Page 1 o TAKENAKA (MALAYSIA) SDN BHD GROUNDING RESISTANCE FOR POWER

Project Name : Date of Measurement : Model no. of Measure : Building Height Building Structure Lightning Rod Top Lebel from ground/material Grounding Electrode Rod Grounding Electrode Plate Sort of Soil / Water level Lightning Grounding Electrod Depth

(m) /

Pole

Page 1 of 1 Grounding Resistance for Power / Telephone / Lan (mark circle your choice)

Grounding Resistance for Power / Telephone / Lan (mark circle your choice)
Project Name Date of Measurement Model No. of Measure Building Height Building Structure Lightning Rod Top Lebel from ground/material Grounding Electrode Rod Grounding Electrode Plate Sort of Soil / Water level Lightning Grounding Electorode Depth Remarks 19 mm mm : : : TESCO-EXTRA,PLENTONG 9/5/2008 KYORITSU Earth Tester Model 4106 17,370 Meter Metal Roofing on RC Column. (m) / 1500 mm mmL Pole nos nos 3 (thickness)mm 2.8 Grounding Constractor CBH Engineering Sdn bhd Record No. 1 2 Calibration due date : location GL/AA-3 GL/AA-4 Grounding Resistance 4 4 5/1/2009 Total Resistance Measured by :

WH Choong (TM)/ LC Siong (CBH)

Clay Earth / 6.275m (top of electrode) 2 x 4.5

layout drawing direction N

Remarks

electrical works

Grounding Resistance for Power / Telephone / Lan (mark circle your choice)
Project Name Date of Measurement Model No. of Measure Building Height Building Structure Lightning Rod Top Lebel from ground/material Grounding Electrode Rod Grounding Electrode Plate Sort of Soil / Water level Lightning Grounding Electorode Depth Remarks 19 mm mm : : : TESCO-EXTRA,PLENTONG 9/5/2008 KYORITSU Earth Tester Model 4106 17,370 Meter Metal Roofing on RC Column. (m) / 1500 mm mmL Pole nos nos 4 GL/O-18 (2sets) 3.0 & 3.0 0.9 Grounding Constractor CBH Engineering Sdn bhd Record No. 1 2 3 Calibration due date : location GL/L-18 (2sets) GL/M-18 (2sets) GL/N-18 (2sets) Grounding Resistance 3.5 & 4.0 4.0 & 4.0 3.0 & 3.5 5/1/2009 Total Resistance Measured by :

WH Choong (TM)/ LC Siong (CBH)

3 (thickness)mm

Clay Earth / 6.275m (top of electrode) 8 x 4.5

layout drawing direction N

Remarks

electrical works

Lightning Grounding Resistance Measurement


Project Name Date of Measurement Model No. of Measure Building Height Building Structure Lightning Rod Top Lebel from ground/material Grounding Electrode Rod Grounding Electrode Plate Sort of Soil / Water level Lightning Grounding Electorode Depth layout drawing 19 mm : : : TESCO-EXTRA,PLENTONG 9/5/2008 KYORITSU Earth Tester Model 4106 17,370 Meter Metal Roofing on RC Column. Record 3 mm (m) / 1500 mm mmL Pole nos nos No. 1 2 3 4 5 Calibration due date : location GL/AA-6 GL/AA-12 GL/Q-6 GL/Q-12 GL/Q-15 Grounding Resistance 5 4 5 5 5 CBH Engineering Sdn bhd 5/1/2009 Total Resistance Measured by :

WH Choong (TM)/ LC Siong (CBH)

3 (thickness)mm

Clay Earth / 6.275m (top of electrode) 5 x 4.5

Grounding Constractor

layout drawing direction N

electrical works

Illumination Photometry (emergency lighting)


Project Name Date of Measurement Model No. of Measure Floor : : : Room name or Location lighting fitting fluorescent incandescent (W)nos (W)nos Remarks 00/00/2007 Calibration due date : measurement Max Min Measured by :

measure unit:

00/00/2007

electrical w

measure unit: lux

00/00/2007 Remarks

electrical works

Illumination Photometry (general lighting)


Project Name Date of Measurement Measure Floor Grd Grd Grd Grd Grd Grd Grd Grd Grd 1st 1st 1st 1st 1st 1st 1st 1st 1st 1st 1st 1st 1st Remarks : : : TESCO-EXTRA,PLENTONG 12/6/2008 KYORITSU ILLUMINOMETER (Model 5200) Value of measurement point 15 75 200 15 8 10 40 9 24 20 15 8 75 15 20 120 40 70 50 150 20 25 Design Lux 80 30 100 300 150 300 500 500 500 300 150 300 500 500 500 900 900 150 150 500 300 100 Calibration due date : Design Primary Lux 100 36 120 360 180 360 600 600 600 360 180 360 600 500 600 1080 1080 180 180 600 360 120 Measurement average * 150 50 175 350 160 335 550 510 650 325 200 500 550 510 570 1100 920 185 185 600 550 200 Measured by :

