Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Duration Days
Start Date
Finish Date
Project Name
Project Administration
Proposal and Bid Preparation Proposal Due Date USCAE RFP Acceptance Period Project Award Submit Bonds and Insurance Documentation Notice To Proceed
Initial Testing
Visual inspection and sampling Verify presence/absence of ? Determine levels if present Document quantity and location
Scaffold Design
Design containment system, elevated work platforms, temp supports, incidentals Submit design plan to Gov't
Structural Repairs Electrical Controls Replacement - hoist & switches Keeper Plate and Fastener Replacement
Weld Repairs Add/enlarge/repair drainage holes Replace Trunnion pin keeper plates and cap screws Daily QC Inspections Submit Gate Repair Record - 14d after gate completion
Concrete Repairs
Conduct repairs according to Concrete Repair Plan Concrete Removal Drilling and Grouting dowels, anchors, and reinforcing steel bars Crack Injection Crack or Joint Sealing Inspection of Prepared Surfaces - Mfg. & COR approval Concrete Placement Post Repair Inspection
Cathodic Protection
Install new cathodic anodes
Predecessors
Resource Names