2008

Hybrid Wind/Solar Power for Rural Telephony Green Solution to Power Problems

First Report of the committee On Non-conventional Energy To Power Rural Telephony


Department of Telecommunications

2|Page

First Report of the committee

on

Non-conventional Energy To Power Rural Telephony

November 2008

DOT Committee on Renewable Energy 2008

3|Page

TABLE OF CONTENTS Sl No 1. 2. 3. 4. 5. 6. 7. 8. 9. 10 11. 12. DOT Committee on Renewable Energy Introduction Non Conventional Energy-Solar, Wind & Hybrid Systems Appropriate Geographical Region Observations on typical BTS Power Requirement in Shared Sites(USOF) System specifications & Design System Overview Operational difficulties Cost Effectiveness TRAI Recommendations Implementation strategy for renewable energy system in shared mobile infrastructure sites Committee Recommendations Annexures 24 26-66 12 16 17 19 20 21 5 6 7 10 11 Topic
Page No.

DOT Committee on Renewable Energy 2008

4|Page

INDEX OF ANNEXURES Sl No. 1 2 3 4 5 6 Solar Insolation Diagram of India Wind Map of India Equipment Load measured at various BTS sites Rating Calculations Single Line Diagram of existing system Technical Specifications Solar Photovoltaic cell Battery Bank Charge control unit Wind turbine generator 7 8 9 10 11 USOF Past initiatives and relevant rulings Calculation of DG Operation Hours for Various Options Bar Chart Financial Calculations Capex, Payback Period etc Layout diagram of USOF Phase-I site for SPV 51 55 56 59 66 26 27 28 32 34 35 Topic Page No.

DOT Committee on Renewable Energy 2008

5|Page

DOT COMMITTEE ON RENEWABLE ENERGY

A committee consisting of following officers was constituted vide DOT reference 32-4/2008-EW dated 11.6.2008 to examine the use of non-conventional energy power system for rural telephony :

1. 2. 3. 4.

Sh. P.K. Panigrahi, Sr. DDG (BW), DOT Smt. Archana Goyal Gulati, Jt. Administrator. (Fin), DOT Sh. U.K. Srivastava, DDG (SAT), TEC Sh. Rajesh Katyal, Unit Chief (C-WET), MNRE, Chennai

Terms of Reference

Feasibility Appropriate geographical region System specifications/design Cost effectiveness Operational difficulties Applicability Pilot projects

DOT Committee on Renewable Energy 2008

6|Page Introduction:

Extract from THE MINT, 4-07-08 New Delhi: The boom in demand for telecom services in India is ringing the till in an unlikely quarter: makers of diesel-powered electricity generators. As phone firms here expand networks, adding record number of customers every monthin March, more than 10 million new connections were sold, equivalent to the population of Paris or Shanghaithey find they cant buy enough generators to power their cellular towers. The demand for generator sets, called gensets in short, that can juice up the equipment and electronics at cellular base station towers, is estimated by analysts at more than 200,000 last year and is predicted to expand at between 15% and 20% a year in the years ahead. Telecom towers have radio antennas planted on them, which transmit signals for enabling wireless communication between mobile handsets. This new demand for gensets, expanding at just around 10% until last year, is driven by expansion of telecom infrastructure in rural areas, where constant and consistent electricity supply is a rarity. The extensive roll-out of telecom towers in rural and interior areas is the main reason, as power availability is either inadequate or nonexistent in these areas, said Ajay Madan, chief executive (telecom), Essar Telecom Infrastructure Pvt. Ltd (ETIPL). In 2006, about 55,000 towers were set up and in 2007, the number doubled to 100,000. In fiscal 2009, as market leaders such as Bharti Airtel Ltd and Reliance Communications Ltd (RCom), vie for new customers, their network expansions are leading them to Indias small towns and villages. Already for Bharti Airtel, Indias No. 1 mobile phone services firm, one in three new customers is from what it calls rural areas.We are adding almost 3,000 towers every month, said Manoj Kohli, joint managing director of Bharti Airtel, recently. That is, 100 a day. Most of these towers, as also most among the more than 60,000 towers that Indian phone firms and tower firms such as GTL Infrastructure Ltd and ETIPL will set up this financial year, are going to be in rural places. With around 150,000 telecom towers currently standing in the country, and another 200,000 to be added over the next three-four years, the demand for ancillaries that go with each tower, which include gensets for back-up electric supply, air conditioners and equipment for tower shelter, is seeing significant growth. For instance, GTL, which plans to have almost 25,000 towers by 2011, up from around 4,000 currently, says it will invest 70% of the planned $2 billion (around Rs8,300 crorse) capital outlay in procuring ancillary products such as portable generators and air conditioners. We already have around 2,800 generators, and by April this year, we plan to procure another 2,100, Prakash Ranjalkar, chief operating officer (COO) of GTL, had said in a February interview. DOT Committee on Renewable Energy 2008

1.1 Telecommunications has been recognized as one of the prime support services needed for rapid growth various However, and modernization of of

sectors in

economy. a wider

achieving

spread of such initiatives in rural India the dismal state of rural

electrification is a major challenge. There are villages where the grid has not even reached, and even electrified villages do not receive reliable and quality supply. poor power quality The

substantially

increases the capex and opex of telecom installations and also leads to unsatisfactory quality of services.

1.2 The problem of poor electricity supply is experienced at the telecom service providers installations as

well as at the customers premises. At the telecom installations, the problem is tackled by using diesel generators. These generators,

however, entail transportation and storage of diesel which is a major problem in rural/remote area,

7|Page besides the problem of noise pollution emanating from the

generators. At customers premises the electricity supply problem is partially mitigated by using battery inverters or dc-dc converters. The battery however remains only partially charged if the electric supply is too unreliable. 1.3 Decentralised distributed generation technologies based on renewable energy resources such as solar photo voltaic (SPV)/ Wind Turbine Generators (WTG) address the above barriers to a large extent and are therefore considered as emerging alternate power solutions to power telecommunications net-works.

2.

Non-Conventional Energy:

2.1 Solar Energy 2.1.1 In India the annual global solar radiation is about 5 KWh/ sq m per day with about 2300-3200 sun-shine hours per year. Solar radiations represent the earths most abundant energy source. The perennial source of solar energy provides unlimited supply, has no negative impact on the environment. The solar photovoltaic (PV) modules convert solar radiation from the sun into electrical energy in the form of direct current (DC). Converting solar energy into electricity is the answer to the mounting power problems in the rural areas. Its suitability for decentralized applications and its nature make it an attractive option to

environment-friendly

supplement the energy supply from other sources. 1 KWp of SPV generates 3.5-4.5 units (KWhr) per day.

2.1.2 If we could install Solar Photovoltaic Cells much of the rural exchange power needs could be met, adequately cutting down harmful greenhouse gases.

DOT Committee on Renewable Energy 2008

8|Page

2.2 Wind Energy

Wind energy is another viable option.

The Wind Turbine

Generator is designed for optimal operation at wind speed of 10-14 m/s. The Turbine Generator starts at a cut-in speed of 3-3.5 m/s and generates power at speeds 4.5 m/s and above. In India the best wind speed is available during monsoon from May to September and low wind speed during November to March. The annual national average wind speed considered is 5-6 m/s. Wherever average wind speed of 4.5 m/s. and above is available it is also an attractive option to supplement the energy supply. Wind generators can even be installed on telecom tower at a height of 15-20 mt. with suitable modification in tower design, taking into account tower strength and EMI & EMC. 1 KW WTG generates around 3 units (KWhr) per day.

2.3 Solar-Wind Hybrid Power System 2.3.1 Hybrid Wind-Solar System for the rural exchanges can make an ideal alternative in areas where wind velocity of 5-6 m/s is available. Solar-wind power generations are clear and non-polluting. Also they complement each other. During the period of bright sunlight the solar energy is utilized for charging the batteries, creating enough energy reserve to be drawn during night, while the wind turbine produce most of the energy during monsoon when solarpower generation is minimum. Thus the hybrid combination uses

the best of both means and can provide quality, stable power supply for sustainable development in rural areas.

DOT Committee on Renewable Energy 2008

9|Page 2.3.2 These systems are specifically designed to draw 48 volts DC power output from the solar cells/ wind turbines and combine them to charge the storage batteries. The system does require availability of diesel generator, though for much reduced number of hours operation. It is also designed to give priority to solar and wind power so that operations of generators can be minimized to the extent possible.

3. Advantages of Renewable Energy Systems

Provides un-interrupted power supply to the equipment

Provide

clean,

green,

reliable,

pollution

free,

low

emission and distributed technology power

Saves

from

high-running

cost

of

generator

and

increasing diesel cost

The system gives quality power out-put of 48 volt DC to charge directly the storage battery or provide direct power to telecom installations.

The system can be designed for both off-grid and ongrid applications.

Efficient and easy installation, longer life

Low gestation period

Low operating cost

DOT Committee on Renewable Energy 2008

10 | P a g e 4. Appropriate geographical region: 4.1 Solar: In India the annual average solar radiation of 5 KW h/sq m per day with about 2300-3200 sunshine hours per year is available in most parts of the country except some pockets in north-east. As such solar power (SPV) decentralized system can be considered for the telecommunication network in rural areas in most parts of the country. (Annexure-1)

4.2 Wind: 4.2.1 The southern and western coastal areas are the ideal location for wind generators. For the telecommunication network in rural areas in states like Tamil Nadu, Karnataka, Gujarat, Maharashtra and parts of Orissa, Andhra Pradesh, Madhya Pradesh where the annual average wind speed of 5-6 m/s is available, installation of hybrid solar-wind power system can be an attractive option to supplement the energy supply. (Annex - 2)

DOT Committee on Renewable Energy 2008

11 | P a g e

5. Typical Power requirement for a BTS

5.1. The BTS that are being installed under USFO support will initially have 2+2+2 configuration with a provision to add extra TRX at a later date. Typical average power consumption as indicated by the manufacturers is as under:

Sr. No.

Type of BTS (Configuration) 2+2+2 4+4+4 6+6+6

1. 2. 3.

Typical average Consumption 1.3 KW 2.0 KW 3.5 KW

5.2. Government is giving subsidies for the rural telephony from the USO Fund to support both passive (Land, tower, power back up) and active (BTS, Antenna) infrastructure. The Committee

visited few shared BTS USO sites phase I in order to assess the power requirement and arrangement of sharing of power.

Observations of site visits:

o o

Land size = 400 sq m Each of the service provider given three phase AC supply but are using only single phase supply with single phase SMPS.

o o o

Battery provided 2x200 AH or 1x430 AH Unbalanced load in three phases The total DC power drawn for the 3 service providers at a shared BTS site is 2.02 KW. [CDMA (Reliance) 18 A (0.92 KW), GSM (Idea) 9.1 A (0.5 KW) and GSM

DOT Committee on Renewable Energy 2008

12 | P a g e (Voda phone) 12.8 A (0.6 KW)]. Details as at Annexure - 3 o The Engine is operating at 10% load for 24x7 days where grid supply is not available

6. System specifications/design: 6.1 At present the service providers at a shared BTS site use a

common grid connection and DG set provided by the infrastructure provider. The power plant and batteries are individually installed by the service providers. (Annexure-5). The use of renewable energy systems i.e. SPV and WTG can be efficiently utilized, if they are also provided centrally like the DG set. This will reduce the overall

system cost and requirement of the BTS site area. The renewable energy power system proposed assumes centralized arrangement for power plant and batteries.