Measure unit: Lux

WH Choong (TM)/ Ben Chua (CBH)

19/4/2008 Remarks

Room name or location Faade External Carpark Internal Carpark M & E Room Staircase Lift Lobby Mall Area Toilets Food Court M & E Room Staircase Lift Lobby Mall Area Toilets Bazaar Sales Area Prep.Area BOH Warehouse Office Canteen Loading Bay

*measurement height must follow design condition(desigh calculation height). electrical works

Insulation Resistance Measuerment Record (lighting DB : 1 phase)


Project Name Date of Measurement Measure DB name Measurement : : : : circuit name No. Diagram No. circuit name 00/00/2007 Calibration due date : Measured by :

measure unit:

00/00/2007

DB name Measurement

: circuit name No. Diagram No. circuit name

Remarks

electrical w

measure unit:

00/00/2007

circuit name

Measurement

circuit name

Measurement

electrical works

Insulation Resistance Measuerment Record (power panel : 3 phase)


Project Name Date of Measurement Measure DB name : : : TESCO-EXTRA,PLENTONG 3/6/2008 ~ 13/6/2008 KYORITSU ( Isulation Tester )Model 3165 Load name Insulation resistance () *1 SSB/G/LP to DB-G/L DB-G/P SSB-FC SSB-UPS to DB-INV DB-SALE DB-UDB/F1 DB-UDB/F2 SSB/EG/LP to DB-EG/L DB-EG/P SSB-EFC 60A Travellator Isolator 60A Travellator Isolator 1000 1000 500 500 600 500 500 1000 1000 400 400 400 load/unload indication OK/NG OK OK OK OK OK OK OK OK OK OK OK OK trouble indication OK/NG OK OK OK OK OK OK OK OK OK OK OK OK Calibration due date : manual operation OK/NG OK OK OK OK OK OK OK OK OK OK OK OK automatic operation OK/NG Measured by :

Measure unit:

FC Wong (TM) / LC Siong (CBH)

5/1/2008 Remarks

interlocking OK/NG -

Good Good Good Good Good Good Good Good Good Good Good Good

Remarks

*1 : measure secondary side of electromagnetic switch electrical works

Page 1 of 1 TAKENAKA (MALAYSIA) SDN BHD INSULATION RESISTANCE MEASUREMENT RECORD (FEEDER)
measurement unit: M

PROJECT NAME :

AEON STATION 18 IPOH

Measured by :

Date of measurement : 12 APRIL 2012 Measure : KYORITSU 3001B FEEDER NAME WIRING METHOD

LOR KUAN CHUAN


Calibration due date :
Insulation resistance each phase between Insulation resistance each phase to grounding

MSB-C1 (Located at Electrical Room No.1)

R-Y 200 200

Y-B 200 200

B-R 200 200

R-N 200 200

Y-N 200 200

B-N 200 200

R 200 200

Y 200 200

B 200 200

N 200 200

SSB-TGV CP-TGV CHILLER

12X300mm2/1C XLPE/PVC (Al) 12X300mm2/1C XLPE/PVC (Al)

REMARKS Witnessed by:

*1: Fill in measurement of high voltage feeder only Electrical Works

Page 1 of 1

CHUAN
After voltage proof testing *1

al Works

Page 1 of 2 TAKENAKA (MALAYSIA) SDN BHD INSULATION RESISTANCE MEASUREMENT RECORD (FEEDER)
measurement unit: M

PROJECT NAME :
Date of measurement : Measure : FEEDER NAME

AEON STATION 18 IPOH


KYORITSU 300TB

Measured by :

Calibration due date :


Insulation resistance each phase between

17 JAN 2012
Insulation resistance each phase to grounding

WIRING METHOD

R-Y

Y-B

B-R

R-N

Y-N

B-N

REMARKS Witnessed by:

*1: Fill in measurement of high voltage feeder only Electrical Works

Page 2 of 2 TAKENAKA (MALAYSIA) SDN BHD INSULATION RESISTANCE MEASUREMENT RECORD (FEEDER)
measurement unit: M

PROJECT NAME :

AEON STATION 18 IPOH


Calibration due date :
Insulation resistance each phase between

Measured by:

Date of Measurement : Measure : KYORITSU 300TB FEEDER NAME WIRING METHOD

Insulation resistance each phase to grounding

R-Y

Y-B

B-R

R-N

Y-N

B-N

REMARKS Witnessed by:

*1: Fill in measurement of high voltage feeder only Electrical Works

Page 1 of 2

N 2012
After voltage proof testing *1

al Works

Page 2 of 2

After voltage proof testing *1

al Works

Page 1 of 3 TAKENAKA (MALAYSIA) SDN BHD INSULATION RESISTANCE MEASUREMENT RECORD (FEEDER)
measurement unit: M

