New Site Integration Check list Design Database check from Netact Parameter audit from BSC Parameter

er dump/Netact Frequency/BSIC plan check from 111 Report/Netact MML Session/MIPT tool Neighbor plan check from 074 Report/MIPT tool Existing hardware alarm check from MML Session TEMs cell file is updated(new sites included) Prerequisites for Drive Tester before DT Ensure that TEMs cell file is Updated(containing Frequency and Neighbor plan of new site to be drive tested). Must ensure adequate credit availability in all test Sims (both Post/Pre Paid Sims) Ensure drive test equipment is ready. Respective person must connect and check the drive test kit outside the office premises before leaving for DT of new site. Ensure that rigger should accompany him to new site for physical site audit (HBA/ Orientation/Tilts/Antenna Type verification) Before leaving for Drive Test, Engineer will inquiry from NSN/Subcon about the current status of the site. Will also ensure that Work Order Number has been generated for the new site to be visited

Drive testing Check list In field, Engineer will drop the Rigger on site for complete Site Audit and will proceed for Drive Test Drive test process could be divided into two phases First step of DT involves Freq/BSIC verification, CGI verification, call connectivity, TRX/MIAO testing and Static Edge/GPRS testing. Second step involves clockwise/Anti clockwise Intra site HO testing for each sector and Inter-site Handover testing. Inter BSC HO testing incase of new site at BSC border. Incase of Inter-cell Call and Edge handover testing, following point must be ensure; o Engineer must completely traverse the inter-site distance from each respective source cell to target cell for each sector to check outgoing Handovers. o Similarly he should back trek the same inter-site path/road from neighboring sectors to new site sector to check its incoming handovers o Forced handover feature of TEMs must only be used if Engineer encounters un-traversable terrain.

Resolution of issues in Field Any discrepancies found in physical database (Antenna Type, Orientation, Tilts) must be reported immediately to concerning NSN/Subcon representative. Must complete Drive Testing after issue resolution Any issues related to Call Connectivity/CGI disparity must be communicated to NSN/Subcon in field and LCC representative in office. Complete the Drive test after issue resolution. Any discrepancies found in Freq/BSIC/Neighbor plan found during Drive test must be communicated immediately to concerning LCC person in office. Continuation of Drive testing before issue resolution lies solely on field engineer discretion. If he feels that these discrepancies are service affecting than he should wait for there rectification. Any issues observed related to degraded Rx level/Quality on any TRXs must reported to NSN/Subcon team present at site. They must perform TRX health check/VSWR check and also ensure that RF Connectors are not loose. Must re-initiate DT after issue resolution Any issue related to non availability of EDGE/GPRS service must be reported to both NSN/Subcon team in Field and LCC representative in office. Drive testing Engineer must ensure that proper EDGE/GPRS testing be completed after resolution of issue.

Potrebbero piacerti anche