6.2

For powering three BTS at one location, a single solar power

(SPV) system would be much more economical as compared to three separate systems. The system has been designed considering the power requirement of 2 KW at present and 6 KW in near future for a shared rural BTS sites (3 service providers) with 1+1 day autonomy (Annexure 4 & 8). The requirement of solar power (SPV) is as given under :-

Switch load

2 KW 3 KW 4 KW 6 KW

DC Solar panel (SPV) Solar panel for Stand alone (SPV) with 2-7 system hrs. DG set operation 17 KWp 8.5 KWp 25 KWp 34 KWp 50 KWp 12 KWp 17 KWp 25 KWp

DOT Committee on Renewable Energy 2008

13 | P a g e 6.3 The space requirement of Solar PV is 12-13 sq m/ KWp. The space requirement for accommodating 17 KWp SPV and 25 KWp SPV is approximately 220 sq mt & 320 sq mt respectively. For 2 KW load 17 KWp SPV will work as a stand alone system with no DG operation required. For 4 KW load, the same 17 KWp solar system will work in hybrid combination with DG set, 4 hrs. operation in a day. For 6 KW load, the solar panel needs to be augmented to 25 KWp to work in hybrid combination with DG set, 7 hrs. operation in a day.

DOT Committee on Renewable Energy 2008

14 | P a g e

6.4 For the rural areas, the following Solar & solar-generator/wind hybrid non-conventional energy options have been considered:-

SPV

WTG

Battery

DG Operation

CAPEX (Rs.Lakhs)

Option I [Solar-Generator Hybrid system] 17 KW 2500 AH For 2KW load: No DG operation* For 4KW load: 4 hours/ day (20/15 KVA) For 6KW load: 7 hours/ day (20 KVA) Option II [Solar-Wind-Generator Hybrid system] 13 KW 4-5 KW 2500 AH For 2KW load: No DG operation* For 4KW load: 4 hours/ day (20/15 KVA) For 6KW load: 7 hours/ day (20 KVA) Option III [Solar-Wind-Generator Hybrid system] 17 KW 2x 4-5 KW 2500 AH For 6KW load: 5 hours/ day (20 KVA) 51 37 45

* No DG operation means that the DG shall be used once in 2-3 weeks for topping up the
battery charge only.

6.5 These systems are specifically designed to draw 48 volt DC power output from the solar cells / wind turbines and combine them to charge the storage battery in tandem or provide direct power to the telecom equipment. Wherever grid supply is not available, 2-7

hours DG set operation per day is considered to maintain healthy battery condition and reduction in SPV/WTG system capacity. However, in case of no Sun/wind days, DG set may have to operate for longer hours.

DOT Committee on Renewable Energy 2008

15 | P a g e 6.6 The system design / specification for solar (SPV) system and hybrid solar-wind is at Annexure 4 &5 respectively.

7. Shared BTS rural sites 7.1 In a typical USOF Phase-I shared rural BTS site of 20 x 20 mtr, having a tower, 15 KVA DG set & 3 BTS shelters only 160 sq mtr clear space is available (layout at Annexure-11). The electric load of a shared BTS site at present is 2 KW and is likely to increase ultimately to 6 KW for which, the 17 /25 KWp SPV required can not be accommodated. For the USOF Phase-I sites where only 160 sq mtr space is available, only 10 KWp SPV can be accommodated. Considering the space constraints in the USOF Phase-I sites in rural areas, the following Solar & solar-generator/wind hybrid nonconventional energy options have been considered:-

SPV

WTG

Battery

DG Operation

CAPEX(Rs.Lakhs)

Option I [Solar-Generator Hybrid system] 10 KW 2500 AH For 2KW load: 2 hours/ day (20/15 KVA) For 4KW load: 6 hours/ day (20/15 KVA) For 6KW load: 9 hours/ day (20 KVA) Option II [Solar-Wind-Generator Hybrid system] 10 KW 4-5 KW 2500 AH For 2KW load: 1 hour/ day (20/15 KVA) For 4KW load: 5 hours/ day (20/15 KVA) For 6KW load: 8 hours/ day (20 KVA) 29 26

DOT Committee on Renewable Energy 2008

16 | P a g e 7.2 In future USOF shared rural BTS sites, if the plot area is

increased to 20x25 mtr , 17 KWp SPV can be accommodated so that DG operation can be reduced by 4 hrs daily.

8. System overview: 8.1 System configuration

The proposed system uses centralized power plant, battery bank, SPV and WTG (where feasible). All these are centrally controlled by a Charge Control Unit(CCU) for optimal powering of systems and charging of the battery bank. The CCU ensures smooth operation of the overall powering arrangement without any manual intervention. Its design will ensure optimal energy transfer from the SPV system using MPPT (Maximum Power Point Tracking) technique and

automatic switching on/off of DG set on the basis of battery charge condition. The schematic for this system is placed at Annexure-6.

8.2 Battery

The battery bank has been sized to ensure full utilization of the renewable energy power generated at the site. As mentioned earlier, the charging of the battery will take place by automatic control of DG set operation so as to ensure that the battery is not unduly discharged.

The poor availability of grid power in the rural areas leaves the battery bank in partial state of charge. This reduces the life of battery considerably. One option to circumvent this problem is to use flooded batteries. However maintenance and space

requirements of such batteries prohibit their use. Another option is to use Tubular GEL VRLA batteries as they provide better

performance under the partial state of charge.


DOT Committee on Renewable Energy 2008

17 | P a g e

Additional advantages of Tubular GEL VRLA battery over VRLA AGM (flat plate): Better thermal management because of more electrolyte Cyclic life is 30% to 40% higher than AGM batteries. (2100 cycles in Tubular GEL as compared to 1400 cycles in AGM) Self discharge is lower than AGM batteries and can be stored upto one year against 6 months as in AGM Better performance at high temperature Slow rate of discharge performance suits rural applications.

Therefore Tubular GEL VRLA batteries are recommended for this application.

9. Operational Difficulties: 9.1 There is no operational difficulty as such in a solar (SPV) system and hybrid solar wind system. Only the solar panels need to be

cleaned with water at regular intervals. In case of a Wind Turbine Generator, the power generation depends on the wind velocity. Thus restricted to locations where the annual average wind velocity is 4.5 m/s or higher. For the wind mills annual preventive maintenance is required for optimal efficiency.

DOT Committee on Renewable Energy 2008

18 | P a g e

9.2 Charge control unit (CCU) The system is centrally controlled by Charge control unit (CCU) in which requires no manual intervention. Typical pictorial representation is as under:

Master Controller Output Power

Solar PV

Remote Monitoring thru internet Wind Turbine

Diesel Generator

Battery

DOT Committee on Renewable Energy 2008

19 | P a g e

10. Cost effectiveness: 10.1 The CAPEX of the solar / hybrid solar-wind systems ranging from 10KW to 17KW comes to around 26-51 lakhs after considering the 80 percent accelerated depreciation benefit given by the Government of India(owing to which there will be reduction of about 25% in capital cost).

10.2 The generator usage varies with the load as discussed in the preceding paragraphs. 10.3 The proposed solar/hybrid solar-wind systems give 48 volt DC power output to charge the storage battery and provide direct DC power to the telecom equipment. Hence the individual SMPS,

battery charger, battery banks provided by the service providers at present under active infrastructure component in USOF schemes are not required. Apart from that there will be cost savings on account of nil/lesser hours of DG Set operation.

10.4 The cost comparison on running the equipment entirely on DG set 24x7 for 365 days (case of an off grid site) and the different combinations of solar/wind-solar system with various loads is placed at Annex.-10. The systems are cost effective from first year itself/within the initial few years.

10.5 Considering the annual saving of fuel, the pay back period for various systems ranges from around 4-9 years (Annex.- 10) depending upon the capacity of the SPV/hybrid installation and the load.

10.6 Given the heavy initial CAPEX and long pay back periods there is therefore a case for subsidy support.
DOT Committee on Renewable Energy 2008

20 | P a g e

11. TRAI Recommendations

Telecom Regulatory Authority India in its recommendations on infrastructure sharing para 5.3.3.1 recommended as under:-

(i)

Department of Non-Conventional Energy Resources may be approached by DoT to evolve a pro-active policy framework to encourage use of environment friendly non-conventional

energy sources. Some of the specific measures in this regard are given below:-

a)

To device a policy to promote the use of solar power and alternative fuel specifically for Telecom sector.

b)

To provide Telecom specific Advisories on available equipments, costs, sources for procurement etc. to service providers.

c)

To

maximize

subsidies

for

Telecom

operators

considering potential of high use of such devices in telecom sector.

d)

To

examine

possibilities

of

use

of

other

non-

conventional environment friendly energy sources.

ii)

DOT may evolve a scheme of subsidy per site to service providers and incentives for using non-conventional energy sources.

DOT Committee on Renewable Energy 2008

21 | P a g e

12. Implementation strategy for renewable energy system in shared mobile infrastructure sites.

12.1 The USOF has taken few initiatives in the past regarding introduction of renewable energy. The details of such initiatives, rulings etc as provided by Jt. Administrator(F), USOF, are placed at Annexure-7.

12.2

The committee has been apprised that IPs and USPs have

been repeatedly approaching USOF and MNRE for subsidy support for installation of renewable energy systems to power telecom sites in rural and remote parts of the country.

12.3

USOF support for use of renewable energy can be given in

two possible ways:

12.3.1 Pilot Projects: The committee recommends that a few USOF Phase-I sites may be selected to demonstrate and evaluate the efficacy and cost effectiveness of various renewable energy options. Appropriate combinations of solar and wind energy

equipment would be installed at suitable sites as per approved specifications. The funding mechanism may be finalized by

incorporating cost sharing by MNRE, USOF, and TSP. 12.3.2 The committee notes that BSNL is the IP in bulk of the USOF phase-I sites (78%), therefore its sites would offer the required diversity of geographical locations. The committee recommends

that BSNL sites may be selected for carrying out the pilot projects. The geographical location of the site may be so chosen as to ensure proper utilization of SPV & WTG systems. The pilot projects shall be
DOT Committee on Renewable Energy 2008

22 | P a g e jointly monitored by TEC, Electrical wing of DOT, USOF, and MNRE. The data from the pilots would help in fine-tuning technical specifications leading to development of Generic Requirements (GR) by TEC, and working out subsidy model for hybrid power solutions for telecom installations.

12.3.3 Shared Mobile Infrastructure Sites: USOF may evolve a separate subsidy component for various hybrid energy solutions in sites coming up in future mobile infrastructure schemes. Given the fact that about 11000 odd shared mobile sites are slated to come up in villages that are even more remote and small as compared to the location of USOFs Mobile Infrastructure Phase I sites, it may be prudent to presume that the availability of power would be an even greater constraint for these new sites. It is envisaged that the subsidy would be offered as an incentive to use renewable energy instead of a second DG set in an off grid site or even to cut down on hours of operation of the DG set. It is expected that this would make the USOF sites less dependant on the relatively costly and polluting option of using diesel in locations where grid power supply in unavailable/erratic/insufficient.

