Sei sulla pagina 1di 8

TABLE OF CONTENTS

SI NO. 1 2 3 4 5

DESCRIPTION SCOPE REFERENCE FORMULA TO BE USED NO OF FITTINGS CALCULATION SUMMARY

PAGE NO. 1 1 2 3 7

DOC. TITLE : Lighting Calculation for Facilities at Sea Water Intake Pump House & Jetty Sheet 1 of 7 DOC. NO. : 6104-EL-DSN-700-1009

LIGHTING DESIGN CALCULATION DOCUMENT 1.SCOPE: The scope of the calculation is to design the lighting for sea water in take pump house with the given illumination level. 2.REFERENCE: 1.IS:3646-code of practice for illumination 2.Cromton greaves lighting catalouge 3.Sizing criteria as per CI.NO.B7.9.9 of contract technical specification no.B7.9-illumination system.

The Lighting calculation have been carried out for the following area in sea water in take pump house and jetty based on the lux level requirement as tabulated below. SI.no 1 2 3 4 5 6 7 8 9 Switchgear room UPS battery charger room Battery room Control equipment room Engg.room Operator station Mobile cleaning device room Pump room Jetty AREA REQUIRED LUX LEVEL 200 200 150 400 150 200 200 200 10

Maintenance factor Control room and A/C rooms Other areas Height of the working plane Central control room other areas pump room :0.85m :0.00m :0.00m DEVELOPMENT CONSULTANTS PVT LTD. CONSULTING ENGINEERS :0.75 :0.7

CHENNAI PETROLEUM CORPORATION LTD. 5.8MGD DESALINATION PLANT

DOC. TITLE : Lighting Calculation for Facilities at Sea Water Intake Pump House & Jetty Sheet 2 of 7 DOC. NO. : 6104-EL-DSN-700-1009 Note: 1.The type fitting to be used are given below (cromtom greaves catalouge): SI.no 1 2 3 4 5 6 7 8 9 Area Switchgear room (vitreous enameld) UPS and battery charger,battery rom(corrosion proof) Control equipment room(decorative type) Mobile cleaning device room(HPMV) and Pump room(HPMV ) Street light(HPSV) Stair case Emergency D.C lighting Toilets Approach Road Type of fixture IGP1324EB(2X40W) IPFC1124EB(2X36W) CRFD24EB(2X36W) IHB1325IH(250W) SSG1315IH(150W) IGP1214EB+RVE14 (36W) IBH1110BC IGP1214EB+RVE14 (36W) IGP1214EB+RVE14 (36W)

3. FORMULA'S TO BE USED: LxB Room Index Where L B H = = = Length of area to be illuminated Breadth of area to be illuminated Mounting height of light fitting above working plane L x B x IR No.of Fittings (NC) = LOxCOUxMFxLLD Illumination level in lux, NR x COU x LO x MF x LLD IL Where NC NR IR IL COU LO MF LLD = = = = = = = = No. of light fittings calculated No. of light fittings Recommended Illumination required Illumination level in lux Co-efficient of utilisation Lamp output in lumen Maintenance factor Lamp lumen depreciation factor (for fluorescent lamps only) DEVELOPMENT CONSULTANTS PVT LTD. CONSULTING ENGINEERS = LxB = (L + B)XH

CHENNAI PETROLEUM CORPORATION LTD. 5.8MGD DESALINATION PLANT

DOC. TITLE : Lighting Calculation for Facilities at Sea Water Intake Pump House & Jetty Sheet 3 of 7 DOC. NO. : 6104-EL-DSN-700-1009 4.NO.OF FITTINGS CALCULATION LIGHTING DESIGN CALCULATION AT SWITCHGEAR ROOM SWITCH GEAR ROOM(PART-1) 11.6 8.18 4.25 SWITCH GEAR ROOM(PART- 2) 12.89 5 4.25

AREA Length of the room(L in mtrs) Breadth of the room(B in mtrs) Height of room from FFL (in mtrs) Mounting height above working plane(H in mtrs) Room index Reflection factor Ceiling wall floor Co-efficient of utilisation(COU) Maintenance factor(MF) Recommended illumination (lux) capacity of lamp in watts Type of fitting lamp output in lumens No.of fittings calculated No. of fittings recommended Actual illumination level based on estimation in lux.

4.25 1.13 70 50 10 0.49 0.7 200 2X36 IGP1324HSB+RPC24 4900 12.55 13

4.25 0.85 70 50 10 0.43 0.7 200 2X36 IGP1324HSB+RPC24 4900 9.71 10

207.24

205.96

Note : As the specification call for VE reflector, since the VE reflector are not in market Powder Coating(PC) reflector which are equivalent to VE reflector are used.