PROJECT NAME :
Date of measurement : Measure : FEEDER NAME

AEON STATION 18 IPOH


KYORITSU 300TB

Measured by :

Calibration due date :


Insulation resistance each phase between

17 JAN 2012
Insulation resistance each phase to grounding

WIRING METHOD

R-Y

Y-B

B-R

R-N

Y-N

B-N

REMARKS WItnessed by:

*1: Fill in measurement of high voltage feeder only Electrical Works

Page 2 of 3 TAKENAKA (MALAYSIA) SDN BHD INSULATION RESISTANCE MEASUREMENT RECORD (FEEDER)
measurement unit: M

PROJECT NAME :

AEON STATION 18 IPOH


Calibration due date :
Insulation resistance each phase between

Measured by:

Date of Measurement : Measure : KYORITSU 300TB FEEDER NAME WIRING METHOD

Insulation resistance each phase to grounding

R-Y

Y-B

B-R

R-N

Y-N

B-N

REMARKS Witnessed by:

*1: Fill in measurement of high voltage feeder only Electrical Works

Page 3 of 3 TAKENAKA (MALAYSIA) SDN BHD INSULATION RESISTANCE MEASUREMENT RECORD (FEEDER)
measurement unit: M

PROJECT NAME :
Date of measurement : Measure : FEEDER NAME

AEON STATION 18 IPOH


KYORITSU 300TB

Measured by :

Calibration due date :


Insulation resistance each phase between

17 JAN 2012
Insulation resistance each phase to grounding

WIRING METHOD

R-Y

Y-B

B-R

R-N

Y-N

B-N

REMARKS Witnessed by:

*1: Fill in measurement of high voltage feeder only Electrical Works

Page 1 of 3

N 2012
After voltage proof testing *1

al Works

Page 2 of 3

After voltage proof testing *1

al Works

Page 3 of 3

N 2012
After voltage proof testing *1

al Works

Page 1 of 4 TAKENAKA (MALAYSIA) SDN BHD INSULATION RESISTANCE MEASUREMENT RECORD (FEEDER)
measurement unit: M

PROJECT NAME :
Date of measurement : Measure : FEEDER NAME

AEON STATION 18 IPOH


KYORITSU 300TB

Measured by :

Calibration due date :


Insulation resistance each phase between

17 JAN 2012
Insulation resistance each phase to grounding

WIRING METHOD

R-Y

Y-B

B-R

R-N

Y-N

B-N

REMARKS WItnessed by:

*1: Fill in measurement of high voltage feeder only Electrical Works

Page 2 of 4 TAKENAKA (MALAYSIA) SDN BHD INSULATION RESISTANCE MEASUREMENT RECORD (FEEDER)
measurement unit: M

PROJECT NAME :

AEON STATION 18 IPOH


Calibration due date :
Insulation resistance each phase between

Measured by:

Date of Measurement : Measure : KYORITSU 300TB FEEDER NAME WIRING METHOD

Insulation resistance each phase to grounding

R-Y

Y-B

B-R

R-N

Y-N

B-N

REMARKS Witnessed by:

*1: Fill in measurement of high voltage feeder only Electrical Works

Page 3 of 4 TAKENAKA (MALAYSIA) SDN BHD INSULATION RESISTANCE MEASUREMENT RECORD (FEEDER)
measurement unit: M

PROJECT NAME :
Date of measurement : Measure : FEEDER NAME

AEON STATION 18 IPOH


KYORITSU 300TB

Measured by :

Calibration due date :


Insulation resistance each phase between

17 JAN 2012
Insulation resistance each phase to grounding

WIRING METHOD

R-Y

Y-B

B-R

R-N

Y-N

B-N

REMARKS Witnessed by:

*1: Fill in measurement of high voltage feeder only Electrical Works

Page 4 of 4 TAKENAKA (MALAYSIA) SDN BHD INSULATION RESISTANCE MEASUREMENT RECORD (FEEDER)
measurement unit: M

PROJECT NAME :
Date of measurement : Measure : FEEDER NAME

AEON STATION 18 IPOH


KYORITSU 300TB

Measured by :

Calibration due date :


Insulation resistance each phase between

17 JAN 2012
Insulation resistance each phase to grounding

WIRING METHOD

R-Y

Y-B

B-R

R-N

Y-N

B-N

REMARKS Witnessed by:

*1: Fill in measurement of high voltage feeder only Electrical Works

Page 1 of 4

N 2012
After voltage proof testing *1

al Works

Page 2 of 4

After voltage proof testing *1

al Works

Page 3 of 4

N 2012
After voltage proof testing *1

al Works

Page 4 of 4

N 2012
After voltage proof testing *1

al Works