12.3.4 A system may be considered whereby in Phase II, the IPs and USPs concerned would make a joint decision within few months of signing of the agreement (coinciding with site finalization) as to whether or not to opt for renewable energy usage for a particular site and which hybrid model they wish to install. Upon exercising this option, they would then be eligible for an additional subsidy based on the particular hybrid model they choose. The detailed subsidy model and calculations would be worked out by USOF, taking into consideration capital recovery as well as savings on account of fuel and re-locatable infrastructural components (for Part
DOT Committee on Renewable Energy 2008

23 | P a g e B TSPs). It is suggested that subsidy be disbursed only upon successful commissioning of the system and after due verification. Apart from saving the operators the huge cost of supply and consumption of diesel in remote locations, switching to renewable energy would provide for sustained rural telecom services to target beneficiaries in a cost effective manner while also cutting down on harmful carbon emissions.

12.3.5 The above mentioned USOF support for use of renewable energy by way of pilot projects and future USOF mobile

infrastructure sites, would serve to encourage greater utilization of solar-wind hybrids and demonstrate their cost effectiveness in the long run. It is felt that these initiatives under the aegis of DOT

through USOF, carried out in coordination with MNRE, would have a significant impact on the rural telecom scenario and the use of clean energy in telecommunications would receive a much needed fillip.

DOT Committee on Renewable Energy 2008

24 | P a g e

13. Recommendations:

I.

The

non-conventional

energy-solar

/solar-wind

hybrid

power system is found to be technically feasible and cost effective in long run. Its environment-friendly nature

make it an attractive option to supplement the energy supply in rural areas. DOT to make a policy to promote the use of environment-friendly solar / solar-wind hybrid non-conventional energy power system for telecom network in rural and remote areas.

II.

The present arrangement of individual installation of power plant and battery by service providers will have to be changed to centralized DC power arrangement by the infrastructure provider to ensure optimal use of the BTS site area for installation of SPV and WTG systems. Further, augmentation of the BTS plot size from the present 400 sq mtr to 500 sq mtr may be considered for facilitation of SPV system of 17 KWp which will result in reduction of DG set operation, atleast by 4 hrs daily.

III.

To prove the technical and financial viabilities for solar / solar-wind hybrid renewable energy systems for rural and remote telecom sites, DOT should fund, through USOF, pilot projects in USOF shared infrastructure sites. The projects shall be undertaken in coordination with MNRE who would provide technical and financial support as well. a) 1 project of Solar (SPV) power system in each state except north-east region. b) 2 projects of solar-wind hybrid system in 4 states Maharashtra, Tamil Nadu, Gujarat, Karnataka and 1
DOT Committee on Renewable Energy 2008

25 | P a g e each in Orissa, Andhra Pradesh and Madhya Pradesh where the annual average wind speed is 5-6 m/s or higher.

IV.

The initial capital cost being high, there is a hesitation to go in for renewable energy power option. DOT to

encourage the telecom service providers by giving separate subsidies / incentives for using non-

conventional energy sources in rural and remote areas. The service providers can have the additional benefit of carbon credit as well.

V.

To

further

encourage

the

wide

spread

adoption

of

renewable energy in telecom installations in rural and remote areas, appropriate subsidy scheme should be made available to all telecom operators going in for renewable energy installations in USOFs future

mobile infrastructure schemes.

Unit Chief (C-WET) MNRE, Chennai

DDG (SAT) TEC

Jt. Admntr. (Fin) DOT

Sr. DDG (BW) DOT

DOT Committee on Renewable Energy 2008

26 | P a g e ANNEXURE 1

Solar Insolation diagram of India

DOT Committee on Renewable Energy 2008

27 | P a g e ANNEXURE 2 Wind Map Of India

DOT Committee on Renewable Energy 2008

28 | P a g e ANNEXURE 3 Equipment load measured at various sites


USO Site Phase-I (Kerala) Shared BTS - Vasod Reliance Phone Type of Equipment CDMA GSM GSM Idea Voda

Grid Supply (KW)

Available R 0.78 Y 1.33 B 0.12 R 0.61 Y 0.62 B 0.00 1.23

Available R 0.64 Y 0.00 B 0.16 0.8

Available R .12 Y 0.5 B 0.0 0.62

Total (KW) Engine Capacity

2.23 20 KVA

R Y B Total Battery Amp

R Y B

R Y B

R Y B

2x200 Amp (1 ph)

430 Amp (1 ph) 2x50 Amp

420 (1 ph) 2x40 Amp

SMPS

2x60 Amp

DC Out Put Total (KVA) 2.02 Land Size Remarks: 1. 2. 3. 4. 5.

(18Ax48V) 0.92 20x20 mt.

9.1Ax48V 0.5

12.8Ax48V 0.6

Unbalanced load in 3 phases Single battery in GSM equipment GSM Energy efficient AC-DC conversion efficiency low Engine shall operate at 10% load. Efficiency (25-30%)

DOT Committee on Renewable Energy 2008

29 | P a g e
USO Site Phase-I (Kerala) Shared BTS - Nalumuku

Type of Equipment Grid Supply R Y B Total

Reliance CDMA Not Available R Y B

Idea GSM Not Available R Y B

Vodafone GSM Not Available R Y B

Engine Capacity R 1.5 KW Y 0.2 KW B 0.6 KW Total (KW) 2.3

20 KVA R 2.5 Amp Y B 1 R 1.5 Amp Y B 0.06 A 0.6 R1.5Amp Y B 0.07 A 0.6

Battery SMPS

2x200 Amp 2x60 Amp (1 ph) (19Ax48V) 0.91 1 20x20 mt

430 Amp 2x50 Amp (1 ph) 9.4Ax48V (0.45) 0.5

420 Amp 2x40 Amp (1 ph) 10Ax48V (0.48) 0.5

DC Out Put Total (KVA): 2 Land size : Remarks:

1. Unbalanced load on generator 2. Engine operating at 10% load. Efficiency 25-30%

DOT Committee on Renewable Energy 2008

30 | P a g e
USO Site Phase-I ( Karnataka) Shared BTS - Hunsenahawli

Reliance Type of Equipment Grid Supply R Y B KW CDMA Not Available R Y B

Voda phone GSM Not Available R Y B

BSNL GSM Not Available R Y B

Total

Engine Capacity

20 KVA (Working) R Y B R Y B R Y B

R 9A Y 0 B 0 Total (KW) 2.07 Battery

2x200 AH (48 V)

1x430 AH (48 V) Single 2x60 A (1 ph)

2x400 AH (48 V) Single 2x50 A (3 ph) Using single ph

SMPS

3x50 A (1 ph)

DC Out Put Total (KVA): Land Size : Remarks: 25x16 mt.

12.4 Ax48 V 0.6

1. Unbalanced load on generator 2. Engine operating at 10% load. Efficiency 25-30% 3. BSNL installed 3 ph SMPS using single ph.

DOT Committee on Renewable Energy 2008

31 | P a g e
BTS Site Soldha (Bahadurgarh, Haryana)

Type of equipment

GSM (Voda Phone) 3+3+3 72 lines (1TRX 8 lines)

Grid Supply

Single phase (30 Units per day) = 30 KWH or 1.2 KW

Generator

15 KVA Single phase (not operated during the year)

Solar

1.5 KW (12.5 sq. mt.)

Battery

2x300 AH

DC load

25A x 48V = 1.2 KVA

DOT Committee on Renewable Energy 2008

32 | P a g e ANNEXURE 4 Rating Calculations

SPV calculations- BTS Sites


I. Load Power Watt Quantity No. Total Power Watt Duration Hour Energy WattHour 48000 22 1200 960 50182 Amp. Hr (48 Volt) 1000.00 0.46 25.00 20.00 1045

1 2 3 4

Exchange equipment CFL Aviation light Compound light

2000 11 100 40

1 1 1 2

2000 11 100 80 2191

24 2 12 12

One module :12 v so a string of 4 modules required to produce 48 v A 125 Wp module can generate 40AH (8A x 5Hrs) of energy Battery requirement= AH/.85x.95x.95 = (85%battery efficiency, 95% CCU, 5% dust etc) Total no. of strings of 125 Wp modules required Total Capacity of SPV = 34x4x125W = Battery reqd (Considering 1+1 days autonomy) 1363 AH

34 17000 W 2500 AH

i.e 17 KW

II.

Load

Power Watt

Quantity No.

Total Power Watt

Duration Hour

Energy WattHour 72000 22 1200 960 74182 Amp. Hr (48 Volt) 1500.00 0.46 25.00 20.00 1545

1 2 3 4

Exchange equipment CFL Aviation light Compound light

3000 11 100 40

1 1 1 2

3000 11 100 80 3191

24 2 12 12

Battery requirement= AH/.85x.95x.95 = (85%battery efficiency, 95% CCU, 5% dust etc) Total no. of strings of 125 Wp modules required Total Capacity of SPV = 50x4x125W = Battery reqd (Considering 1+1 days autonomy)

2015 AH

50 25000 W 4000 AH

DOT Committee on Renewable Energy 2008

33 | P a g e
III. Load Power Watt Quantity No. Total Power Watt Duration Hour Energy WattHour 96000 22 1200 960 98182 Amp. Hr (48 Volt) 2000.00 0.46 25.00 20.00 2045

1 2 3 4

Exchange equipment CFL Aviation light Compound light

4000 11 100 40

1 1 1 2

4000 11 100 80 4191

24 2 12 12

Battery requirement= AH/.85x.95x.95 = (85%battery efficiency, 95% CCU, 5% dust etc) Total no. of strings of 125 Wp modules required Total Capacity of SPV = 67x4x125W = Battery reqd (Considering 1+1 days autonomy)

2666 AH

67 33500 W 5000 AH

i.e 34 KW

IV.

Load

Power Watt

Quantity No.

