450X450)
C3A(450X450)
C1(450X450)
C2(450X450)
C2(450X450)
C2(450X450)
C2(450X450)
C2A(450X450)
C2(450X450)
C3A(450X450)
C4(450X450)
C2(450X450)
C2A(450X450)
C1(450X450)
C2A(450X450)
C2A(450X450)
C5(450X450)
C5(450X450)
C5(450X450)
SC1(250X250)

0.450
0.450
3.500
0.450
0.450
3.500
0.450
0.450
3.500
0.450
0.450
3.450
0.450
0.450
3.300
0.450
0.450
3.400
0.450
0.450
3.400
0.450
0.450
3.400
0.450
0.450
3.500
0.450
0.450
3.450
0.450
0.450
3.500
0.450
0.450
3.450
0.450
0.450
3.050
0.450
0.450
3.300
0.450
0.450
3.300
0.450
0.450
3.300
0.450
0.450
3.300
0.450
0.450
3.300
0.450
0.450
3.600
0.450
0.450
3.650
0.450
0.450
2.900
0.450
0.450
2.900
0.450
0.450
3.550
0.450
0.450
3.550
0.450
0.450
2.800
0.450
0.450
2.900
0.450
0.450
2.900
0.450
0.450
2.900
0.250
0.250
3.200
Total Qty. Below Plinth Beam

6.300
6.300
6.300
6.210
5.940
6.120
6.120
6.120
6.300
6.210
6.300
6.210
5.490
5.940
5.940
5.940
5.940
5.940
6.480
6.570
5.220
5.220
6.390
6.390
5.040
5.220
5.220
5.220
3.200
169.790

Grid A2
Grid A3
Grid A/4-5
Grid A/5-6
Grid 7A
Grid 8A
Grid 9A
Grid 10A
Grid B1
Grid B2
Grid B3
Grid B/4-5
Grid B/5-6
Grid B7
Grid B8
Grid B9
Grid B10
Grid C/2-3
Grid C5
Grid C6
Grid D1
Grid D2-3
Grid D4
Grid D5
Grid C-D/7
Grid C-D/8
Grid C-D/9
Grid C-D/10
Grid D6

For M/s.Unique Constructions


For GMR Infrastructure Ltd-EPC
Authorised Signature

page13age

Authorised Signature

S.No.

Description

Units

No's

Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
28

0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300

0.450
0.300
0.300
0.450
0.300
0.300
0.300
0.300
0.450
0.450
0.300
0.300
0.450
0.450
0.450
0.450
0.450
0.450
0.300
0.300
0.450
0.450
0.300
0.450
0.450
0.300
0.300
0.300

Quantity

Plinth
Bottom
Lvl

Footing Top
Lvl

69.550
69.550
69.550
69.550
71.300
71.300
71.300
71.300
69.550
69.550
69.550
69.550
69.550
71.300
71.300
71.300
71.300
69.400
69.550
69.550
69.400
69.400
69.550
69.550
71.300
71.300
71.300
71.300

66.300
66.300
66.300
66.300
66.050
66.050
66.050
66.050
66.300
66.300
66.300
66.300
66.300
66.050
66.050
66.050
66.050
66.150
66.300
66.300
66.150
66.150
66.300
66.300
66.050
66.050
66.050
66.050

Remarks

FW For Columns Below


Plinth Lvl To Roof Lvl
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28

C2A(300x450)
C3A(300x300)
C3A(300x300)
C2(300X450)
C3(300x300)
C3(300x300)
C3(300x300)
C3(300x300)
C2A(300X450)
C2(300X450)
C3A(300x300)
C1(300X300)
C2(300X450)
C2(300X450)
C2(300X450)
C2(300X450)
C2A(300x450)
C2(300X450)
C3A(300x300)
C4(300X300)
C2(300X450)
C2A(300x450)
C1(300X300)
C2A(300x450)
C2A(300x450)
C5(300X300)
C5(300X300)
C5(300X300)

3.250
3.250
3.250
3.250
5.250
5.250
5.250
5.250
3.250
3.250
3.250
3.250
3.250
5.250
5.250
5.250
5.250
3.250
3.250
3.250
3.250
3.250
3.250
3.250
5.250
5.250
5.250
5.250
Total
Total FW-Columns Quantity

4.875
3.900
3.900
4.875
6.300
6.300
6.300
6.300
4.875
4.875
3.900
3.900
4.875
7.875
7.875
7.875
7.875
4.875
3.900
3.900
4.875
4.875
3.900
4.875
7.875
6.300
6.300
6.300
154.650

Grid A2
Grid A3
Grid A/4-5
Grid A/5-6
Grid 7A
Grid 8A
Grid 9A
Grid 10A
Grid B1
Grid B2
Grid B3
Grid B/4-5
Grid B/5-6
Grid B7
Grid B8
Grid B9
Grid B10
Grid C/2-3
Grid C5
Grid C6
Grid D1
Grid D2-3
Grid D4
Grid D5
Grid C-D/7
Grid C-D/8
Grid C-D/9
Grid C-D/10

324.440

For M/s.Unique Constructions


For GMR Infrastructure Ltd-EPC
Authorised Signature

page14age

Authorised Signature

Name of Work
W.O. No
Client
Contractor
R .A.Bill No.

Constructon of Firestation, Medical Unit, Parking Area, Main Gate House

:
:
:
:
:

GMR Infrastructure Ltd-EPC division


Unique Construction
1

MEASUREMENT SHEET
BOQ Item 3.04, Beams
S.No.