CHENNAI PETROLEUM CORPORATION LTD. 5.8MGD DESALINATION PLANT

DEVELOPMENT CONSULTANTS PVT LTD. CONSULTING ENGINEERS

DOC. TITLE : Lighting Calculation for Facilities at Sea Water Intake Pump House & Jetty Sheet 4 of 7 DOC. NO. : 6104-EL-DSN-700-1009 LIGHTING DESIGN CALCULATION AT BATTERY ROOM AND CHARGER ROOM UPS BATTERY CHARGER ROOM 3.5 3.3 4.25

AREA

BATTERY ROOM

Length of the room(L in mtrs) Breadth of the room(B in mtrs) Height of room from FFL (in mtrs) Mounting height above working plane(H in mtrs) Room index Reflection factor Ceiling wall floor Co-efficient of utilisation(COU) Maintenance factor(MF) Recommended illumination (lux) capacity of lamp in watts Type of fitting lamp output in lumens No.of fittings calculated No. of fittings recommended Actual illumination level based on estimation in lux.

5 1.987 4.25

4.25 0.33 70 50 10 0.25 0.7 150 2X36 IPFC1124EB 5100 1.86 2 161.7

4.25 0.4 70 50 10 0.25 0.75 200 2X36 IPFC1124EB 5100 2.68 3 223.54

CHENNAI PETROLEUM CORPORATION LTD. 5.8MGD DESALINATION PLANT

DEVELOPMENT CONSULTANTS PVT LTD. CONSULTING ENGINEERS

DOC. TITLE : Lighting Calculation for Facilities at Sea Water Intake Pump House & Jetty Sheet 5 of 7 DOC. NO. : 6104-EL-DSN-700-1009

LIGHTING DESIGN CALCULATION AT CENTRAL CONTROL ROOM AREA CONTROL EQUIPMENT ROOM ENGG. ROOM OPERATOR STATION

Length of the room(L in mtrs) Breadth of the room(B in mtrs) Height of room from FFL (in mtrs) Mounting height above working plane(H in mtrs) Room index Reflection factor Ceiling wall floor Co-efficient of utilisation(COU) Maintenance factor(MF) Recommended illumination (lux) capacity of lamp in watts Type of fitting lamp output in lumens No.of fittings calculated No. of fittings recommended Actual illumination level based on estimation in lux.

4 3.31 7.5

3.31 2 7.5

5 4.95 7.5

4 0.45 70 50 10 0.32 0.75 400 2X36 CRFD24EB 4900 5 5

4 0.31 70 50 10 0.32 0.75 150 2X36 CRFD24EB 4900 0.94 1

4 0.62 70 50 10 0.4 0.75 200 2X36 CRFD24EB 4900 3.74 4

399.7

159.88

213.82

CHENNAI PETROLEUM CORPORATION LTD. 5.8MGD DESALINATION PLANT

DEVELOPMENT CONSULTANTS PVT LTD. CONSULTING ENGINEERS

DOC. TITLE : Lighting Calculation for Facilities at Sea Water Intake Pump House & Jetty Sheet 6 of 7 DOC. NO. : 6104-EL-DSN-700-1009 LIGHTING DESIGN CALCULATION AT PUMP ROOM SCREEN WASH PUMP AREA 8.18 7.8 7.2 SEA WATER PUMP ROOM 11.6 6.7 13.75

AREA

Length of the room(L in mtrs) Breadth of the room(B in mtrs) Height of room from FFL (in mtrs) Mounting height above working plane(H in mtrs) Room index Reflection factor Ceiling wall floor Co-efficient of utilisation(COU) Maintenance factor(MF) Recommended illumination (lux) capacity of lamp in watts Type of fitting lamp output in lumens No.of fittings calculated No. of fittings recommended Actual illumination level based on estimation in lux.

6.4 0.62 70 50 10 0.56 0.7 200 250 IHB1325IH 13500 2.41 3

12.82 0.33 70 50 10 0.49 0.7 200 250 IHB1325IH 13500 3.36 4

248.82

238.32

CHENNAI PETROLEUM CORPORATION LTD. 5.8MGD DESALINATION PLANT

DEVELOPMENT CONSULTANTS PVT LTD. CONSULTING ENGINEERS

DOC. TITLE : Lighting Calculation for Facilities at Sea Water Intake Pump House & Jetty Sheet 7 of 7 DOC. NO. : 6104-EL-DSN-700-1009

5.SUMMARY OF THE FITTINGS

S.NO 1 2 3 4 5 6 7 8 9 10 11 12

TYPE OF FITTING IGP1324HSB+RPC24 ( Switgear Room) IPFC1124EB (Battery Room) CRFD24EB (Control Equipment Room(CER), Operator Station, Enginner Room, Entrance of CER) IHB1325IH ( Pump Room) IHB1325IH ( Screen Wash Pump Area) SSG1315IH (Approach Jetty) IGP1214EB+RVE14 ( Staircase) IGP1214EB+RVE14 (Cable Cellar Room) IGP1214EB+RVE14 (Toilets) IGP1214EB+RPC14 (Switchgear room Entrance, Entrance to CER from Screen Wash Area) IBH1110BC (Emergency D.C lights) SSG1315IH (Approach Road in Jetty)

QUANTITY 23 5 11 7 2 18 8 2 4 2 10 2

TOTAL WATTS 2X36 2X36 2X36 250 250 150 1x36 1x36 1x36 1x36 100 1x36

CHENNAI PETROLEUM CORPORATION LTD. 5.8MGD DESALINATION PLANT

DEVELOPMENT CONSULTANTS PVT LTD. CONSULTING ENGINEERS