Total Power Watt

Duration Hour

Energy WattHour 144000 22 1200 960 146182 Amp. Hr (48 Volt) 3000.00 0.46 25.00 20.00 3045

1 2 3 4

Exchange equipment CFL Aviation light Compound light

6000 11 100 40

1 1 1 2

6000 11 100 80 6191

24 2 12 12

Battery requirement= AH/.85x.95x.95 = (85%battery efficiency, 95% CCU, 5% dust etc) Total no. of strings of 125 Wp modules required Total Capacity of SPV = 99x4x125W = Battery reqd (Considering 1+1 days autonomy)

3970 AH

99 49500 W 8000 AH

i.e 50 KW

The above ratings are calculated for stand alone system i.e for sites where there is no grid supply and solar system is working alone However capacity of SPV can be reduced to half if DG set is operated for about 2-7 hrs a day other components shall remain the same

DOT Committee on Renewable Energy 2008

34 | P a g e

ANNEXURE 5

Single Line Diagram of Existing System

Service Provider 1
48 V DC bus

Grid

3-

LT panelSurge arrestors

SMPS

BTS equipment Battery bank

Service Provider 2

Gen
48 V DC bus 20 KVA, 3- LT panelSurge arrestors SMPS BTS equipment Battery bank

Service Provider 3
48 V DC bus LT panelSurge arrestors SMPS BTS equipment Battery bank

DOT Committee on Renewable Energy 2008

35 | P a g e

ANNEXURE 6

Technical Specifications
Introduction This document specifies the technical requirements for powering arrangement for shared BTS sites in rural areas of the country. It is envisaged to employ renewable energy sources i.e. Solar Power and Wind Power in the powering scheme, depending upon the availability of power source. In effect, the powering system shall comprise of solar power, wind power (where feasible), grid supply, and diesel generators of suitable capacities. A typical schematic for the powering arrangement is shown in the fig. 1 below:

48 V DC

Grid

3-

Automatic Phase selector

DC bus

Service Provider 1 Service Provider 2 Service Provider 3

Gen
15 KVA, 1-

Rectifier* SPV

CCU

Battery bank

SPV charge controller WTG charge controller

WTG

* Rectifier can be outside CCU module Fig. - Schematic for powering arrangement at shared rural BTS sites.
DOT Committee on Renewable Energy 2008

36 | P a g e

The detailed specifications for each building block of this scheme is as under:
Detailed Technical Specifications 1. Solar Photo Voltaic (SPV) Module 1.1 Solar Photo Voltaic (SPV) module array to be of high efficiency made of crystalline silicon solar PV cells. The cells are hermetically sealed under toughened high transmission glass to produce highly reliable weather resistant modules. Power output guarantee offered for the SPV module shall not be for less than 15 years in any of the climatic condition prevailing in India. For minimum stipulated life, the derating factor of 0.5% per year of SPV system/module rated power is permissible. The SPV module/system shall deliver at least 92.5% of its rated power in 15th year also. Individual Solar module rating shall not be less than 125 Wp at STC (Higher ratings can be used) and shall meet following minimum requirement : Efficiency of cell c 14%

1.2

1.3

Efficiency of module m 13% Fill factor shall be better than 70%. 1.4 The SPV modules shall be soaked for at least for a week in natural sunlight before offering for tests or supply in accordance with the Instructions issued by the ministry of Non-Conventional Energy Sources to Test Centres vide letter No. 29(2)/Testing-97/PVTF dated 13.12.98. A sample check of 1% of the total modules offered will be carried out by QA wing of the respective Telecom operator. In addition to the requirement of above, the SPV satisfy the following environmental test conditions: modules shall also

S. No. i. ii. iii. iv.

Tests Dry heat Cold Rapid Change of Temperature Composite Temperature Humidity Cyclic Test

Test Condition +85 C 16 hours -40 C 16 hours -40 C to 80 C 10 cycles IEC-68-2-38 25 C to -10 C 25 C to 65 C 95% RH 10 cycles Reference/Specification IEC-68-2-2 Test Bb IEC-68-2-1 Test Ab IEC-68-2-14

DOT Committee on Renewable Energy 2008

37 | P a g e
v. vi. vii. viii. Rain Heavy dust/sand storm Wind speed Hail Storm 2 Hours IS 9000 (PART 16) Clause 16.0 of QM- 333

ix.

Bending & twisting

x. xi. xii. xiii. xiv.

Insulation test for module Hot-spot endurance test Robustness of termination test Wet leakage current test Bypass diode thermal test

200Kms/hour Hails of 25mm dia size at 23m/Sec velocity shall not cause physical damage to any part of the solar array or associated structures. module shall withstand a displacement at one corner by 20 mm/metre measured along with the shortest edge without open or short circuit within the module or suffer low resistance between terminals to frame. As per IEC : 61215 IEC : 61215 As per IEC : 61215 As per IEC : 61215 As per IEC : 61215 As per IEC : 61215 IEC : 61215 IEC : 61215 IEC : 61215 IEC : 61215

1.5

Insolation- Main insolation at any panel kept at optimum tilt at place where the solar panel is to be used shall be 4.5 Kw hour per m2 per day. I-V curve peak (maximum) power output: The SPV module shall deliver minimum 12.5 watt at maximum power point of I-V curve at standard condition of 100 mw/cm2 solar intensity at 25 degree C. I-V curve of each PV module with Sl. Nos. shall be submitted along with following details:

1.6

Maximum Power, Pmax Open Circuit Voltage, Voc Short Circuit Current, Isc Voltage at maximum power, Vmp Current at maximum power, Imp Efficiency of cell c

Efficiency of module m
DOT Committee on Renewable Energy 2008

38 | P a g e

1.7

Solar PV module shall conform to following mechanical requirement Toughened high transitivity front glass Anodized Aluminum frame Ethyl Vinyl Acetate (EVA) encapsulated Tedlar/Polyester trilaminate back surface ABS plastic terminal box for the module output termination with gasket to prevent moisture Resistant to water, abrasion, hail impact, humidity & other environmental effects for worst situation at site. Solar PV module shall have proven performance track record in Indian Climatic conditions Permissible cell area per watt is between 60 cm2 and 100 cm2. All the cells in the module shall be identical of regular shape. Considering the application and geographical location of India, the number of cells in the series in a module shall be 36. Short circuit current shall not be more than 110 percent of Imp. Voltage at peak power point: 17.0 V (min). Voltage derating not more than 0.5% per degree C above 25 degree C cell temperature. The SPV modules being used for Telecom supply, need to be characterized at NPL (National Physical Laboratory) or any other recognised test laboratory for each type of cells used and manufacturer will give the spread in of silicon cells which are used.

1.8

Module Mounting Structure

1.8.1 Structure shall be designed for simple mechanical and electrical installation on roof top or On the ground at an angle of tilt with horizontal, in accordance with the latitude of the place of installation. 1.8.2 1.8.3 1.8.4 It shall support SPV modules at given orientation, absorb and transfer the mechanical loads to the ground properly. The structure shall be hot dip Galvanized & shall have anti corrosive paint. The steel for the mounting structure shall be as per IS 2062: 1992 and mounting structure galvanisation shall be in compliance of IS 4759 (latest issue). The mounting arrangement shall be suitable for column mounting or flat surface, as desired by the ordering authority. The Mounting structure shall be easily transportable and designed to withstand the wind speed of 200KM/hour. Design calculation shall be furnished to show that the proposed structure will withstand the wind speed of
DOT Committee on Renewable Energy 2008

1.8.5 1.8.6

39 | P a g e
200 Km/hr. The design for the mounting structure shall have the certification from a recognised Lab/Institution for the purpose. 1.8.7 1.8.8 Provision for directional and angular adjustment shall be made to ensure the optimum utilisation of incident sunlight. The design/drawings of the mounting structure shall be supplied along with the module to the purchaser. The mounting structure shall be suitably designed to withstand the weight of the panel/array.

1.8.9

1.8.10 The exact mounting mechanism shall have to be decided upon and specified by the ordering authority, as per the actual requirement at the site of installation, and the same shall be mentioned in the purchase order. 1.8.11 The array structure shall be so designed that it will occupy minimum space without sacrificing the output of SPV panels. 1.8.12 Structure shall have suitable anti theft measures to prevent easy removal of Solar Modules. 1.9 Array Junction Box

1.9.1 The junction box shall be dust, vermin & Water proof and made of FRP/Thermoplastic with IP65 protection. 1.9.2 The terminals shall be connected to copper bus bar arrangement of proper sizes 1.9.3 The junction box shall have suitable cable entry points fitted with cable glands of appropriate sizes for both incoming and outgoing cables. 1.9.4 Suitable markings shall be provided on the bus bar for easy identification and cable ferrules shall befitted at the cable termination points for identification. 1.9.5 The rating of junction box shall be suitable with adequate safety factor to interconnect solar PV array 1.9.6 Metal oxide arrestors shall be provided inside the array junction boxes.

2. Battery Bank : 2.1 The battery shall be 48V (24 cell)) VRLA type (deep-cyclic), suitable for SPV application i.e. slow rate of charge and discharge conforming preferably to GR/BAT-03/01 MAR 2006 Tubular VRLA batteries based on GEL technology with amendment if any or TEC GR No. GR/BAT-01/03 MAR 2004 with amendments if any for VRLA flat plate technology. The capacity of the battery shall be so designed so as to supply the ultimate load during the non-sunlight hours i.e. during the night and also during the cloudy weather (Number of sunless days at a stretch as specified by the ordering authority) or when both SPV power and AC mains are not available (and also wind power wherever asked for) with
DOT Committee on Renewable Energy 2008

2.2

40 | P a g e
80% reserved power in fully charged condition and shall be floated across the SPV panel or SMPS and load through charge controller. 2.3 The nominal voltage of the Battery shall be 48V. However, the actual capacity of the battery in terms of Ampere-hour shall be indicated by the ordering authority. The battery shall deliver at 120% of its rated capacity at low rate of discharge between C/20 and C/120. At discharge rate of C/120 or slower, the battery shall deliver at least 150% of its rated capacity.

2.4

3. Charge controller unit : Charge controller unit shall manage power supply employing grid, SPV, Wind Power, and diesel generator power. It shall provide for the necessary DC power supply to the load and battery and also protect battery bank from over charge, deep discharge, reverse polarity and short circuit, thereby ensuring that the electrical characteristics are met for optimum performance and reliability. It monitors all the functions of SPV power source and SMPS (some on charge controller along with SMPS and all other on the SMPS). It provides for termination for output of the SPV array, output of wind power, output of the SMPS (through a switch), load and battery. It shall house all the necessary alarms, monitoring and control circuits. It shall also provide for the mounting of the lightning and surge protection devices (SPV side on the charge controller itself, while SMPS side lightning and surge protective devices on the SMPS. 3.1 3.1.1 Charge Control Unit/Control Electronics: The Control system should automatically manage the system operation which include: Integrated solar, grid, wind, and diesel generator charge regulator. In case of availability of Solar/ wind Power, priority shall be given to renewable power over grid/DG. With mains being available (Grid Connected System), controller shall decide whether grid is to be utilized depending on State of Charge of the Battery Bank and availability of Solar/wind Power. The system shall intelligently do generator exercising at a pre decided interval to prevent seizing up Controller shall have Advance battery management with PWM regulation to keep the battery bank fully charged without over charging / Deep discharging it Controller shall have intelligent decision making for regulating the Battery Charging process (Boost, Float, Absorption, Equalization)

3.1.2

Battery charging & battery management

3.1.3

Self consumption: Solar regulator shall be microcontroller based with low energy consumption. The regulator supply current shall not be more that 15 milliamperes.

