Sei sulla pagina 1di 11

TENDER DOCUMENT

( Financial Bid) For Construction of open well , a system to feed rain water ( rain water harvesting) to two nos. of existing bore well and construction of rain water drainage works in the campus at IIG New Panvel, Navi Mumbai. AT

INDIAN INSTITUTE OF GEOMAGNETISM New Panvel,Navi Mumbai The duly filled tender along with credentials can be submitted upto 15:00hrs.on 13th May 2011

INDIAN INSTITUTE OF GEOMAGNETISM


(Dept. of Science and Technology, Govt.of India)

Plot No: 05,Sector :18,Kalamboli highway, New Panvel (W) ,Navi Mumbai 410218 Tel. 022-27484000, Fax. 022-27480762

TENDER DOCUMENT PART B FINANCIAL BID

ANNEXURE
(FINANCIAL BID)

A) SHEDULE OF QUANTITY FORM ( PRICE BID) B) TENDER DRAWINGS VIDE ANNEXURE A ,B AND C C) GENERAL SPECIFICATION FOR WORKS (Same as CPWD specifications for the respective items of work:

SCHEDULE OF QUANTITY FORM A

For the proposed work of Construction of one open well, a system, (rain water harvesting) to feed rain water to two nos. of existing bore well and construction of rain water drainage works in the campus at IIG New Panvel
CPWD ITEM CODE 2.9.1

Sr.No Items of work

Unit

Quantity

Rate Rs./-

Amount Rs.

( A) Quotation for one no. of filtration tank 1 Earth work in excavation by mechanical / manual means in foundation trenches or drains including dressing of sides and ramming of bottom lift upto 1.5 meter including getting out the excavated soil and disposal of surplus excavated soil as directed within lead of 50 meters Ordinary rock Brick work with FPS bricks of class designation 75 in foundation and plinth in Cement mortar 1: 4 for filtration tank Half brick masonry with FPS bricks of class designation 75 in foundation and plinth Cement mortar 1:3 for the baffle wall in filtration tank Cub.meter 6.70

M.R. 6.12.1

2 3

Cub. meter Sq. meter

1.60 1.22

M.R. M.R.

4 5

M.R.

M.R.

15 mm cement plaster 1:3 finished with a Sq. meter 19.30 floating coat of neat cement. (For both ,Internal and external plastering) Providing and laying in position cement Cub. 0.35 concrete of specified grade excluding the cost Meter of centering and shuttering , all works upto plinth level 1:1:2 ( 1 cement : 1 course sand : graded stone aggregates ) Demolition and making hole in masonry of the existing storm water drain for tapping the rain water and filling the same with patch Lump sum brick work and neat water proof cement plaster with cement punning after fixing R.C.C. pipe lien etc. completed as directed Providing , supplying and filling the filtration chamber / tank with the graded aggregates 90 mm, 65 mm, 25 mm and course sand. Lump sum ( 1.215 CUB METER / filtration tank)

M.R.

Steel work welded in built up sections / framed work including cutting , hoisting , fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required In gratings, frames, guard bars ets. (Providing ,supplying, fabricating and fitting the M.S cover/ grating over the filtration tank)

Kgs.

135.0

Total cost for one no. of filtration chamber = Rs. Cost For Two Nos. of Filtration chambers = Rs. ____________X 2 = Rs.______________ ( A )Total cost for filtration chambers works = Rs. _________________ ( B) Quotation for pipe line work M.R. 1 Providing and laying non pressure NP-2 R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 ( 1 cement : 2 fine sand ) including testing of joints etc. competed as directed 150 mm dia. R.C.C. pipe Excavating trenches of required width for pipes including excavation for sockets depth upto 1.5 meters including getting out the material , returning the soil as required in layers not exceeding 20 cm in depth including consolidating each deposited layer by ramming, watering etc. stacking serviceable material for measurement and disposal of unserviceable material as directed within a lead of 50 meters meters 22.0

2.13.1.2 2

RMT

22.00

M.R.

For pipe s, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia . Providing and laying in position cement Cub. concrete of specified grade excluding the cost meter of centering a shuttering, all works upto plinth level over the pipe line (0.125 meter thk.) 1:1:2 ( 1 cement : 1 course sand : graded stone aggregates ) Providing and laying in position cement Cub. concrete of specified grade excluding the cost meter of centering a shuttering, all works upto plinth level over the pipe line (0.125 meter thk.) For covering the pipeline 1:3:6 ( 1 cement : 3 course sand : 6 graded

2.5

M.R.

