M.S. Al-Suwaidi Industrial services co. ltd.

,
Construction of New Flare, Ar-Razi
Daily Report
7-May-12
Sl.
No.

Acitivity

Location

Qty

UOM

Start date

Finish date

Daily (As of 07-May-12)


Plan %

Actual % Variance %

Cumulative
Plan %

Actual %

Remarks

Variance %

Civil
Construction of open ditch

Plant 1

10

CM

24-Mar-12

12-May-12

0.54%

0.24%

-0.30%

96.86%

95.05%

Concrete Paving works

Plant 1

lot

26-Mar-12

8-May-12

0.19%

0.00%

-0.19%

99.43%

61.74%

-37.69% Waiting for concrete

-1.81% Surface Preparation is in progress

Construction of open ditch

Plant 2

10

CM

24-Mar-12

29-May-12

1.45%

0.00%

-1.45%

98.69%

82.15%

-16.54% Waiting for concrete

Concrete Paving works

Plant 2

lot

26-Mar-12

8-May-12

3.61%

0.26%

-3.35%

44.31%

58.26%

Construction of open ditch

Plant 3

10

CM

14-Apr-12

15-May-12

0.54%

2.00%

1.46%

96.86%

76.68%

Concrete pouring of wall, surface preparation,


Plant 5
painting & backfilling of W-5751 Seal drum
drain pit

Lot

24-Mar-12

6-May-12

0.08%

0.12%

0.04%

99.82%

99.27%

Concrete Paving works

Plant 5

Lot

2-Apr-12

7-Jun-12

2.01%

0.74%

-1.27%

26.73%

33.82%

Misc Pipe Support & E&I support

Plant 5

Lot

2-Apr-12

2-Jun-12

1.94%

0.38%

-1.56%

78.01%

35.65%

Plant 1

1.00

Lot

1-May-12

7-May-12

16.47%

5.00%

-11.47%

99.80%

97.00%

-2.80% alignment is in progress

Plant 1

1.00

Lot

25-Mar-12

23-May-12

0.31%

4.00%

0.50%

93.47%

90.00%

-3.47% alignment is in progress

Plant 1

1.00

Lot

24-Mar-12

28-Jun-12

0.12%

0.00%

-0.12%

60.60%

59.41%

-1.19% waiting for scaffolding

Plant 1

1.00

Lot

24-Mar-12

7-Jul-12

0.00%

1.62%

1.62%

83.32%

86.12%

2.80% waiting for scaffolding

Plant 2

1.00

Lot

24-Mar-12

17-Jun-12

0.69%

1.25%

0.56%

52.89%

60.59%

7.70% Scaffolding Erection completed

13.95% Sand filling for Paving is in progress


-20.18% Surface Preparation is in progress
-0.55% Backfilling is in prgress
7.09% Backfilling, rebar & formwork installation in progress
-42.36% Installation of Pre-cast support is in progress

Structural
Alignment & bolt tightening of SP-13
Preassembly, Erection, alignment & bolt
tightening of OSUS
Preassembly, Erection, alignment & bolt
tightening of OSMP-29
Preassembly, Erection, alignment & bolt
tightening of OSMP-45
Preassembly, Erection, alignment & bolt
tightening of OS for Synthesis Section
Erection, Alignment & Bolt tightening of PR
210

Plant 4

1.00

Lot

3-Apr-12

7-May-12

0.66%

0.00%

-0.66%

95.51%

94.31%

-1.20% alignment is in progress

Erection of PR 145 a,b,c with alignment & bolt


Plant 5
tightening

1.00

Lot

24-Mar-12

23-May-12

0.25%

0.62%

0.37%

96.48%

94.30%

-2.18% Scaffolding erection is in progress

Preassembly, erection of OS around Flare


stack with alignment & bolt tightening

1.00

Lot

14-Apr-12

10-Jun-12

1.39%

0.00%

-1.39%

82.88%

75.25%

-7.63% Waiting for Scaffolding

Plant 5

Mechanical & Piping


At Site
Fitup of Pipe Spools (Pre-shutdown)

Plant1,2,5, CPR16590 Dia Inch

27-Mar-12

15-Jul-12

0.92%

1.02%

0.11%

27.48%

24.77%

-2.71%

Shortage of scaffolding material and Priority of spools &


supports not available

Welding Of Pipe Spools (Pre-shutdown)