DOT Committee on Renewable Energy 2008

41 | P a g e
3.1.4 Data logging & remote monitoring: System should have option to retrieve performance data over a period of 1-2 years and remote monitoring of the same. Voltage to Load and battery: The SPV voltage at the output of the charge controller shall be limited to 55.2V for 48V power supplies. The SMPS output voltage shall also be controlled within these limits. Efficiency: Efficiency of the charge controller at full load and rated output voltage of 54V for 48V power supply respectively shall be in excess of 85% while working on SPV power source. Psophometeric Noise ( e. m. f. weighted at 800 Hz ): While working on SPV Power as well as SMPS, Psophometeric Noise with a battery of appropriate capacity floated and Radio Telephone equipment connected across the output shall be within 2mV as per ITU-T Rec. O41. Protections: The charge controller shall provide for the control circuitry using solid state switching techniques to incorporate suitable protections ( with a tolerance of +/- 1% for DC voltage and current) to safeguard circuit against the following conditions : a) DC over voltage: Charge controller: The output voltage of the charge controller shall be maintained in 55.2V for 48V. In case the charge controller output voltage exceeds 56V for 48V power supply due to failure of the voltage control device provided to control the SPV Power Source voltage, the SPV power source shall be isolated automatically, creating alarm. SPV power source shall get reconnected when the load voltage falls below the specified level, which corresponds to output voltage of 55.2V for 48V power supplies. b) Battery under voltage: In case output DC voltage falls below 44.4V for 48V power supply, the battery shall be isolated from the load. The load shall automatically be reconnected, when the voltage is above 50V for 48V power supply. c) Reverse Polarity: There shall not be any damage to the components of the power supply in case the polarity is reversed. The unit shall start its normal function when the correct polarity is restored. d) Reverse flow of current from the battery to the SPV module or wind generator: To avoid the discharge of the battery through the SPV modules during non-sunlight period or through wind generator or SMPS (when not delivering the output), the blocking diodes or any other suitable arrangement shall be provided in the charge controller between: SPV power source and battery terminals, Wind power source and battery, and SMPS and battery. e) Over Load/Short Circuit: The unit shall be protected for over load/ short circuit. It shall be ensured that short circuit does not lead to
DOT Committee on Renewable Energy 2008

3.2

3.3

3.4

3.5

42 | P a g e
any fire hazard. f) Fuse/ circuit Breakers with current limiting devices : Suitably fault rated fuses or circuit breakers with current limiting devices shall be provided for the following : i. Live AC input line ii. Negative DC output iii. Against failure of control sensing circuit. Note : 1. Use of mechanical switching devices such as relays etc. is not permitted in the control circuit. MCBs are, however, permitted for short circuit protection only. 2. Two fuses (minimum) of each type shall be provided with each unit. These fuses shall be kept inside the unit in an enclosure. 3.6 Monitoring Alarms and Indicating Lamps : Visual indications/display shall be provided by means of bright LCDs. Different colour display for different modes shall also be provided. Functional Indications: The following indications shall be provided to indicate mode in which the unit is functioning. The functional indications of FR/FC modules and DSCA shall be on FR/FC and DSCA of the SMPS also : a. AC Mains available (on charge controller, FR/FC module and DSCA) b. Battery Charging by SMPS c. Battery Charging by SPV Power d. Load on battery e. Battery Charging by Wind Power Alarms Indications on charge controller: 1. 2. 3. 4. 5. 6. 7. 8. 9. SPV Output Voltage Low. SPV Output Voltage High Battery Low Battery reverse polarity Over load SMPS fail SMPS fails to deliver power due to any reason Equipment Circuit Breaker Trip (if used) SPV Output Voltage Low. SPV Output Voltage High - Green - Amber - Yellow - Blue - Yellow

3.6.1

Display of System data: following shall be displayed Battery bank voltage Charging current Load current Total energy generated Total energy utilized Maximum battery voltage since midnight Wind power voltage
DOT Committee on Renewable Energy 2008

43 | P a g e
Minimum battery voltage since midnight Time of day when battery bank was fully charged Solar Panel Voltage (Open Circuit) System fault indication Performance data for last 1-2 years.

3.6.2

The SMPS shall be housed in 19 rack only. The Distribution Switching Control and Alarm (DSCA) of the SMPS may be mounted in the upper part of the rack above the FR-FC modules, while FR-FC modules shall be mounted in the remaining rack. The matching of the SPV Power source, wind power output and SMPS output shall be ensured by the charge controller. SMPS shall be based on Switch Mode Power Supply (SMPS) Technique using switching frequencies of 20KHz and above. The SMPS shall be capable of, independently, meeting the load requirements of load (telecom equipment) and battery bank. SMPS is intended to be used in Float-cum-Charge mode as a regulated D.C. Power Source. The unit should be expandable at rack level itself or by additional racks using the basic FR/FC modules of the same rating. The prescribed FR/FC ratings are 50A and above. It shall employ modular configuration for flexible provision of DC power. The unit shall only be based on menu driven Micro Processor Controlled Techniques (both DSCA as well as module) for control, monitoring and alarms. DSCA shall display its Software version. Setting of all the parameters shall be through menu-driven microprocessor control only. Use of potentiometer for setting of parameters is not permitted. AC input Supply: The Power Plant shall operate from single phase AC input range 90V to 300V(nominal input voltage 230V) The nominal input frequency is 50Hz which may vary from 48-52Hz. DC output Characteristics :

3.6.3

3.6.4

3.6.5

3.6.6

3.6.6.1 48V FR/FC Modules shall be capable of operating in the float mode (continuously adjustable pre-settable) at any value in the range of -48 to -56V from FR/FC, modules and DSCA. 3.6.6.2 There shall also be a provision so that DSCA may over ride the values set by individual module. The prescribed float voltage setting is - 54V for 48V units. 3.6.6.3 The DC output voltage shall be maintained within +/-1% of the half load preset voltage in the range 25% load to full load when measured at the output terminals over the full specified input range. 3.6.7 Efficiency : The efficiency of the unit shall be given below : a) At nominal input, output and full rated load : better than 89%. b) At other specified Input, output conditions : better than 85% and load between 50 to 100%
DOT Committee on Renewable Energy 2008

44 | P a g e
3.6.8 Input Power Factor : The true input Power Factor at nominal input, output voltage and rated load shall be better than 0.98 and shall be better than 0.95 in any other working condition and load between 50% to 100%. Active Power factor correction only shall be employed for the purpose. The Psophometeric Noise (e.m.f. weighted at 800Hz) : The Psophometeric Noise with a battery of appropriate capacity connected across the output should be within 2mV, while delivering the full rated load at nominal input of 230V. For test purposes, this shall be taken as equivalent to 4mV when the battery is not connected, other conditions remaining the same as per ITU-T Rec. O.41.

3.6.9

3.6.10 The Peak-to-Peak Ripple : Voltage at the output of the rectifier module without battery connected shall not exceed 300 mV at the Switching Frequency measured by an Oscilloscope of 50/60 MHz band-width (Typical). 3.6.11 Soft Start Feature and Transient Response : 3.6.12 Slow start circuitry shall be employed such that FR/FC module input current and output voltage shall reach their nominal value within 10 seconds. 3.6.13 Voltage overshoot/Undershoot : The requirements of this clause shall be achieved without a battery connected to the output of FR/FC module. 3.6.13.1 The FR/FC modules shall be designed to minimise output voltage Overshoot/ Undershoot such that when they are switched on the DC output voltage shall be limited to +/-5% of the set voltage and return to their steady state within 20 ms for any load of 25% to 100%. 3.6.13.2 The DC output voltage overshoot for a step change in AC mains from specified lowest to highest and vice-versa shall not cause shut- down of FR/FC module and the voltage overshoot shall be limited to +/5% of its set voltage and return to steady state within 20 ms. 3.6.13.3 The modules shall be designed such that a step load change of 25 to 100% shall not result in DC output voltage Overshoot/ Undershoot of not more than 5% and return to steady state value within 10 ms without resulting the unit to trip. 3.6.14 Total Voltage Harmonic Distortion: The Total line harmonic voltage distortion shall not be more than 5%. 3.6.15 Total Current Harmonic Distortion: The total current harmonic distortion contributed by the unit at the input shall not exceed 10% for input voltage range 90V-300V, for load between 50 to 100% of the rated capacity. 3.6.16 Current limiting (Voltage Droop): The Current limiting (Voltage Droop) shall be provided for Float/Charge operation. The float/charge current limiting shall be continuously adjustable between 50 to 100% of rated output current for output voltage range of -44.4 to -56 volts for 48V unit.
DOT Committee on Renewable Energy 2008

45 | P a g e
For test purposes upper limit of 100% + 5% and lower limit of 50% - 5% shall be acceptable. The float and charge current limit adjustment shall be provided, either on the front panel of the individual FR/FC module or through a provision at the centralised location on front panel of DSCA through a menu driven program capable of adjusting the float and charge current limits of the each FR/FC module individually, irrespective of the rating and number of modules located in the same rack or in other racks of the power plant for the ultimate capacity of the unit. The FR/FC modules shall be fully protected against short circuit. It shall be ensured that short circuit does not lead to any fire hazard. The unit shall start delivering output automatically when the short circuit is removed. 3.6.17 DC output Regulation : DC output shall regulate in the range 54V +/1% for 48V units for load between 25% to 100%, over the full specified input range. The nominal voltage shall be set at half load. 3.6.18 Load Sharing (Parallel operation) : 3.6.18.1 FR/FC modules shall be suitable for operating in parallel with one or more modules of similar type, make and rating, other output conditions remaining within specified limits. 3.6.18.2 The current sharing shall be within +/- 10% of the average current per rectifier module in the unit (mounted in the same or different racks) when loaded between 50 to 100% of its rated capacity for all working conditions. 3.6.18.3 In the event of failure of DSCA, FR/FC modules parameter shall not be disturbed. All the FR/FC modules shall take care of the load on default settings and share the load collectively. 3.6.18.4 Battery Under Voltage Isolation: There shall be a provision for Automatic Isolation/reconnection of each battery from the load. The Tendering Authority shall specify the load and battery capacity. The DC contactor used for the purpose shall be of single pole only. 3.6.18.5 The operate and release voltages for the above conditions shall be as follows : Cut-off: 1.85V/cell (44.4V for 48V units. It shall be settable between 1.85V and 1.9V/cell. A tolerance of 0.01V/cell is permissible in this case. 3.6.19 Reconnect: When the FR/FC voltage has built-up fully. It shall be settable between 2.15V to 2.3V/cell). 3.6.20 Battery Path Current Limiting : To ensure the availability of required exchange load and safety of the battery, the current in each battery path shall be settable as per the battery capacity so that the battery path current is kept to maximum 10% of battery AH capacity. Ordering Authority will give the capacity of the battery to be used for this purpose.