Description

Units

No's

Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m
Cu m

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
4
2
4
4
2
2
2
2

12.695
19.700
2.500
22.600
2.450
12.695
12.650
4.500
8.400
12.695
8.000
6.950
5.450
4.800
4.955
2.000
5.100
7.405
5.200
4.950
5.350
4.800
2.700
10.050
10.000
10.000
0.325
0.325
0.600
0.500
0.325
0.325

Quantity

0.600
0.600
0.450
0.600
0.450
0.600
0.600
0.600
0.600
0.600
0.750
0.600
0.600
0.600
0.750
0.600
0.600
0.600
0.600
0.600
0.600
0.600
0.600
0.600
0.600
0.600
0.300
0.300
0.300
0.300
0.300
0.300
Total Qty

15.234
23.640
2.250
27.120
2.205
15.234
15.180
5.400
10.080
15.234
12.000
8.340
6.540
5.760
7.433
2.400
6.120
8.886
6.240
5.940
6.420
5.760
3.240
12.060
24.000
12.000
0.390
0.390
0.360
0.300
0.195
0.195
266.546

Remarks

Firestation
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32

FW For Plinth Beams


PB1(250x600)
PB2(250X600)
PB3(250X450)
PB4(250X600)
PB4(250X450)
PB5(250X600)
PB6(250X600)
PB7(250X600)
PB8(250X600)
PB9(250X600)
PB10(250X750)
PB11(250X600)
PB12(250X600)
PB13(250X600)
PB14(250X750)
PB14(250X600)
PB15(250X600)
PB16(250X600)
PB17A(250X600)
PB17(250X600)
PB18(250X600)
PB19(250X600)
PB20(250x600)
PB21(250X600)
PB22(250X600)
PB23(250X600)
PB2A(125x300)
PB2B(125X300)
PB12A(125X300)
PB12A(125X300)
PB1A(125X300)
PB1B(125X300)

For M/s.Unique Constructions


For GMR Infrastructure Ltd-EPC
Authorised Signature

page15age

Authorised Signature

Name of Work
W.O. No
Client
Contractor
R .A.Bill No.

:
:
:
:
:

Constructions of Firestation, Medical Unit, Parking Area, Main Gate House


GMR Infrastructure Ltd-EPC division
Unique Construction
1

MEASUREMENT SHEET
BOQ Item. 1.07, Supply and filling in foundations and the area whereever specified with approved good quality filling materials in plinths, area
development etc. wherever specified in layers of not exceeding 150 mm thick including breaking clods,storing,transportation ,double handling, watering,
compacting each layer with vibratory compactor and at unaccessible places with wooden/steel rammers to achieve 90 to 95% proctor density at optimum
moisture content, all leads and lifts, bailing/ pumping out of water to keep site dry while backfilling; cost shall include conveyance of all materials, labour,
machinery etc. complete as directed.The rate to includes loading,unloading, hire and fuel charges for tools and plants and other incidental charges etc.,
complete.
BOQ Item. 1.07.1, With Excavated earth available at site
S.No.

Description

Units

No's

Sqm
Sqm
Sqm

Avarage of
Plinth Beam
Botom Level

Average
NGL

464.330

66.177

64.700

603.047
533.688

66.177

64.700

1.477

230.641

66.177

64.700

1.477

329.095
279.868
813.556

66.177

64.700

1.477

1201.623

66.177

64.700

Total

-17.018
1184.605

Quantity

26.45

17.555

1.477

29.404

20.509

1.477

Sqm

15.325

15.050

Sqm
Sqm

18.279

18.004

Cum

Cum

Remarks

Firestation
Filling Up to Plinth Bottom
Lvl
Area @ Plinth Beam Bottom
lvl ( Part-1)
Area @ NGL lvl(Part-1)
Avarage Area(Part-1)
Area @ Plinth Beam Bottom
lvl (Part-2)
Area @ NGL lvl(Part-2)
Avarage Area(Part-2)
Total Area (Part-1 + Part-2)
Total Filling Quantity(Part1+Part-2)

Deductions
Columns M30 RCC

For M/s.Unique Constructions


For GMR Infrastructure Ltd-EPC
Authorised Signature

page16age

Authorised Signature

Name of Work
W.O. No
Client
Contractor
R .A.Bill No.

:
:
:
:
:

Constructions of Firestation, Medical Unit, Parking Area, Main Gate House


GMR Infrastructure Ltd-EPC division
Unique Construction
1

MEASUREMENT SHEET
BOQ Item. 1.07.4, Approved quality river sand brought from outside
S.No.

Description

Avarage of
Plinth Beam
Botom Level

Avarage of
Floor PCC
Bottom Level

18.098
123.015
5.175

66.175
66.175
66.175

66.675
66.675
66.675

0.500

76.770

66.175

66.675

0.30
Total

-27.700
-1.606
-9.186
184.565

Units

No's

Quantity

Area of Part - 01
Area of Part - 02
Area of Part - 03

Cum
Cum
Cum

1
1
1

6.350
20.850
7.500

5.700
11.800
1.380

0.500
0.500
0.500

Area of Part - 04

Cum

13.895

11.050

Cum
Cum
Cum

1
1
1

Remarks

Grid Marking

Firestation
Sand Filling Plinth Bottom
Lvl To Top Lvl

Grid: 1-2/B-D
Grid: 2-7/A-D
Grid: 2a-4/D-D1
Grid: 7-10/A Outer
To D Inner

Deductions
Plinth Beam RCC Qty.
Columns M30 RCC
Toilet Room Deduction

5.900

5.190

Grid: 2-3/A-B

For M/s.Unique Constructions


For GMR Infrastructure Ltd-EPC