Plant1,2,5, CPR16950 Dia Inch

27-Mar-12

15-Jul-12

0.91%

0.32%

-0.60%

25.54%

22.96%

-2.58%

Shortage of scaffolding material and Priority of spools &


supports not available

Fitup of Pipe spools

Fabshop

36685 Inch Dia

27-Mar-12

20-Jun-12

0.59%

0.58%

-0.01%

88.32%

90.55%

2.23%

Welding of Pipe spools

Fabshop

36685 Inch Dia

27-Mar-12

20-Jun-12

0.87%

0.80%

-0.07%

82.51%

79.68%

-2.83%

At Fabshop

Electrical
Grounding works

Plant 1

Lot

27-Mar-12

27-May-12

0.00%

0.73%

0.73%

62.50%

72.81%

10.31% Work in progress

Lighting Works

Plant 1

Lot

29-Mar-12

15-Jul-12

0.88%

0.11%

-0.77%

36.95%

35.18%

-1.77%

Installation of Conduits with Support

Plant 1

Lot

2-Apr-12

17-May-12

1.74%

0.00%

-1.74%

85.69%

80.00%

-5.69% Work in progress

1 of 3

Work in progress. It depends on the structural Operation


erection.

M.S. Al-Suwaidi Industrial services co. ltd.,


Construction of New Flare, Ar-Razi
Daily Report
7-May-12
Sl.
No.

Acitivity

Location

Qty

UOM

Start date

Finish date

Daily (As of 07-May-12)


Plan %

Grounding works

Plant 2

Installation 0f Conduits with Support

Plant 2

Grounding works

Plant 3

Installation 0f Conduits with Support

Plant 3

Grounding works

Plant 5

Cable tray installation

C. Pipe Rack

Installation of Supports for Cable Tray

C. Pipe Rack

Cable Pulling

Plant 2

Actual % Variance %

Cumulative
Plan %

Actual %

Remarks

Variance %

Lot

9-Apr-12

25-Apr-12

5.00%

0.00%

-5.00%

67.25%

77.40%

10.15% Work in progress

Lot

2-Apr-12

7-May-12

1.90%

0.00%

-1.90%

98.48%

95.00%

-3.48% Scaffolding is required

Lot

5-Apr-12

16-Apr-12

5.26%

6.51%

1.25%

62.09%

80.63%

18.54% Work in progress

Lot

2-Apr-12

16-Jun-12

2.11%

0.88%

-1.23%

32.50%

40.00%

Lot

7-Apr-12

15-May-12

1.39%

2.00%

1.00%

90.19%

80.12%

Lot

1-Feb-12

14-Jun-12

0.80%

0.00%

1.00%

73.97%

65.20%

-8.77% Waiting for scaffolding

Lot

24-Jan-12

10-Jun-12

0.58%

0.00%

-0.58%

73.77%

66.12%

-7.65% Waiting for scaffolding

Lot

24-May-12

7-Jun-12

2.20%

7.00%

4.80%

2.20%

14.00%

11.80% Work in progress

7.50% Scaffolding is required


-10.07% Work in progress

Instrumentation

Construction Progress

0.34%

0.24%

-0.10%

61.46%

60.63%

-0.83%

Fitup

216

213.75

-2.25

32399

33217

818

Welding

319

293.5

-25.5

30268

29230

-1038

Fitup

152

170

18

4559

4109

-450

Welding

155

54

-101

4329

3892

-437

Pressure test of Valves (in Nos)

12

11

-1

46

28

-18

Pressure test of Piping (Packages)

PWHT

Shop Weld

Field Weld

Manpower :
Sl
No.

1
2

SIS NonSaudi

SIS-Saudi

Total

Site

78

10

88

Fab shop

18

18

Site

349

21

370

Description

Indirect
Direct

Fab shop
Total SIS
Total Sub-contractor

94

96

539

33

572
0

Grand Total Manpower

572

Equipments :
Sl
No.

Description
Indirect

Qty.
25

2 of 3

As per recovery plan rev 04

M.S. Al-Suwaidi Industrial services co. ltd.,


Construction of New Flare, Ar-Razi
Daily Report
7-May-12
Sl.
No.
2
Total

Acitivity

Location

Qty

UOM

Start date

Finish date

Daily (As of 07-May-12)


Plan %

Direct

Actual % Variance %

87
112

3 of 3

Cumulative
Plan %

Actual %

Variance %

Remarks