DOT Committee on Renewable Energy 2008

46 | P a g e
For the type approval the manufacturer shall demonstrate the facility and undertake to make provision as per order. 3.6.21 Temperature Compensation for Battery: There shall be provision for monitoring the temperature of battery and consequent arrangement for Automatic temperature compensation of the FR/FC (in Auto float/charge mode) output voltage to match the battery temperature dependant charge characteristics. The output voltage of the rectifier in Float/Charge operation shall decrease or increase at the rate of 72mV (24 cells battery@ 3mV per cell) and 18mV ( 6 cells battery @ 3mV per cell) per degree increase or decrease in temperature over the set voltage. The output voltage shall decrease till the open circuit voltage of the battery is reached. The open circuit voltage range shall be settable between 2.1V/cell to 2.2V/cell. At this voltage the power plant voltage get locked and further increase in temperature shall not decrease the voltage further. This voltage shall also remain locked till the temperature falls below the value corresponding to set value. When the output voltage reaches 55.8V, due to increase in the output voltage owing to decrease in temperature, it shall get locked at this voltage and any further decrease in temperature shall not lead to further rise in the output voltage of the power plant. This voltage shall also remain locked till the temperature rises above the value corresponding to set value. A tolerance +/- 1% may be acceptable over the rates as specified above. The nominal distance between the battery and power plant may be 20 metres. The manufacturer shall provide the necessary sensor and cord for the purpose with the power plant. Failure of temperature compensation circuit including sensors (including the open or short circuit) shall create an alarm and shall not lead to abnormal change in output voltage. Proper sign-writing shall be made in DSCA and both ends of temperature compensation cord for its easy termination. 3.6.22 Protections: In addition to the requirements given above, controller shall also provide for the following protections : the charge

3.6.23 AC Input : There shall be an automatic arrangement to provide galvanic isolation at the AC input of the FR/FC module whenever the input voltage is beyond the specified operating range ( 90V to 300V), with suitable alarm indication. The FR/FC module shall resume normal working automatically when the input is restored within the working limits. Hysteresis within specified working limits shall not cause shutting down of the FR/FC. A tolerance of +/-5V may be acceptable for protection and alarm operation. Reconnection shall occur at a voltage, 10V lower than the set voltage high isolation limit and 10V higher than the lower set limit to avoid hunting. The circuitry used for sensing the voltage for operation of isolation/ reconnection device shall be able to withstand a voltage 15% higher than the specified extreme limit of isolation. 3.6.24 D. C. Over voltage : a) Each rectifier module shall be fitted with an internal over- voltage protection circuit. In case output DC voltage exceeds 56V, the over voltage protection circuit shall operate and shut-off the faulty module. A tolerance of +/-0.01V/cell is permitted in this case. Restoration of the module shall be through a reset switch/push button.
DOT Committee on Renewable Energy 2008

47 | P a g e
b) Shutting-off of faulty FR/FC module shall operation of other FR/FCs operating in the rack. not affect the

c) Operation of over-voltage shut down shall be suitably indicated on the module and also extended to monitoring/control unit d) The circuit design shall ensure protection against the discharge of the Battery through the FR/FC module in any case. e) The over voltage protection circuit failure shall not cause any safety hazard. f) Over Load/Short Circuit: The FR/FC modules shall be fully protected against short circuit. It shall be ensured that short circuit does not lead to any fire hazard. The unit shall start delivering output automatically when the short circuit is removed. 3.6.25 Alarm Indications on SMPS: A. On FR/FC: a. FR/FC Over voltage b. FR/FC Under voltage or Output Fail c. FR/FC Overload (Voltage Droop) d. Fan fail (due to any reason) All the above alarm Indications shall be extended to DSCA as FR/FC fail. B. On DSCA: SMPS output voltage High : above 55.6V/Low below 45.6V a) FR/FC fail (any failure condition as in A Above) b) Mains Out of range c) Unit Over Load d) Mains "ON"/Battery Discharge e) Temp. Compensation fail f) Battery Fail or No Battery (separate for each Battery) g) Battery isolated from the load(due to any reason) h) Lightning and surge protection Stage II Fail

4. Environmental Requirements: The system shall be designed to work satisfactorily under all the environmental conditions as specified in this clause. SPV modules, charge controller, mounting structure and batteries shall be capable of working in a saline atmosphere in coastal areas and shall be free from any corrosion at any period of time in compliance with the requirements of relevant clauses of QM-333. SPV Modules, Charge controller & battery shall also be capable to withstand the rigors of transportation, handling & working satisfactorily as specified in Category B2 of QM-333 including Corrosion (salt mist) and high altitude (up to 3000 meters) tests.

DOT Committee on Renewable Energy 2008

48 | P a g e

5. Specification for Wind Generator

The small wind turbine is required for the operation of Base Transceiver Stations (BTS) in areas with deficit grid power and sufficient wind power for the operation of such turbine. The turbine and its associated circuitry is expected to supply 42 to 58 volts regulated DC to the telecommunications load at BTS. The following clauses provide the Generic Requirements for the turbines. 5.1 Technical specifications 5.1.1 Capacity 5.1.2 Type 4-5 kW (as per requirement) Horizontal Axis - Battery Charger / Aerogenerator to be used as hybrid system in conjunction with SPV < 200 sq.m. 2.5 3.0 m/s. 3.0 m/s 11 14 m/s 25 m/s > 15 m/s > 50 60 m/s 20 years

5.1.2 Swept Area 5.1.3 Start up Wind Speed 5.1.4 Cut in wind speed 5.1.5 Rated wind speed 5.1.6 Cut out wind speed 5.1.7 Furling wind speed 5.1.8 Survival Wind Speed 5.1.9 Design Life time 5.2

Mechanical specifications 2/3 bladed up wind NACA Glass/Carbon fibre reinforced plastic Pitch / Stall regulated

5.2.1 Type 5.2.2 Blade profile 5.2.3 Blade Material 5.2.4 Rotor regulation

5.2.5 Generator Transmission Direct Drive 5.2.6 Yaw system Active / passive, upwind tracking

5.2.7 Over speed protection (i) Auto Tail furling system.

DOT Committee on Renewable Energy 2008

49 | P a g e (ii) Automatic/controller based protection 5.2.8 Braking System (i) Manual Button / switch for shutdown the turbine under all normal operating conditions for turbines with swept area > 40 sq.m. (ii) Automatic 5.3 Tower Lattice / Tubular (free standing tower) 20 m

5.3.1 Type

5.3.2 Height 5.4 Control System

5.4.1 Type 5.4.2 Display parameters

PLC / Micro processor based 10 minutes average wind speed (m/s), Wind Directions, Cumulative generation (units) monthly generation (units), Hourly generation (units), Events Log.

5.5

Charge Controller / converter 5 kVA/ 10 kVA or as desired 42 58 V D.C.

5.5.1 Rating 5.5.2 Output Voltage 5.6 5.7 5.8

Emission standard shall be as per the TEC standard TBRR/F/GQRGN/33.TEC /2004 (Part) Dated 11.01.2008. Mechanical and electrical safety of the users shall be ensured. Type test from accrediting laboratory/centre to be furnished strictly in accordance with IEC 61400-2 (design requirement of small wind turbines). Power curve shall be furnished by the manufacturer.

5.9

DOT Committee on Renewable Energy 2008

50 | P a g e

6. Cabling & interconnections All cables shall be confirming to IS 694 Only PVC Copper cables shall be used Size of cables shall be so selected to keep the voltage drop and losses to the minimum

7. Earthing The array structure shall be grounded properly using adequate number of grounding kits. All metal casing/shielding of the plant shall be thoroughly grounded to ensure safety of the power plant.

DOT Committee on Renewable Energy 2008

51 | P a g e

Relevant Ruling under which USOF Support may be given: Rule 525, sub rule (2) (iii)

ANNEXURE 7 I. Past Initiatives of USOF in Utilization of Renewable Energy: 1. The issue of irregular and deficient power supply in rural areas and its adverse impact on the sustained functioning of rural telecommunication facilities has been brought to the notice of USOF

Stream III under the Indian Telegraph (Amendment) Rules, 2006- Creation of Infrastructure for Provision of Mobile Services in Rural and Remote areas: (a) The assets constituting the infrastructure for provision of mobile infrastructure shall be determined by the Central Government, from time to time; (b) A percentage of Capital Recovery for the infrastructure for provision of mobile services shall be taken into account to determine the Net Cost. Rule 525, sub rule (2) (vi) Stream VI-Induction of new technological developments in telecom sector in rural and remote areas: Pilot projects to establish new technological developments in the telecom sector, which can be deployed in rural and remote areas, may be supported with the approval of the Central Government. Rule 526 Criteria for selection of Universal Service providerUnder this rule the mode for selection of the Universal Service Provider is to be by a bidding process. However, activities relating to pilot projects under Stream VI mentioned above are (Rule 525, sub rule (2) (vi) constitute one of the exceptions to this rule allowing selection by nomination.

Administration by CCA offices across the country through their reports and by

Telecom Service Providers.

2. Reports

from

CCA

offices

have

often

highlighted the negative impact of rural power shortages on the functioning of battery dependant, USOF subsidized, VPTs, RDELs and RCPs This working on CDMA gravity

technology.

assumes

especially in the case of public access telephones, which are a crucial source of tele-connectivity population. for the office bulk of rural had

CCA

Haryana

undertaken an initiative called Sanchar Kiran in coordination with Haryanas

Renewable Energy Department HAREDA, wherein customized solar chargers were developed and successfully tested for the CDMA phones of the USPs in Haryana.

DOT Committee on Renewable Energy 2008

52 | P a g e 3. Subsequently the matter of providing solar back up devices for CDMA FWT based VPTs was taken up by USOF

Administration with CMD BSNL in a special meeting on remedial measures to improve the functioning of VPTs held on 16.11.07. BSNL committed that it would float a tender to provision solar devices for one lakh CDMA FWT VPTs in villages where the power situation was critical. BSNL

however, requested for subsidy support. Accordingly the matter was taken up by USOF Administration with MNRE and it was jointly decided that this pilot project would be subsidized to the extent of 25% of the tendered cost by MNRE. Another 25% would be subsidized by USOF. The BSNL tender for this project has now been floated.

4. During this meeting it had also been decided that MNRE would assist the USOF in exploring the possibility of subsidizing hybrid non-conventional power solutions for telecom installations. In subsequent meetings MNRE

also expressed willingness to provide technical support to USOF in this regard. The last such meeting held on 2-5-08

under the chairmanship of Secretary, MNRE and was attended by JA (Finance) USOF and Sr DDG BW. In this meeting the possibility of jointly supporting pilot projects to demonstrate the efficacy and cost effectiveness of various combinations of hybrid sources of renewal energy was discussed.

5. Consequent to the above mentioned meeting, it was proposed that the option of renewal energy utilization could be built into the USOF tender for the forthcoming mobile infrastructure schemes. This issue was discussed with the

IPs/USPs in meetings held at USOF HQ on phase I and phase II of the mobile infrastructure scheme and they have
DOT Committee on Renewable Energy 2008

53 | P a g e expressed an active interest in the same. Thereafter, on

invitation by USOF HQ, service providers presented their views on how the renewable energy could be incorporated in the power requirement for the mobile infrastructure scheme, to USOF on 16.7.08.

II.

The Importance of Incorporating the use of Renewable Energy into USOF Schemes for Shared Mobile

Infrastructure in Rural and Remote Areas

1. Phase I of the USOF scheme providing for setting up of about 7871 mobile infrastructure sites in villages without wireless signal coverage, is already under implementation in rural and remote areas across the country. As per the feedback

received from the IPs/USPs and the CCA Offices who are monitoring the progress of the Scheme, it is evident that the availability of power for rural BTSs is a major constraint in operationalising mobile services in rural and remote areas.

2. Anticipating the constraint of non availability of the grid supply, the relevant USOF Agreement for Mobile Phase Infrastructure (No. 30-148/2007-USF (Part. A) dated

14.5.2007 under clause 10.4 of the Technical Conditions, provides that in such an event, an additional DG Set (of the same capacity and features of the mandatory back up DG Set defined in the Agreement) is to be provided by the IP for the shared USOF site without any further subsidy support. It has also been mentioned that in case hybrid power supply systems with DG sets and SPV systems, or any other combination is provided, it should meet the specifications as prescribed in the Agreement.