3.8

5.9.1 M.R.

5 6

stone aggregates ) Centering and shuttering including strutting , propping etc and removal of form For pipe surrounding, two side shuttering Providing , supplying and fixing 6 HDPE PVC pipe line

Sq. meter Lump sum

20.0

Total ( B )Total cost for pipe line works = Rs. ________________ ( C ) Quotation for construction of open well M.R. 6.24 Brick work with FPS bricks of class designation 75 in foundation and in cement mortar 1:4 Extra for laying brick work in or under water / mud including cost of pumping or bailing out water and removing slush Etc. Completed as directed Honey comb brickwork 10/ 11.4 cm thick with bricks of class designation 75 in cement mortar 1:4 Earth work in excavation by mechanical means / manual means over areas including disposal of excavated earth , lead upto 50 meter and lift upto 1.5 meter , disposed earth neatly to be leveled and neatly dressed Hard rock ( blasting prohibited) 15 mm cement plaster 1:3 finished with a floating coat of neat cement. (For both ,Internal and external plastering) Cub meter 2.10 Cub meter 2.10

6.23 2.7.3

Sq.meter

2.19

Cub meter 15.11

M.R. M.R.

Sq. meter Kgs.

25.0 110.0

M.R.

Steel work, welded in built up sections / framed work including cutting , hoisting , fixing in position and applying a priming coat of approved steel primer and two coats of synthetic enamel paint to structural steel work and two coats of synthetic enamel paint etc. as required in gratings, frames, guard bars ets. (Providing ,supplying, fabricating and fitting the M.S cover/ grating over the filtration tank) Providing and laying in position cement Cub concrete of specified grade including cost of .meter centering a shuttering, for top cement concrete ring over the well in C.C 1:1:2

0.075

Total ( C )Total cost for open well construction = Rs. ______________

(D) Quotation for construction of rain water drainage work in front of the main gate of IIG, New Panvel , Navi Mumbai
Sr No/CPWD DSR ITEM NO: M.R.

Item description

Qty

Rate

amount

Providing and laying NP- class R.C.C. pipe with mm 30 dia NP-2 , 150 mm dia R.C.C. pipes with collar jointed meter with stiff mixture of cement mortar 1:2 including testing of joints , etc completed as directed OR Excavating trenches of required width for pipes including excavation for sockets depth upto 1.5 meter, including getting out of the material returning the materials as required in layers not exceeding 20 cm depth including consolidating watering stacking serviceable material for measurement and disposal of unserviceable material as directed within a lead of 50 meters. (1) for hard rock / asphalt road and soling ( 45 cm) 30.0 RMT

2.13.1.2 M.R.

Providing and laying in position cast in citu cement 8.13 concrete, grade 1:3.6 all around the pipe including bed Cub.met concrete and excluding centering and shuttering er Centering and shuttering including strutting , propping etc and removal of form For pipe surrounding, two side shuttering Constructing road drain out inspection chamber of internal size, 600 X 600 mm under the road with 75 class designation bricks in cement mortar 1:4, to be covered with M.S. grating, fabricated with angle frame 50X50X5 mm and M.S. plate 50X 5 mm ( 22 nos. of cover plate, + middle angle frame ,sketch enclosed ) including necessary excavation , dewatering during the excavation and course of construction, Bed concrete with P.C.C. ( 1:2:4) and the top concrete ( 1:1.5:3) to receive the iron frame grating cover and fabrication etc. completed as directed. ( a) Providing , supplying , welding and fabricating M.S. grating cover with frame : 77 kg / Grating cover ( b) civil work for Bed concrete , brick work , plastering 35.0 Sq. meter 04 Nos.

5.9.1 Market rates

Market rate

Market rates Market rates

and top bed concrete ring: (i)Excavation ( 1.65 cub.meter / chamber ) (ii)P.C.C. bed concrete 1:1:2 ( 0413 c.meter / chamber) (iii)9Brick masonry work (0.343c. meter/ chamber) (iv)P.C.C. bed concrete (1:1:2) over the top of brick work to receive the angle frame and grating: (0.114 cu. Meter / chamber) (v)15 mm Internal and external cement plastering 1:3 with a neat floating coat of cement( 5.70 sq. meter / chamber) Total cost for (b) = Sum .(i) to (v) = Rs.____________ X 4 nos.= = Rs.______________ Total cost for Four Nos. of chamber = (a) +(b) = Providing and applying bitumen paint over patch concrete of road surface work Providing and applying anti anticorrosive paint to the M.S. cover with frame over the drain out chamber

___________ Lump sum Lump sum Total

( D )Total cost for rain water drainage work in front of the main gate of IIG, open well construction =Rs.

Total cost for the proposed work = (A) + (B) + (C) + (D) = Rs.________________ Total proposed cost = Rs.________________

Total proposed cost in words = Rupees__________________________________________________________ Sign and seal of the contractor