Danish Engnieers behind the World's largest Cable Stayed Bridges: Sutong and Stonecutters Bridge
Tina VEJRUM Senior Project Manager, Bridges - COWI A/S
November 2008
Location China Hong Kong, China Japan France South Korea China China
1088 m 1018 m 890 m 856 m 800 m 730 m 708 m 648 m 628 m 620 m 618 m 605 m 602 m
November 2008
November 2008
Main Bridge (Cable Stayed Bridge) 100 + 100 + 300 + 1088 + 300 + 100 + 100m spans
Special Fairway Bridge (Rigid Frame balanced cantilever bridge) 140+ 268 +140m spans
November 2008
November 2008
November 2008
November 2008
Concrete Pylons Closed Steel Box Girder Parallel wire cable stays
8
November 2008
November 2008
10
November 2008
Numerical Studies, incl DVMFlow Section Model - Tongji Large Scale Section Model (High Re) Tongji /Force Technology Free standing Pylon - Tongji Cable Stay drag coefficient Tongji/CARDC Rain-wind induced vibrations of cable stays Tongji/CARDC Full Bridge Model - Tongji
11
November 2008
Pile group dimension: 48 x 114 m 131nos 2.8m 120m long in-situ cast bored piles Capacity of each pile 100 MN (with full scour) Max UR= 0.88 (Safety factor = 2.0)
#
12
November 2008
13
November 2008
14
November 2008
15
November 2008
16
November 2008
17
November 2008
18
November 2008
SHA TIN
KOWLOON AIRPORT
19
November 2008
20
November 2008
STONECUTTERS BRIDGE
Design Competition January 2000
21
November 2008
Client: Highways Department, Hong Kong S.A.R. Designer: Ove Arup & Partners, Ltd. COWI A/S Contractor: MHYH JV (Maeda - Hitachi - Yokogawa - Hsin Chong Joint Venture)
22
November 2008
23
November 2008
24
November 2008
25
November 2008
26
November 2008
Winning Design
- upper part of tower in steel
27
November 2008
Reference Scheme
28
November 2008
29
November 2008
30
November 2008
Condition In-service, smooth flow RS Tower In-service, turbulent flow Free, smooth flow Free, turbulent flow In-service, smooth flow All-concrete Tower In-service, turbulent flow Free, smooth flow Free, turbulent flow
Deflection (Max) 0.46 m 0.45 m 0.32 m 0.43 m 0.07 m 0.05 m 0.16 m 0.09 m
31
November 2008
All Steel
Comp 1
0.2 0.1
Comp 2
0 0 10 20 30 40 Scruton no., Sc 50 60 70 80
DMI wind tunnel test results, turbulent flow DMI test results, October 2001, turbulent flow GVPO fit to DMI test results, 1. procedure, Desk study report GVPO fit to DMI test results, 2. procedure, Desk study report DMI Test results, October 2001, Smooth flow
#
32
November 2008
33
November 2008
34
November 2008
Displacement [m]
35
November 2008
36
November 2008
V i 20 Vm
37
November 2008
38
November 2008
200
400
600
Highway Loading -150 Distance from centre of bridge (m) Mean Wind Mean Wind & Buffeting
39
November 2008
40
November 2008
41
November 2008
42
November 2008
43
November 2008
44
November 2008
45
November 2008
46
November 2008
47
November 2008
48
November 2008
49
November 2008
50
November 2008
51
November 2008
52
November 2008
53
November 2008
54
November 2008
55
November 2008
2m
2m
78.5 mPD 2m
78.5 mPD
4m
4m
56
November 2008
57
November 2008
58
November 2008
Maximum Weight:
570t
59
November 2008
60
November 2008
61
November 2008
62
November 2008
63
November 2008
64
November 2008
65
November 2008
66
November 2008
67
November 2008
Key Figures Structural Steel: Deck Segments Anchor Boxes SS Skins 33,500t 1,000t 1,600t Stay Cables: Weight Longest Stay Cable, Length Longest Stay Cable, Weight 7,200t 540m 75t