DOT Committee on Renewable Energy 2008

54 | P a g e 3. It is understood that as of now there would be a fairly large number of USOF sites which may have to function continuously with two DG sets on account of non availability of grid power in the forthcoming few years. Reports received from the field units indicate that there is considerable reluctance on the part of IPs towards payment of the heavy charges of extending the grid supply to USOF sites. They are also chary of running a second DG set as this entails additional costs. 4. It has often been expressed by IPs/USPs that the initial capital cost of installing renewable energy power sources such as solar or solar wind, hybrid etc, is prohibitive. In the USOF benchmarking exercise, the cost attributed to the electric connection (grid) supply has been taken to be around Rs. 3.5 lakhs. Thus it could be said that in the event of non-

availability of the grid supply, around Rs. 3.5 lakhs of funds (as per USOF benchmark) may be allocated either towards the second DG set, or installation of renewable energy capacity. This allocation is clearly inadequate given that the

capital cost per KW of solar power system would be around Rs.3.5-4 lakh and that of wind power systems be around Rs. 1 lakh. (In comparison to this, an off-grid shared mobile site would require an initial investment of around 30 -50 lakhs for a SPV/hybrid system to cater to a combined power

requirement of 6 KW.)

DOT Committee on Renewable Energy 2008

55 | P a g e

ANNEXURE 8

Option

Load KW

DC Battery Daily SPV AH by WTG AH by Battery AH reqd Amps AH AH KWp SPV KW WTG deficiency from DG reqd created AH 40 80 120 40 80 120 120 2500 2500 2500 2500 2500 2500 2500 960 1920 2880 960 1920 2880 2880 17 17 17 13 13 13 17 1063 1063 1063 813 813 813 1063 0 0 0 4.2 4.2 4.2 8.4 0 0 0 263 263 263 525 0 858 1818 0 845 1805 1293 0 858 1818 0 845 1805 1293

Amps Daily DG by DG operation Hrs reqd 165 205 245 165 205 245 245 0.0 4.2 7.4 0.0 4.1 7.4 5.3

2 4 6 2 4 6 6

II

III

Option

Load KW

DC Battery Daily SPV AH by WTG AH by Battery AH reqd Amps AH AH KWp SPV KW WTG deficiency from DG reqd created AH 40 80 120 40 80 120 2500 2500 2500 2500 2500 2500 960 1920 2880 960 1920 2880 10 10 10 10 10 10 625 625 625 625 625 625 0 0 0 4.2 4.2 4.2 0 0 0 263 263 263 335 1295 2255 73 1033 1993 335 1295 2255 73 1033 1993

Amps Daily DG by DG operation Hrs reqd 165 205 245 165 205 245 2.0 6.3 9.2 0.4 5.0 8.1

2 4 6 2 4 6

II

KVA

Generator output KW (%)

DC Amps at 48 V 142 213 283

10 15 20

8 12 16

85 85 85

DOT Committee on Renewable Energy 2008

56 | P a g e

ANNEXURE 9 Case I ( load 2 KW) 10 KWp solar system

2500 2000 1500 1000 500 0 1st day Battery (AH) SPV (AH) 2nd day 3rd day 4th day Daily Consumption (AH) Balance

Depending upon the set value of Depth of discharge (DOD), DG set can be operated for 20% DOD : DG set is to be operated on 3 rd day for 40% DOD : DG set is to be operated on 5 th day for 60% DOD : DG set is to be operated on 7th day or once a week

DOT Committee on Renewable Energy 2008

57 | P a g e

Case II (load 4 KW) 10 KWp solar system

5000 4500 4000 3500 3000 2500 2000 1500 1000 500 0 1st day 2nd day 3rd day Battery (AH) SPV (AH) Daily Consumption(AH) Balance

Depending upon the set value of Depth of discharge (DOD), DG set can be operated for 20% DOD : DG set is to be operated daily for 40% DOD : DG set is to be operated on 2 nd day for 60% DOD : DG set is to be operated on 3rd day

DOT Committee on Renewable Energy 2008

58 | P a g e Case III (load 6 KW) 10 KWp solar system

8000 6000 4000 2000 0 1st day 2nd day 3rd day Battery (AH) Daily Consumption SPV (AH) Balance

(AH)

Depending upon the set value of Depth of discharge (DOD), DG set can be operated for 20% DOD : DG set is to be operated daily for 40% DOD : DG set is to be operated on 2 nd day for 60% DOD : DG set is to be operated on 3rd day

DOT Committee on Renewable Energy 2008

59 | P a g e ANNEXURE 10
COST COMPARISON OF RUNNING THE EQUIPMENT ON DG SET & SPV Option I [ 17 KWp SPV - Generator Hybrid system] CASE I : Payback Period is Existing 24 Hrs. DG Operation 4 Lt/hr - Rs. 38 /lt Load - 2 KW SPV-17 KWp WTG - 0 KW No DG operation Loan @ 13.75% for 7 years Capital Cost 45 Rs Lacs 6.3 years

Costing for 7 years, 10% inflation / year Year 1 2 3 4 5 6 7 Diesel Cost ( Rs.- Lakhs) 13.32 14.65 16.11 17.72 19.49 21.44 23.59

Interest Total outflow Net Cumulative Balance Diesel Cost Installment (Rs Lakhs) ( Rs.- Lakhs) ( Rs.- Lakhs) ( Rs.- Lakhs) Benefit Benefits 0.70 45.00 0 6.43 6.19 12.62 0.70 0 6.43 5.30 11.73 2.91 3.61 38.57 0 6.43 4.42 10.85 5.26 8.88 32.14 16.64 25.71 0 6.43 3.54 9.96 7.76 0 6.43 2.65 9.08 10.41 27.05 19.29 0 6.43 1.77 8.20 13.25 40.30 12.86 0 6.43 0.88 7.31 16.28 56.57 6.43 7.5 years

CASE II : Payback Period is Existing 24 Hrs. DG Operation 4 Lt/hr - Rs. 38 /lt

Load - 4 KW SPV-17 KWp WTG - 0 KW Daily DG operation : 4 hrs Loan @ 13.75% for 7 years Capital Cost 45 Rs Lacs Net -1.52 0.47 2.58 4.80 7.17 9.67 12.34 21.62 Cumulative Balance Benefits -1.52 45.00 -1.05 38.57 1.53 32.14 6.34 25.71 13.50 19.29 23.17 12.86 35.52 6.43 57.14 0.00

Costing for 7 years, 10% inflation / year Year 1 2 3 4 5 6 7 8 Diesel Cost ( Rs.- Lakhs) 13.32 14.65 16.11 17.72 19.49 21.44 23.59 25.95

Interest Total outflow Diesel Cost Installment (Rs Lakhs) ( Rs.- Lakhs) ( Rs.- Lakhs) ( Rs.- Lakhs) 2.22 6.43 6.19 14.84 2.44 6.43 5.30 14.17 2.69 6.43 4.42 13.53 2.95 6.43 3.54 12.92 3.25 6.43 2.65 12.33 3.57 6.43 1.77 11.77 3.93 6.43 0.88 11.25 4.32 0.00 0.00 4.32

DOT Committee on Renewable Energy 2008

60 | P a g e
Option I [ 17 KWp SPV - Generator Hybrid system] CASE III : Payback Period is Existing 24 Hrs. DG Operation 4 Lt/hr - Rs. 38 /lt Load - 6 KW SPV - 17 KWp WTG - 0 KW Daily DG operation : 7 hrs Loan @ 13.75% for 7 years Capital Cost 45 Rs Lacs 8.5years

Costing for 7 years, 10% inflation / year Year 1 2 3 4 5 6 7 8 9 Diesel Cost ( Rs.- Lakhs) 13.32 14.65 16.11 17.72 19.49 21.44 23.59 25.95 28.54

Total outflow Benefit Cumulative Balance Diesel Cost Installment Interest Benefits (Rs Lakhs) ( Rs.- Lakhs) ( Rs.- Lakhs) ( Rs.- Lakhs) 3.88 6.43 6.19 16.50 -3.18 -3.18 45.00 4.27 6.43 5.30 16.00 -1.36 -4.54 38.57 4.70 6.43 4.42 15.55 0.56 -3.98 32.14 5.17 6.43 3.54 15.13 2.59 -1.39 25.71 5.69 6.43 2.65 14.77 4.73 3.34 19.29 6.25 6.43 1.77 14.45 6.99 10.33 12.86 6.88 6.43 0.88 14.19 9.40 19.73 6.43 7.57 0.00 0.00 7.57 18.38 38.11 0.00 8.32 0.00 0.00 8.32 20.22 58.33 0.00

Option II [ 13 KWp SPV - 4.2 KW WTG - Generator Hybrid system] CASE I : Payback Period is 5.1 years Existing 24 Hrs. DG Operation 4 Lt/hr - Rs. 38 /lt Load - 2 KW SPV - 13 KWp WTG - 4.2 KW No DG operation Loan @ 13.75% for 7 years Capital Cost 37 Rs Lacs

Costing for 7 years, 10% inflation / year Year 1 2 3 4 5 6 Diesel Cost ( Rs.- Lakhs) 13.32 14.65 16.11 17.72 19.49 21.44

Total outflow Benefit Cumulative Balance Diesel Cost Installment Interest Benefits (Rs Lakhs) ( Rs.- Lakhs) ( Rs.- Lakhs) ( Rs.- Lakhs) 0.00 5.29 5.09 10.37 2.94 2.94 37.00 0.00 5.29 4.36 9.65 5.00 7.94 31.71 0.00 5.29 3.63 8.92 7.19 15.13 26.43 0.00 5.29 2.91 8.19 9.53 24.66 21.14 0.00 5.29 2.18 7.47 12.03 36.69 15.86 0.00 5.29 1.45 6.74 14.70 51.40 10.57

DOT Committee on Renewable Energy 2008

61 | P a g e

Option II [ 13 KWp SPV - 4.2 KW WTG - Generator Hybrid system] CASE II : Payback Period is 6.3 years Existing 24 Hrs. DG Operation 4 Lt/hr - Rs. 38 /lt Load - 4 KW SPV - 13 KWp WTG - 4.2 KW Daily DG operation : 4 hrs Loan @ 13.75% for 7 years Capital Cost 37 Rs Lacs

Costing for 7 years, 10% inflation / year Year 1 2 3 4 5 6 7 Diesel Cost ( Rs.- Lakhs) 13.32 14.65 16.11 17.72 19.49 21.44 23.59

Diesel Cost Installment Interest Total outflow Net Cumulative Balance Benefits (Rs Lakhs) ( Rs.- Lakhs) ( Rs.- Lakhs) ( Rs.- Lakhs) 2.22 5.29 5.09 12.59 0.72 0.72 37.00 3.28 31.71 2.44 5.29 4.36 12.09 2.56 2.69 5.29 3.63 11.60 4.51 7.79 26.43 2.95 5.29 2.91 11.15 6.58 14.36 21.14 3.25 5.29 2.18 10.72 8.78 23.14 15.86 34.27 10.57 3.57 5.29 1.45 10.31 11.13 3.93 5.29 0.73 9.94 13.64 47.92 5.29

