Solar Pumping in General

Why solar Pumps


50 % of energy produced in the world is used in operating various kind of Pump Independence from Grid Pollution & Noise free Low maintenance Early pay back period Environment friendly Long life

Type of Pumps
Submersible Pump 1800 Wp with 0.75 HP Grundfos Pump. Maximum Suction Capacity : 50 M 53,000 LPD at 30 M TDH Application Agriculture, Drinking Water

400 1200 Wp Grundfos SQ Flex Pump Revolutionary Pump works on Grid, Solar, Wind & Diesel Maximum suction 120 M 20,000 LPD at 45 M TDH Application Domestic & Community water supply

Surface Pump
Centrifugal / Surface 900 Wp Array with 1 HP Pump. 1800 Wp Array with 2 HP Pump. Maximum Suction Capacity: 7.5 M Total Head Suction + Delivery: 15 M

Capacity of pumps
1 HP Pump. : 75,000 Liters Per Day (LPD) at 10 M Total Discharge Head 2 HP Pump: 1, 40,000 LPD at 10 M TDH.

Applications Flood Irrigation Drip Irrigation Community water supply Fish Farming Poultry Farming Cattle Watering

Community Water Supply

Flood Irrigation

Cattle Watering

Drip Irrigation

Total No of Solar Pumps Installed by Aurore Till Date

SPS installed Total kWp 1993-1999 2001 2002 2003 TOTAL 225 219 231 363 1038 235 395 415 643 1688

Punjab Experience

Before Solar pumps


Erratic Grid Supply High cost of Pumping - using Diesel Logistics of getting Diesel to site High Maintenance cost Regular Supervision Pollution and Noise Inefficient Pumps Remote site - Expensive to Get grid

Effect in Punjab
Taken Off 1,700 Solar Pumps In three years 2004 700 pumps to be installed Attractive price due to additional subsidy by State Government Early pay back period Reliable power supply More saving due to low maintenance Hassle Free Demand for Bigger Pump Faith in Alternative Source of Power

Aurore & SPV Pumping in Punjab


Energy Service Company (ESCo) 5 year Annual Maintenance Contract Field support office in Bathinda, Punjab Service call response time: < 3 days Trained Technicians Promotion of Solar Products Reliable Service Year 2001 2002 2003 TOTAL SPS in Punjab & Haryana 175 200 280 655

Installation
Human Resource
One Project Manager, 4 Team Leaders, 4 People in each team Challenge To maintain enthusiasm & tempo Site Location Spread across 200 km from the base camp Operating in 5 Districts Working Conditions Severe climatic conditions ( Extreme cold in winter to temperatures in excess of 47 degrees Celsius in summer) 7 days a week Detailed Planning Necessary for installing the system in a day Site should be ready Materials & End user at site

Logistics Transporting labour to site Transporting heavy material Concrete blocks to be taken to site Civil work at site Deadline Within three months

Non Stop Action

Civil Work at Site

Human Resource

Foundation

Working Team

Work At Site

Pump Installation

Severe Climatic Conditions

Effect of Solar Pumping In Punjab


Mature Solar Pump Market Financially Beneficial High Subsidy Result Early Pay Back Awareness & Trust in Solar Energy Growing Solar Market - Demand for Solar Products Plenty of trained labour Employment opportunity - Demand for Trained Solar Technicians Confidence in Labour to handle complex installation Due to Training Realise the importance of training and quality installation