CASE III : Payback Period is Existing 24 Hrs. DG Operation 4 Lt/hr - Rs. 38 /lt

7.3 years

Load - 6 KW SPV - 13 KWp WTG - 4.2 KW Daily DG operation : 7 hrs Loan @ 13.75% for 7 years Capital Cost 37 Rs Lacs

Costing for 7 years, 10% inflation / year Year 1 2 3 4 5 6 7 8 Diesel Cost ( Rs.- Lakhs) 13.32 14.65 16.11 17.72 19.49 21.44 23.59 25.95

Diesel Cost Installment Interest Total outflow Net Cumulative Balance Benefits (Rs Lakhs) ( Rs.- Lakhs) ( Rs.- Lakhs) ( Rs.- Lakhs) 3.88 5.29 5.09 14.26 -0.94 -0.94 37.00 4.27 5.29 4.36 13.92 0.73 -0.21 31.71 4.70 5.29 3.63 13.62 2.49 2.28 26.43 5.17 5.29 2.91 13.36 4.36 6.64 21.14 5.69 5.29 2.18 13.15 6.34 12.98 15.86 6.25 5.29 1.45 12.99 8.45 21.43 10.57 6.88 5.29 0.73 12.89 10.70 32.13 5.29 7.57 0.00 0.00 7.57 18.38 50.51 0.00

DOT Committee on Renewable Energy 2008

62 | P a g e
Option III [ 17 KWp SPV - 2x4.2 KW WTG - Generator Hybrid system] CASE I : Payback Period is Existing 24 Hrs. DG Operation 4 Lt/hr - Rs. 38 /lt Load - 6 KW SPV - 17 KWp WTG - 2x4.2 KW Daily DG operation : 5 hrs Loan @ 13.75% for 7 years Capital Cost 51 Rs Lacs 8.5 years

Costing for 7 years, 10% inflation / year Year 1 2 3 4 5 6 7 8 9 Diesel Cost ( Rs.- Lakhs) 13.32 14.65 16.11 17.72 19.49 21.44 23.59 25.95 28.54

Total outflow Benefit Cumulative Balance Diesel Cost Installment Interest Benefits (Rs Lakhs) ( Rs.- Lakhs) ( Rs.- Lakhs) ( Rs.- Lakhs) 2.77 7.29 7.01 17.07 -3.76 -3.76 51.00 3.05 7.29 6.01 16.35 -1.70 -5.46 43.71 3.36 7.29 5.01 15.65 0.46 -5.00 36.43 3.69 7.29 4.01 14.99 2.74 -2.26 29.14 4.06 7.29 3.01 14.35 5.14 2.88 21.86 4.47 7.29 2.00 13.76 7.69 10.57 14.57 4.91 7.29 1.00 13.20 10.39 20.96 7.29 5.41 0.00 0.00 5.41 20.54 41.50 0.00 5.95 0.00 0.00 5.95 22.60 64.09 0.00

Option IV [ 10 KWp SPV - Generator Hybrid system] CASE I : Payback Period is 3.6 years Existing 24 Hrs. DG Operation 4 Lt/hr - Rs. 38 /lt Load - 2 KW SPV-10 KWp WTG - 0 KW Daily DG operation : 2 hrs Loan @ 13.75% for 7 years Capital Cost 26 Rs Lacs

Costing for 7 years, 10% inflation / year Year 1 2 3 4 5 6 7 Diesel Cost ( Rs.- Lakhs) 13.32 14.65 16.11 17.72 19.49 21.44 23.59

Total outflow Benefit Cumulative Balance Diesel Cost Installment Interest Benefits (Rs Lakhs) ( Rs.- Lakhs) ( Rs.- Lakhs) ( Rs.- Lakhs) 1.11 3.71 3.58 8.40 4.92 4.92 26.00 1.22 3.71 3.06 8.00 6.65 11.56 22.29 1.34 3.71 2.55 7.61 8.50 20.06 18.57 1.48 3.71 2.04 7.23 10.49 30.55 14.86 1.62 3.71 1.53 6.87 12.62 43.18 11.14 1.79 3.71 1.02 6.52 14.92 58.10 7.43 1.97 3.71 0.51 6.19 17.40 75.50 3.71

DOT Committee on Renewable Energy 2008

63 | P a g e

Option IV [ 10 KWp SPV - Generator Hybrid system] CASE II : Payback Period is 4.5 years Existing 24 Hrs. DG Operation 4 Lt/hr - Rs. 38 /lt Load - 4 KW SPV-10 KWp WTG - 0 KW Daily DG operation : 6 hrs Loan @ 13.75% for 7 years Capital Cost 26 Rs Lacs

Costing for 7 years, 10% inflation / year Year 1 2 3 4 5 6 7 Diesel Cost ( Rs.- Lakhs) 13.32 14.65 16.11 17.72 19.49 21.44 23.59

Diesel Cost Installment Interest Total outflow Benefit Cumulative Balance Benefits (Rs Lakhs) ( Rs.- Lakhs) ( Rs.- Lakhs) ( Rs.- Lakhs) 3.33 3.71 3.58 10.62 2.70 2.70 26.00 3.66 3.71 3.06 10.44 4.21 6.90 22.29 4.03 3.71 2.55 10.30 5.82 12.72 18.57 4.43 3.71 2.04 10.19 7.53 20.25 14.86 4.87 3.71 1.53 10.12 9.37 29.63 11.14 5.36 3.71 1.02 10.10 11.35 40.98 7.43 5.90 3.71 0.51 10.12 13.47 54.44 3.71

CASE III : Payback Period is Existing 24 Hrs. DG Operation 4 Lt/hr - Rs. 38 /lt

5.8 years

Load - 6 KW SPV - 10 KWp WTG - 0 KW Daily DG operation : 9 hrs Loan @ 13.75% for 7 years Capital Cost 26 Rs Lacs

Costing for 7 years, 10% inflation / year Year 1 2 3 4 5 6 7 Diesel Cost ( Rs.- Lakhs) 13.32 14.65 16.11 17.72 19.49 21.44 23.59

Diesel Cost Installment Interest Total outflow Benefit Cumulative Balance Benefits (Rs Lakhs) ( Rs.- Lakhs) ( Rs.- Lakhs) ( Rs.- Lakhs) 4.99 3.71 3.58 12.28 1.03 1.03 26.00 5.49 3.71 3.06 12.27 2.38 3.41 22.29 6.04 3.71 2.55 12.31 3.80 7.21 18.57 6.65 3.71 2.04 12.40 5.32 12.53 14.86 7.31 3.71 1.53 12.56 6.94 19.47 11.14 8.04 3.71 1.02 12.78 8.67 28.13 7.43 8.85 3.71 0.51 13.07 10.52 38.65 3.71

DOT Committee on Renewable Energy 2008

64 | P a g e

Option V [ 10 KWp SPV - 4.2 KW WTG - Generator Hybrid system] CASE I : Payback Period is 4 years Existing 24 Hrs. DG Operation 4 Lt/hr - Rs. 38 /lt Load - 2 KW SPV - 10 KWp WTG - 4.2 KW Daily DG operation : 1 hrs Loan @ 13.75% for 7 years Capital Cost 29 Rs Lacs

Costing for 7 years, 10% inflation / year Year 1 2 3 4 5 6 7 Diesel Cost ( Rs.- Lakhs) 13.32 14.65 16.11 17.72 19.49 21.44 23.59

Diesel Cost Installment Interest Total outflow Benefit Cumulative Balance Benefits (Rs Lakhs) ( Rs.- Lakhs) ( Rs.- Lakhs) ( Rs.- Lakhs) 4.63 29.00 0.55 4.14 3.99 8.69 4.63 0.61 4.14 3.42 8.17 6.48 11.11 24.86 0.67 4.14 2.85 7.66 8.45 19.55 20.71 0.74 4.14 2.28 7.16 10.56 30.12 16.57 0.81 4.14 1.71 6.66 12.83 42.95 12.43 0.89 4.14 1.14 6.18 15.27 58.22 8.29 0.98 4.14 0.57 5.70 17.89 76.11 4.14

CASE II : Payback Period is Existing 24 Hrs. DG Operation 4 Lt/hr - Rs. 38 /lt

5 years

Load - 4 KW SPV - 10 KWp WTG - 4.2 KW Daily DG operation : 5 hrs Loan @ 13.75% for 7 years Capital Cost 29 Rs Lacs

Costing for 7 years, 10% inflation / year Year 1 2 3 4 5 6 7 Diesel Cost ( Rs.- Lakhs) 13.32 14.65 16.11 17.72 19.49 21.44 23.59

Diesel Cost Installment Interest Total outflow Benefit Cumulative Balance Benefits (Rs Lakhs) ( Rs.- Lakhs) ( Rs.- Lakhs) ( Rs.- Lakhs) 2.77 4.14 3.99 10.90 2.41 2.41 29.00 3.05 4.14 3.42 10.61 4.03 6.45 24.86 3.36 4.14 2.85 10.35 5.76 12.21 20.71 3.69 4.14 2.28 10.11 7.61 19.82 16.57 4.06 4.14 1.71 9.91 9.58 29.40 12.43 4.47 4.14 1.14 9.75 11.69 41.09 8.29 4.91 4.14 0.57 9.63 13.96 55.06 4.14

DOT Committee on Renewable Energy 2008

65 | P a g e

Option V [ 10 KWp SPV - 4.2 KW WTG - Generator Hybrid system] CASE III : Payback Period is 6 years Existing 24 Hrs. DG Operation 4 Lt/hr - Rs. 38 /lt Load - 6 KW SPV - 10 KWp WTG - 4.2 KW Daily DG operation : 8 hrs Loan @ 13.75% for 7 years Capital Cost 29 Rs Lacs

Costing for 7 years, 10% inflation / year Year 1 2 3 4 5 6 7 Diesel Cost ( Rs.- Lakhs) 13.32 14.65 16.11 17.72 19.49 21.44 23.59

Total outflow Benefit Cumulative Balance Diesel Cost Installment Interest Benefits (Rs Lakhs) ( Rs.- Lakhs) ( Rs.- Lakhs) ( Rs.- Lakhs) 4.44 4.14 3.99 12.57 0.75 0.75 29.00 2.95 24.86 4.88 4.14 3.42 12.44 2.20 5.37 4.14 2.85 12.36 3.75 6.70 20.71 5.91 4.14 2.28 12.33 5.39 12.09 16.57 6.50 4.14 1.71 12.35 7.14 19.24 12.43 7.15 4.14 1.14 12.43 9.01 28.25 8.29 7.86 4.14 0.57 12.58 11.01 39.27 4.14

DOT Committee on Renewable Energy 2008

66 | P a g e

ANNEXURE 11

Layout Diagram of USOF Ph-I site for SPV

20 5 2 1.5 DG set

Service Provider -2 3 Service Provider -1 3

Tower

Service Provider -3

16

SPV
Clear Area : 160 sq mtr

South facing

DOT Committee on Renewable Energy 2008